ML20129J245

From kanterella
Jump to navigation Jump to search
Discusses 790612-14 Investigation of Allegation Concerning Missing Radial Reinforcing Steel Around Reactor Containment Bldg Equipment Hatch.Concrete Pour Cards Reviewed Did Not Indicate Radial Reinforcing Steel Missing from Hatch
ML20129J245
Person / Time
Site: 05000000, South Texas
Issue date: 07/05/1979
From: Hubacek W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML17198A238 List: ... further results
References
FOIA-84-393 NUDOCS 8506100042
Download: ML20129J245 (1)


Text

(

D tanes

+*p UNITED STATES

,,og NUCLEAR REGULATORY COMMISSION h'

g REGION IV j

a sit lYAN PLAZA DRIVE,SulTE 1000 D

ARLINGTON. TEX As 7s012

,o Docket No. 50-498

~

l MEMORANDUM F0 ' File THRU:

W. C. Seidle, Chief, RC&ES Branch sa/tec W. A. Crossman, Chief, Projects Section FROM:

W. G. Hubacek, Reactor Inspector, Projects Section

SUBJECT:

ALLEGATION CONCERNING MISSING RADIAL REINFORCING STEEL AROUND THE UNIT 1 REACTOR CONTAINMENT BUILDING EQUIPMENT HATCH, SOUTH TE. S PROJECT u

DN 50,-498 On June 12-14, 1979, the undersigned investigated an allegation concerning missing radial rebar around the Unit i RC3 equipment hatch.

(The allegation was on a tape which was forwarded to RIV by IE HQ.) During the course of the investigation, concrete pour cards and related documents for placements CSI-W7A, CSI-W8A, CSI-W6A, CSI-W8E, CSI-W8G, CSI-W9A CSI-W9E, CSI-W10A, CSI-W11A, l

CSI-W12A, CSI-W13A, CSI-W14A and CSI-W15A were reviewed. None of the documents reviewed indicated that radial reinforcing steel was missing from the equipment hatch.

Responsible licensee and Brown & Root representatives stated that they had no knowledge of missing reinforcing steel.

This allegation was not substantiated.

w~

W. G. Hubacek, Reactor Inspector Projects Section cc W. A. Crossman C. E. Wisner l

I l

OLA08PI54-393 PDR l

l

-