December 19,11980-i N
l s
e 1
+
N MEMORANDUM FOR:
W. C. Seidle Chief, RC&Es Branch 4
'THRti:
W. A.: Crossman, Chief Projects Section.
FROM:
.H. S..Phillips. Resident Reactor Inspector, STP
SUBJECT:
i RESIDENT it!SPECTOR'S C0fHENTARY
' NOVEMBER - DECEMBER 1980
.~
I The Resident Reactor Inspector (RRI) was on site during regular duty hours from November 1 through De, comber 31, 1980.except as follows:
6
. November 4 Travekto RIV and meetings
. November 11" Holiday 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />..
. November 2G27 Holiday 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> and annual leave 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> I
. December 1-5
' Travel to RIV and meetings
. December 8-12 Annual leave,40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br />
. December 22-31 Holiday 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> and annual leave 48, hours, Hich11ohts of Inspection Period l
j Nov. 3-7
~. '
RIVshowcauseTaskF,orceInspector(Tomlinson)onsite.
. ;{
Nov. 3 HL&P letter reques.ted restart Com' plex Concrete Placement.
Nov. 4-6 RRI in RIV offi:n-to meet with Headouarters lawyer and 'IRR Program Managne.
Met with Branen Chief. Section. Chief Hubacek and Tapia. -
RR sent October report to RIV SNM "4"
GL AmePlog-w:; pon l
flov. 17-21 TwoRIVTaskForceInspectors(HutiacekandGilbert)onsite excent one inseactor on site durino paried of 17-19.
,r' RIV dudab
- hab4, shm1EsEi"""QXGiss unc
- n. m.,inau
s l
Memtrto Seidle 2
December 19, 1080 l[
l
~
Nov. 18
.i.
4 f
RRI input to RIV for meetino between RIV Director and HL&P/ CAR Management.
i.
j Received telephone call from Ross Landsman, RIII inspector, after j
i Ray Hall, RIV. Supervisor, discussed closing of soil items with l'
D. 11. Hayes, RIII Supervisor.
RIII inspector asked what the calls I
were about.
I stated that. technical differences should be discussed /
resolved before the hearing. He' agreed.
I said he should call Joe Tapia. He said he would.
r Nov. 19 l
HL5P letter ST-HL-AE-575 to Resure ASME Pelding.
l RI!! Supervisor and Headquarters lawyer on site to talk to J.. Barker, fomer RI!! Operations Inspector, and be present when Comonwealth
+
I
'?
Edison lawyers met with RIII inspector..
j
. f. RIV Inspector debriefed with Licensee.
j 1
Nov. 20 j
D. Barker, HL&P Project Manseer, came to my office. Stated that RIV inspector would not recomend resumption of ASME Welding. Dave
. said, "We do not agree technically with the RIV inspector. We do l
not see how this impacts our resuming welding."
I did not know what
)
he was~ talking about since the RIV inspector had not told me he was
~
i holding up ASME Welding.
j Met with L. Wilson, HL8P Discipline QA Supervisor and he said he i
would meet with Project Manager, i
j R!V inspector in travel status back to RIV
~
i i
Licensee stated the info and any necessary sorrecttons would be carried to RIV by courier service.
l Nov. 21 l
Info handcarried to R!V.
Received call from RIV management advisino RIV inspector received material and all was satisfactory.
RRI was asked for recomendation.
RR! recomended resumption if RIV inspector's' review was satisfactory.
4 RRI was requested to follow up on ASME Uelding restart since start I
would be slow and because the holiday was in that week, RR! a reed.
j RR! reviewed status of Show Cause Order Item Comitr'ents in HL!P j
letter dated Seotember 18, 1960. flone we m closed. Licensee stated none were revi,ewed during the week of the inspection. Further review i
detemined two problem areas relative to mstart (1) Licensee placed j
a " Hold" on part of weldino just requested in 'lov. It',1980 letter.
l (2) Paperwork" problem"alsonoted.
RR! called Project Section Chief to relate concerns identified and l
asked that a " Hold"'be placed on the letter until these tatters could be cleared up. The RR! was advised that the letter had l
already been sent out.
1.e J
tt.ti.9nA.I...&.!E mvia!..dtt.tte net..thA.t... ten.1 l..nf.1.h ?.53J.hoo tain....,...................)
ah lycontro11 76# YiF6'-
la is anc carton sVssi areas w ire not proper l
mis - eta tun"reevfred< es4er eed'iw-#" tech"Mrt"t reltwre"fmr+ vithewt=~a "aa--~
~.
