ML20126H789

From kanterella
Jump to navigation Jump to search
Requests Investigation Assistance Re 800627 Anonymous Allegations That Designers of Plant Piping Sys Are Not Competent.Allegations Should Be Included in Next Insp of Brown & Root in Houston,Tx
ML20126H789
Person / Time
Site: 05000000, South Texas
Issue date: 07/18/1980
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML17198A238 List: ... further results
References
FOIA-84-393 NUDOCS 8506100412
Download: ML20126H789 (1)


Text

--

= _. _

..a r.

4;-

i-a-r t

l July 18,1980 Docket No. 50-498 l

t 50-499 l

t t

M MORANDUM FOR:

K. V. Seyfrit, Director FROM:

W. C. Seidle, Chief RC&E5 Bra'nch i

SUBJECT:

RE@EST FOR INVESTIGATION ASSISTANCE PER REGION IV i

POLICY GUIDE NO. 848(4/9/80)- ALLEGATIONS BY AN ANONYMOUS SOURCE OF SOUTH TEXA5 PROJECT, UNITS NO.

1 & 2. DN 50-498; 50-499 1

i

{

The HQ Duty Officer mdived a telephone call from an anonymous caller on

)

June 27, 1980, in which the caller alleged that the designers of piping systems for the South Texas Project am not competent. An extract from l

the Duty Officer's log was attached to a letter of transmittal and forwarded i

l to Region IV. A copy of the log estract and the transmittal letter, H. D.

j Thornburg to K. V. Seyfrit, dated July 8,1980, is attached.

i 4

l Tite seject of the allegation is similar to that reviewed by PES, V!S during their nomal inspection activities of the Brown & Root Houston office 'on i

i June 16-20, 1980. The subject / allegation Item No. 11, contained in a letter from an anonymous source, was received by the Region IV Director un June 13, i

1980, and refers to stress evaluation by Brown & Root. A copy of this letter i

from the anonymous source is also attached.

It is requested that your investigatory staff investigate this allegation in conjunction with the previous ones desionated in our letter to you on June 30, 1980. It is suggested that this item a so be included in the next inspection of S mwn & Root. Houston by PES, V!B.

j

,,g,;gina. 3 y a 4 R. L ble L*'

\\

W. C. Seidle, Chief Reactor Construction and Engineering Support Branch j

fl

.Attachmentst 1.

Memo, H. D. Thornburg to X. V. Seyfrit i

dated 7/8/80, with Log Extract

)

2.

Latter from anonymous source snoel 12 e40620 cc: w/ attachments PDA A

Vender Insoection Branch et.AseP

-3'P3 PDM C 5e.i.d l e... f...............

l 0,nic 8 ).....R IV.

l sumace g.WA..c ro.s.s.m. an./..nh.

I Saftk.7/l$/$Q.

7/l$/SQ.

.4

...........n 1

hat CO#M att il 's

.dd!!.4

$'w $< 4avi ANMC*#f petNflPeo 08PICE 1979 809 849