%v' ARLING10N, TL x AS 76012 July 7,1980 MEMORANDUM FOR:
File FR0",:
R.
Y,. Herr, Inve,stigation Specialist SU50ECT:
UiDATED LETTER 'FRD:: A!;0 YP.005 I;;IGOUAL CCiCER:;I:iG STF On June 13, 1980, a letter from an anonymous source containing eleven Director, Region IV. allegations in regards to the South Texas Project was received Tne following is an analysis of the allegations, and the feasibility of an investigation.
ALLEGATION NO. 1 A.
Vague - unknown correspondence.
B.
An investigation would involve pulling samples from B&R and HL&P Department files (personnel, engineering, audit, construction), and interviewing various people associated with the NCR, memos, letters, and general correspondence.
C.
Probability of success - remote.
ALLEGATION NO. 2 A.
Not enough detail - vague.
B.
documentation section.Could be problems in either Receiving Department, Ve C.
Would need to review all correspondence, memos, letters, NCR, CAR each department head files plus samples of correspondence from vault
, of records.
D.
vendor's management, or HL&P management did not s E.
Probability of success - remote.
8506070338 840620 PDR FOIA GLASSPIS4-393 PDR
~~
8,:
5.;..
- v.,
File 2
July 7,1950 ALLEG* TION NO. 3-A.
Unclear type of audit.
B.
Would need to review vendor audit, site audit, HL&P audit, and S&R internal audit.
C.
This allegation is addressed in investigation report 50-498/50-499/79-19, and is currently being reviewed by NRC.
ALLEGATION NO. 4 Tnis allegation is addressed in investigation report 53-498/50-499/79-19, and is being corrected under the Show Cause Order (retrievability).
" ALLEGATION N3. 5 Tnis allegation was addressed in investigation report 50-498/50-499/79-13.
Tnis is a current problem being corrected and moni*ared by RRI.
ALLEGATION NO. 6 This allegation is addressed in investigation report 50-498/50-499/79-19.
This is no longer true, B&R is currently employing experienced personnel.
ALLEGATION NO. 7 This allegation is addmssed in investigation report 50-498/50-499/79-19. This is true.
Turnover is continuing as more experienced personnel are being hind.
ALLEGATION NO. 8 This allegation has no current merit in that both QA managers (HL&P and B&R) l have been replaced subsequent to receiving the allegations.
ALLEGATION NO. 9 This allegation is incorrect /not true - both B&R and HL&P have assigned personnel, who are responsible for discipline.
ALLEGATION NO. 10 This allegation is questionable.
Site QA supervisor, at time of letter writing, has been replaced. Whether or not nuclear experience is required is unknown.
k
~
i.{:
pq1e 3
July 7, 1980 DISCUSSION l.
Allegations 1 and 2 are so vague that the time an'd effort required compared to the results is at bqst tentative.
4 2.
Allegations 3, 4, 5, 6, and 7 have been addressed by previous investigations and/or currently in the process of being corrected.
3.
Allegation 8 - no longer has merit.
4.
Allegation 9 is now incorrect due to current reorganization.
5.
Allegation 10 infers that supervisors and engineers need nuclear experience before they are qualified. Also, the individual identified has been replaced.
RECOMM'ENDATION That no extensive inlestigative effort be extended unless alleger is identified and/or more detailed inforination is obtained.
R. K. Herr Investigation Specialist i
j I
i j
i i
e
g.,
.t.
g b
.'.. : ( < :... n: gu lci:.ny c c ::.:. i s.: a t.r..
s l'lec se !.c L: us.
.a cLc i;secic: ic crcticudge t. n : L ic s /c'cli ck ir. c'ics in cun c :. :, : : :. ic r. :.t <.;; L 's c : i: '
C.
- r. :. :.. ~. ::. i c i e n. r. i c n vir. c n
.::i:-.
-s:. cu......:;;. s=::
.c.. :,. n. : c i t.s c4 :...c i: Lcsc
.e i ; e !. :.c.~. i
- i :.h c i.. lac ci i cr. t f./. c y ic'cr. i li;: :.n ihe isst supiicn.
5.
Audits cn E.: cur. l Rcci cac con celled cn acsincnzd uAcr.
}nclicas c.re Lcun'd.
4 Uc have inled ic re.i.:icyc ac ccads ihcl shcv nu=cnicus CA
< :. -: s >,< cc pr c u t en t-suc
><nt ~ r. c: =cy s c ~a.scas ic nc~,
c on ~, c in c.
sc. ict nunteri cnd thenclcre one nct ir.the necenis dentz.
TL:. i :.t r. sc l.::: :;. da cic..ciii nci i.c c;: up ie c'cic can 7 AR and icli us ut==st cc= ply ca ly le the ~:AR.
L.
7.c a c adle s<
cl :.hc r. = = :.c n el.:ccucsi a nc=c t. A. Civil,
.~t chan i cci, Electical, and pur chasir.g uill not nine cxpc.zicnc e pensonnel.
7 The CA dcpantacal is Leocain g like ElR En gincerin g, thein is c constant tur.n cuer. ci personnel and nc one is acccuntclic a
c.yncnc.
E.
The LA canagen is intimidating his ccologics.
They cas alnatd ic de thein joL.
t.
h's i P cr. E l i dccs nel Acue cny cnc responsillt lcn scat al L. l.< n g an d a.n a, ts c c, < cn.
,.u-,
che c.: t : < c c l c..e s s p l <.nct sucs et e
it.
Suec avis cr. l.1cn a gen s and Freject Er.pinccas onthe STP have ncycn had any nuclean expanien ce.
Icn example the sitc0A Sunc.-hispa c r..gs t-cs c n on cLpace en.j.,, L u t c u c e, an.j la cl.t anypacvicus expenien ce.
I,e l'LcCac anucsr,sg:=:c i
- ,4.' n L.: 4 c;*: !s'i. i 4 4r. e c r. P i p E *. g.
o
.