i November 5, 1981 MEMORANDUM FOR: John T. Collins, Deputy Director FROM:
W. C. Seidle, Chie.f Engineering Inspection Branch
SUBJECT:
SUGGESTED QUESTIONS TO ASK OF HL&P 1.
Will HL&P impose a stop-work order on all new and repair-type work pending selection of a new QC and construction contractor?
~2.
If the answer to question 1 is no, then until a new QC and construction contractor is selected will any new work or repair work be perfomed at the STP site?
3.
What is the cut off date for Brown and Root as constructor and manager of QC?
4.
During the transition between constructors, who will perfom the i
following jobsite activities?
a.
maintenance of dewatering system b.
maintenance of installed equipment c.
receiving and warehousing 2
d.
preventive maintenance of stored equipment I
e.
maintenance of records vault and continuation of document control f.
maintenance of fire protection system g.
general housekeeping l[j_
%g, 4 h.
maintenance of roads l,jl 1.
maintenance of ditches / drainage runoffs to preclude flooding h
j.
maintenance of construction equipment 1
8506070493 840620 PDR FOIA OLA88PIS4-393 PDR l
o"'+..
h
" "*y 33757g3 3.. p
~
John T. ' Collins November 5,1981 5.
Who will provide the QA/QC coverage, as appropriate, for the activities identified in question 4 above?
J 6.
Will security be beefed up to protect stored and installed safety-related components, systems, and structures?
misinet sisnad
- g g. SggpLE" W. C. Seidle, Chief Engineering Inspection Branch cc: