. -fi..

i, i

I October 30, 1981

)

l

' fMcket lies. 50-498 I

50-499 s

i

\\

t iT;0PA Dtri FOR:

G. L. !hdsen. Chief. Reactor Projects Branch j

4 TI:nt!:

W. A. Crossnan. Chief. Project Section 3

(

. FR0!;:

11. 5. Phillips. Resident Reactor Inspector. STP l

SUBJECT:

RE510ENT INSPECTOR'S CONCi!TARY AUGUST SEPTDeER AND OCTOBER 1981 i

Resident Inspection Procram Results i

j The Resident Reactor' Inspector (RRI) was on sita during regular duty hours free; August 1 through October 31. 1981 except as follows:

. August 5-7 RIV NTEU Training 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> i

. August 17 Inspection of HL4P Houston l

Bulletin System 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> j

. August 10-21 Investigation of Allegations, j

Review of Quadrea Report 32 hours3.703704e-4 days <br />0.00889 hours <br />5.291005e-5 weeks <br />1.2176e-5 months <br /> i

. September 1-4 Region IV Meeting 32 hours3.703704e-4 days <br />0.00889 hours <br />5.291005e-5 weeks <br />1.2176e-5 months <br />

. September 5 Travel RIV (voluntary time 5 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />

~

j

. September 7 Travel RIV (voluntary time j 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />

. September 6-11 RIV-E &P Meeting on Quadrox/

d 1

RIV SALP Review of STp 32 hours3.703704e-4 days <br />0.00889 hours <br />5.291005e-5 weeks <br />1.2176e-5 months <br />

{

. September 14-1C Houston Hearings 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> 1

i

. October 5-g Equipment Qualifications Seminar 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> i

. October 12 Holiday 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />

}

. October 16 RIV-HL&P SALP Meeting 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> j

The RRI spent 132 inspector hours on site as follows:

1 Mod, ' e 9 M act Aueust See". amber October j

JD7 M C Meetings I

3 o

i g27028 Follow-up Inspection 5

8 m

l g27068 Independent Inspection 11 2

16 t

j 47063C Containment Concrete 23

/

5007K Safety Related Cosponents 2

2 5

5105X Electrical 2

2 53083C Welding Safety Related Piping 2

1 86063C Welding Structural Steel 11 11 8,

j

.___t23st..._Buiteyne i

s"an> RRI RPS 3 RPS3.

... itPg'.......,......

i d

540630

L * "."' *.,' '3'

'HSPhillfTp ltund WCros n l. GLMadsen,.......

t

-393 PDR 10/30/81

.11/.. /81.

.11/ ',/81...

O

Memo to Madsen 2

October 30, 1961 The preceding paragraphs show that the inspector was on site approximately half of August and half of September 1981. Additionally, some time was spent packing office materials in order to report to my new assignment on October 5.1981. As you know. try Pt.I assignment was extended to allow additional time for obtaining l

a new RRI.

I resweed routine inspection on October 14, 1981 after the training j

seminar and the holiday.

Status of R!V Task Force and Other Follow-UD Inspection During the sutiject inspection period, follow-up inspection of the licensee's I

responses and corrective action relative to Investigation Report 79-19 unresolved

. items and show Cause Order items was perfomed. The Following is the status of these items as of October 31,1981:

i Status of Investination Report 79-19 & Show Cause Order Items I

13 Point Letter *-

0 13 i

9 point Letter 0

9 l

Moncompliances 0

22 l

Unmselved Items 0

30 Show Cause Iteam 1.3.4.9 2.3.5.6.7.10 See next peregraph for details.

HL&P Correspondence (ST-HL-AE-533) dated Septem6er 18.1988. listed all comitments relative to Show Cause Order items. After appmaimately four-teen months, of the 236 casuritments there are appaninately 12 that remain t

open pending NRC review of final corrective action / implementation by the licensee and/or contractor. The following is the status of all open items:

1 phillips A181. M4 HL&P Audit H8R 43 not closed.

2 Tapia All Closed l

3a Tomlinson A45. A44. A49. A74 Licensee not ready to close.

3b Tapia All Closed 4

phillips All Closed 5

PM111ps All Closed

)

6 Phillips All Closed 7

Hubacek All Closed l

8 Hubacek A142. A143. A147

!aplemented but must be in A148; A149 place for sufficient amount of time.

9 Phillips M and M42 (reopened)

Reassessment of staff level incomplete.

Items 1 and 9 remain open because of pmblems discussed in NRC Report No.

81-30, paragraph 2 and NRC Report No. 81-07.

~ ', ~

Items 3e and 8 russin open in9 the licensees final action / implementation j

~,

of the cemitments listed ve.

....i i

_ _ -. -. - -. - ~ -. _ _ _

e, r;

e i.

l flamo to Madsen~

3 October 30. 1981 i

j Status of Other Ooen Items l-The following is the status of the close out of unresolved items, violations t

and construction deficiencies as of 11RC Report tio. 81-31. dated October 5 I

1981:

STATUS 4

0!L INSPECTOR' LIC. FINAL NRC FOLLOW-N0.

ITEM 5tEJECT AS$!GNED REPORT UP COMPLETE 8

CDR Undersize Hold Down Studs for Tomlinson Yes No Accumulators.

9 CDR Installation of Anchor Bolts Tomlinson tio No Fabricated from Incorrect Material.

13 CDR Inadequate Supports of Emer.

Hubacek Yes No l

Pump Recirculation Lines.

l!

(reopenedbyRegisnIV) 14 CDR Inadequate Vendor Surveillance.Tomlinson Yes No 20 CDR Unit *1 M Steam Generator safe Tomlinson Yes No End Helder Crack.(not reportable) i i

i 22 CDR B&R Audit Identified Problem N!A Yes No l

I in A5pf Welding Work Stopped.

l 28 CDR Defect in Cont. Gas Analysis Phillips Yes No j

System Part 21 Delphi system Division.

I 30 CDR Breakdown in Procurement QA Hubacek No No Cycle at Six Vendors.

l 32 CDR Min./ Max Density Test on ECW Tapia No No i

Backfill No Test on Backfill under 30" & 10" Essential Cooling Water Line.

33 CDR Diesel Generator Exhaust Fan N!A Yes No Motors.

?

1 35 CDR Acid Etching Unit 2 RPN Qutlet Tomlinson Yes No NozzleSafeEnd.(notreportable)

RPT.

i 80-11 U Qualification of Level QD Martin Yes No Inspector.

40 CDR Spent Fuel Racks Dimensional NIA Yes No 1

Error.

t 41 U

Consip Pop Shaft Failure Phillips Yes No Part 21.

i 42 CDR Design of Aux. Feessater Pup. NIA No No (All environmental factors j

not considered in design) i 43 CDR 5 team Generator Supports &

NIA Yes No 1

Harduare Identification Name j

Plate Did Not Reflect Class 1 as indicated on NR2 Code Date ReportForm.(notreportable)

I a

so

Meno to fladsen 4

October 30, 1981 i

STATUS OIL INSPECTOR LIC. FINAL NRC FOLLOW-40.

ITCt' SUCJECT ASSIGNED REPORT Up COPLETE 45 CDR Dreakdown in OA Program relative NIA No

!!o to application to paint to steel & concrete surfaces except for liner plata.

46 CDR Reactor Containment Bld NIA YEs

!!o Structural Steel Beams.g.

(fomarly Item 7) 47 CDR Unacceptable Surface Condition NIA Yes No l

of Weld in Main Steas. Piping &

Secondary Shield Wall Whip t

i Restraints.

i 48 CDR Cooling of Primary Shield Wall NIA Yes No Penetration Insufficient Air Flow Between Reactor Coolant Nozz S & Seal Plate.

49 CDR Inadequate Design of Field HIA Yes No Sketching & Calculations for Cable Tray Support.

RPT.

i 01-01 E Steam Generator Nitrogen Phillips Yes No l

Purge Removed.

i 51 CDR American Bridge Structural Phillips No No Steel Welds Deficiencies.

52 CDR Westinghouse 21 Related to NIA Yes No Potential Errors in Steam Generator Water Level Measure-ment System with High Temp.

53 CDR Non Approved Hilti Anchor Bolts HIA Yes No by B&R by Revised QA Manual.

1 RPT.

81-12

,t_>=

Internal Surveillance & Sub-Phillips No No r

contracts Surveillance Mech.

1 Section.

54 CDR Concerning Certain Faulted N!A No No Conditions Heat Loads in Design 1

of Portions of HVAC System.

4 55 CDR Concerning Computer Program NIA No No Verification.

56 CDR Concerning Shielding Analysis NIA Yes No Verification.(not reportable) 57 CDR Westinghouse EMD 4" Gate Valve N!A No No 4

a l

t e

..,..-.-.,n-

(.

c, c'

T Mer.e to fladsen 5

October 30. 1931 STATUS

.O!L INSPECTOR LIC.FI!iAL liRC FOLLOW-fl0.

ITEM SIN ECT ASSIGNED rep 0RT UP COMPLETE RFT.

'01-19 g B&R Implementation of the Tapia

?

ile Coating Repair specifications.

81-19 E Test Results to be VeHfied Tapia

?

Ho on Top Coating.

58 CDR Breakdown in R&R Owg. Control.

!;!A Yes No 59 CDR GERelays(H8)TodsonSpMngs.

H!A ilo leo 60 CDR Electrical Penetratione N!A fio No Damaged.

NPT.

81-29 y, Failure to Properly Record Gilbert Yes No Vision Examinations 81-29 g Welder Qualifications Prece-Gilbert

?

No dure Not Per ASM Code.

81-30 g Amerfcon SHdpe AWS Welding Phillips No No Vs. BAR Procedure QAP-10.5.

Note:

It is recessended that RIV supervisors assion the NIA items (No Inspector Assigned) to the appropM ate discipline <nspectors.

Status of Bulletins The RR1 perforsed an inspection in the HLap Houston Office and on site.

DuM ng this inspection documented in NRC Report No. 81-32. the licensee's system for handling bulletins and circulars was reviewed.

Results of the review indicate the licensee has an effective system for handling the bulletins and circulars and action had been taken on bulletins and circulars applicable to the South Temas Project.

The RR1 reviewed individual bulletins and licensee responses for calendar years 1980 and 1981. All responses were c nsidered adequate. Based on this review the necessity of. NRC follow-up inspection to berify hardware corrective action and/or design changes was as follows:

RuUntitLDL NRC Inssection Follow-lat Ramutred

jjgg, 80-03 No-NetApplicabletoSTP(N/A)

Completc 00-05 Ves Inspect vacum relief valves pH or to plant operation.79-03A Ne-(N/A)

Complete 80-06 Yes Review sample of retto-graphs of flued head weld joints.

No-(N/A)J No-(N/A Complete 80-09 Caneleto 80-16

....[

1 e

e

  • .g'.

a s

?

a 8

i Meme to Nedsen 6

0:tober 30. 1961 l

i bulletin No.

NRC Inseection Follow-us Reevired

],tg}gg, 20-18 Yes Review licensee calcula-tions modifications etc.

i near 11censin9 time.

l NoqH/A;l 80-19 No-couplete

}

80-20 (N/A,1 Complete j

S0-21 No-l N/A Couplete l

He-d;/AJ,1 60-23 Camelete 81-02 Yes Verify hardware corrected prior to start up.

81-03 No(N/A)

Conglete l

Note: Discipline inspectors should be ass 19ned for follow-up en in-i j

complete items.

i Recien Inspection Procres Results i

i L

=

(

Inspectiana PerformedP 1

Oste Report Nonseepliances/ unresolved Insa.

No.

Ins:;;cter Manheurs Am: Innsected i'-

Ife11r = inanections. l 8/17-81-29 Gilbert 26 30703.927068 ene violation. one new j

20/81 551828,551848 unresolved matter.

551875. 551888 i

i-9/8-81-31 Tomlinson 21 30705, 92703 No new itses, no old j

11/81 927068 items closed.

i 7/21-22 4 l

i 9/15-i I

17/81 81-25 Hubacek 36 30702, 9270M No new items closed i

Show cause Order Item 7.

j j

10/19-i 23/81 81-34 Tapia 27 30705, 927028 One50.55(e) closed.

Tomlinson 27 927008 4

o j.

1 i

4405 2 80 May be able to inspect and close since most j

of work esoplete.

j 480558 80 May be able to inspect and close since most j

of work eemplete.

4806M &

30 Should be able to close. Any other work 4006M 20 could be inoposted meer 48054/40065.

i 440648 0

Should be opened?

4806 5 0

Should be opened?

49051-548 0

Assee reacter coolant boundary pipint i

l,'

inspection perfemed under new precedures?

l 1

490614 0

This inspection done under new procedures?

j i

l i

=

u r

o!