4
.-dr mfA.CQI.Qt e...F,. 4.O.l.9.tt.ly.. 9 U.titd......D.f., 'tCCtt.itt..'.10.-5.....VM.............................,
g.g g.
wum o g,
.gg, y,, g,,;;.n mm.
MGsic to Seidle 3
December 19, 1980 Nov. 24 cent.
Met with Licensee to debrief on the Fab Shop inspection. Licensee reviewed the area the same day.
flov. 25 Licensee advised RRI that all welding in the Fab Shop had been stopped until. tool control could be re-establ.ished.
RRI notified RIV Supervisor.
Dec. 1-5 Travel to RIV Meeting with Branch and Section Chiefs on concerns identified after RRI had recommended resumption of ASME Welding.
Met with NRC STP Coordinator on testimony and gave notes and ideas on developing testimony. Coordinator stated he would develop an outline and RRI could give more input after reviewing the outline with Headquarters lawyer to assure if the. approach was in line with their request.-
RR! meeting. 'Use of Governessetvehicles was discussed in detail between RIV Residents and management. including RIV Director.
Dec. 8-13
[,
., Annua' Leave.
x-Dec. 22-31 Annual Leave.
Construction Status The level of work remains about the same as'1ast reported in the same areas.
StopWorkOrderremainsinforceforconcrete,howeveY.theNRCletterdated November 21. 1980 allowed the licensee to restart work on ASME Welding.
The construction completion percentates for Unit No.1 is 595 and for Unit No. 2 is 221.
Fuel load dates remain approximately the same astthose reported in August.
Construction Deficiencies Reported (10 CFR 50.55e)
Novenber - none Two(2)potentiallyreportableitemswerereportedfromDecember 1-19. 1980.
. Inadequate Design Review of Cable Tray Support Sketches / Calculations.
. Hilti Expansion Anchor Bolts Inadequacys e
a4
' Memo to Seidle 4
December 19, 1980 Resident Inspector Procram Results The RRI spent 58 hours6.712963e-4 days <br />0.0161 hours <br />9.589947e-5 weeks <br />2.2069e-5 months <br /> on the following:
'lovember Module Subject Hours
- 30703C Meetings 2
92702C Follow Up 26 42051C Fire Protection 2
40053C Containment Steel 2
48063C Structural Steel 2
49053C RX Coolant Boundary Piping 2
49063C Safety Related Piping 2
50053C Vessel Insta111on 3
50063C Vessel Internals 3
50073C Safety Related Components 2
51053C Electrical Components & Systems 2
51063C Electrical Cables 2
52063C Instrumentation 2
i 53053C Contairment Penetration 2
55063C Structural Welding 2
1 55053C Safety Related Welding of Piping 2
December 30703C Meetings 2
92703C Follow Up 6
3 All follow up inspection effort related to follow up on Investigatio 79-19 and Show Cause Order items.
Routine "C" inspection was performed as noted s
above.
Status of RIV Task Force Follow Up Inspection During the last tk months follow up inspection of the licensee's response and corrective actions relative to Investigation Report 79-19 noncompliances, unresolved matters and Show cause Order items was performed. The following,
is the status of these items:
Subject Open Closed Coments Noncompliances 0
'22 Unresolved Items 3
22' 79-19-02, 14, 23, 25, 35, 37, 44 and 49 remain open.
Licensee not ready to close i
in most cases.
79-19 Open 3
3 Only 79-19-041 05: 06 and Allegations 07 remain open.
13 Point Letter
)
13 None 8
Memo to Seidle 5
December 19, 1980
,, Subject Open Closed Coments 9 Point Letter 0
9 None
~
Show Cause Items 1,2,3, Items 4, A major portion of the 6,7,8,9 5,10 objective evidence for Items 1,2,3,6,7,8 and 9 has been reviewed. The nature of some of the comitment will cause these items to stay open well into 1982 unless we can close some of the Show Cause items with-out being sure the comit-ment was implemented.
~
Recomend Task Force / Management meet to decide how to handle items which will remain open for 1-2 years. Will the Show Cause Order stay open for two years?
The follow up inspection is still considered the number one oriority since one annot reasonably and logically do routine "CY ptotram work until corrective actions are completed. Thus the RRI will continue to perform follow up inspec-tiondaring the January,1981 inspection' period and "C" inspection the balance of'the time.
\\
l l
H. S. Phillips Resident Reactor Inspector South Texas Project Project Section a