.2 3 July 9, 1980 Docket No. 50 498 50-499 l
MEMORANDUM FOR:
File l
THRU:
w e' f W. C. Seidie, Chief, RCIES Branen w-W. A. Crcssman, Chief, ?mjects Sec-ion V FROM:
W. G. Huoacak, Reactor Inspector, P ejects Section i
SUBJECT:
TECHNICAL MEETING WITH HOUSTON LIGHTING AND POWER i
~
COMPANY, BROWN AND ROOT, AND CONSULTANTS REGARDING SHOW CAUSE ORDER, ITEM NO.1 - SCUTH TEXAS PROJECT, UNITS.1 & 2, DN 50-498; 50-499 At the request of Houston Lighting and Power Company, a meeting was held in the Region IV of#ica on July 3,1980, with the following attandees:
Houston Lichtino and Power Comoany (HL&P)
G. W. Oprea, Jr., Executive Vice President l
R. A. Frazar, Manager, STP Quality Assurance Brown and Root (B&R)
K. M. Broom, Senior Vice President J
1 Bechtal J. M. Amaral, Manager, Quality Assurance-l Management Analysis Comoany (MAC)
J. P. Jackson, Senior Vica President L. E. Zwissler, Vice President Nuclear Reculatory Comission W. C. Seidle, Chief, RC&E3 Branch W. A. Crossman, Chief, Projects Section H. S. Phillies, Resident Reactor Inspec:ce, STP
- 0. F. Fox, VIB Principal Inspector W. G. Huoacek, Reactor Inspector 8506070301 840620 PDR FOIA OLA89PIS4-393 PDR
~
blo-CN50-498;50-499 2-July 9, 1980 The. licenses.and contrac.or recresentaches presented their amoroacn to resolution-of Show Cause Itam No. I related to the licensee's Quality Assurancs program for the South Texas Project (.u.s) wnich is sumarized as follows:
4 As a result of review of their QA program by their consultants (Secntal and MAC), HL&P has chosen to implement an ASME "N" stamo type cf QA organization for STP.
The B&R organization incluoes a quality engineering arm, an insoection am, and an auciting am, in addition to a services am i
and a Houston QA coordination arm.
The HL&P QA organization. has alsor been restructured similar to tne "N" stamp orgcnization and includes a discipline QA am, a quality control arm, an auditing am, and an operations am.
The changes in both organ-izations are intended to overcome problems which were identified as:
5 1.
need to simpl.ify procedures 2.
need to strengthen documentation and analysis of failures 3.
need to strengthen indoctM nation and training 4.
need to strengthen system controls including interface and document contro1 5.
need to strengthen management involvement in the QA program A key aspect of the new organization is the intent to establish a strong quality engineeMng (QE) arm which will review design requirements and establish specific inspection critaMa to be used my QC insoectors to minimize conflic.s between construction and QC.
It is intended that QC inspectors must follow directions provided by QE and that nonconfomanca reports be issued for any deviations identified by QC inspectors.
Similarly, construction engineering will provide specific directions which must be followed by construction superintendents.
4 The organizational structure for NDE has not been defined.
Changes in staffing of the licensee's and B&R's organizations have been made resulting in numerous personnel reassignments.
The most significant of these are the assignment of the HL&P Executive Vice President exclusively to nuclear affairs with STP managers answeMng directly to him, and ne l
l l
4 s
_,,.,..-_.__y_
-_._.-_y
~'
'. fie - ON 50-498; 50-499 July 9, 1980 relocation of :ne MLAP QA Manager :: :ne site :: :rovice :r: gram cirecticn to :ne CA crgani:a:1cn.
A B&R 5enior Vice Fnsicent nas been assigned full time to STP CA matters and is presently a :ing as 3&R CA Manager.
Several critical cr7ani:2:1cnal : sitiens nave teen staffee :y ex:eriencac
- nsultan: personnel untii :;ualifiec cersennel :an :e ni ee and trainee.
- 0),$.5CA W. 3. Hucacek, Rea:::r :ns:e.:r Pr jects Secti n i