Nemo to Madsen 7

October 30. 1981 M

t Complete Costnant

'l l

490638 0

This inspection done under new procedures?

l 490656 30 This inspection done under new procedures?

i

-58051C 10 Work Completed in July 1979. Should submit 766 and close.

500538 70 Work Completed in July 1979. Should submit 766 and close.

50055B 10

' Records should be reviewed and close.

55051C 100 Containment structural steel welding complete.

550530 100 550550 100

. 55041850618 20 Structural Steel work is largely couplete.

l 550C30 59 i

550650 0

551518 thru Based on work in above structural steel 5515E 0

orocedures some work should be shown under these or close out if complete.

5517M 20 The licensee has proposed new ASE work l

in this area. RIV inspection should perform inspection when work resumes.

(

551758 0

Ditto 551768 0

Ditto 55182 0

Ditto 551858 0

Ditto I

551868 0

Ditto

[

i h

I t

460550 90 Could be closed since work couplete.

l 530558 0

should be opened.

480618 0

should be opened since site work is well advanced.

t 4806M 0

Ditto 480658 0

Ditto 560618 0

Ditto 55063 0

Should be opened since work advancing.

550658 0

Should be opened since work advancing.

550618 20 This should be complete or near camp etion.

l 5506 5 0

Inspection should be well along.

550658 0

Some records should be reviewed.

l 551518-i l

551588 7

Perhaps the preceding precedures can be i

closed and rescinder of inspection can be l

accomplished under these new procedures?

l l

The above myiew of program status is based on 766 data, dated 7-30-81.

l RIV inspectors should consider these consents and mcosmondations in order to assum that MC 2512 inspections am perfomed in a timely sonner.

l

,s j

a y

i Mene to Madsen 8

October 30, 1981 I

Construction status Licensee construction work has continued to lag behind because of design problene. DuM eg this peM ed the licensee announced the replacement of the M ($rewn & Root)aand announced that Bechtel power Corporation would become E as well as assume QA and Project Management responsibility. This will occur dud ng the next twelve to eighteen months and will affect the schedule.

l Monpower remains at approximately 2.700, the same levels as reported in the l

July 1961 RAI consentary.

(

The RR! has noted some slip in the storene and maintenance of material and

' equipment but conditions still meet requ' raments.

Hish11ehts of sita Related Activities i

Aunust L7-21

. Invesutgation gt'taybrook. Housten and first NRC review of Quadron.

. Gilbert en site for routine inspection.

I d RIV en preliminary conclusions based on incomplete review 6f Quadron Report l

.RR!completedGundronreNewandbHefedRIVenAugust27th. ARI concluded that if prehless as severe as Ouedres Report descHbed the gresent M would need help from another M or may need to be replaced.

c

.n- _.i that special R!V team detefulne if findings are valid.

i V on site to review Quadrea Report.

meeting when NL&p Management bM efed RIV Management on Quadrea Report and design engineering problems which would cause delays of twelve to eighteen senths.

l site to perform fellow-up inspection.

I ten en follow-up inopoetion/ review Quadron Report.

1_ogation en calibration lab.

call from Dana Tuffle', port Lavoca Wave reporter. She inquired about drawings ispeanded.

. Received call from Candice Hughes. Amedeen Statesmen reporter, to ask about M change. '

\\

j

i i

?

o e,

o n

Mene to Nedsen 9

October 30,19C1 i

jgptember 24-continued t

. HLEP notiffed me tnat AE would be changed and news release would occur l

at 4-4:30 p.m.

l

. Received call from RIY notifying me that ny RRI ass 1Dnment at STP would l

continue until January 10, 1982.

l Sestember 30 l

. teceived same allegation on calibration lab from different alleger.

1 l

October 15

. J. 5ntezek. Director Region and Resident Inspectors Program on site for tour.

October IC

. su reeting at HL&P.

Oc"ober 19-23 "spia and Tomlinson on site to perform follow-up inspection.

October 21-22

. Herr investigation of calibration lab allegations.

Oct h r 23

. R H received preventive maintenance allegations.

[

i l

. RRI received allegation that SSR destivying records.

This comentary is more detailed than usual. The purpose of such details is to provide the future RRI with a current status of the project. Additionally, copies of the comentary am furnished to the Engineering Inspection Branch for information and for scheduling future inspections

/

y' o sd H. 5. Phillips Resident Reactor Inspector South Texas Project cct W. Seidle R. Hall 4

i t

t l

t

-l e

d 8

e

,