|
---|
Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20196J3291999-06-28028 June 1999 Comment Supporting Proposed Rule 10CFR50 Re Industry Codes & Standards ML20206M7291999-04-30030 April 1999 Comment Supporting Draft RG DG-1083, Content of UFSAR IAW 10CFR50.71(e). Licensee of Listed Plants in Total Agreement with Comments Provided to NRC by NEI HL-5717, Comment Supporting Proposed Rule 10CFR50,52 & 72 Re Changes, Tests & Experiments.Util in Total Agreement with NEI Comments to Be Provided to NRC1998-12-18018 December 1998 Comment Supporting Proposed Rule 10CFR50,52 & 72 Re Changes, Tests & Experiments.Util in Total Agreement with NEI Comments to Be Provided to NRC HL-5715, Comments on Proposed Rule 10CFR50 Re Monitoring Effectiveness of Maint at Nuclear Power Plants.Util Is in Total Agreement with NEI Comments1998-12-14014 December 1998 Comments on Proposed Rule 10CFR50 Re Monitoring Effectiveness of Maint at Nuclear Power Plants.Util Is in Total Agreement with NEI Comments HL-5702, Comment Supporting NEI Comments Totally on Proposed Draft RG DG-4005, Preparation of Supplemental Environmental Repts for Applications to Renew Nuclear Power Plant Ols1998-10-23023 October 1998 Comment Supporting NEI Comments Totally on Proposed Draft RG DG-4005, Preparation of Supplemental Environmental Repts for Applications to Renew Nuclear Power Plant Ols HL-5695, Comment Supporting Nuclear Energy Institute (NEI) Comments on 10CFR50.55(a) Pr, Streamlined Hearing Process for NRC Approval of License Transfers1998-10-13013 October 1998 Comment Supporting Nuclear Energy Institute (NEI) Comments on 10CFR50.55(a) Pr, Streamlined Hearing Process for NRC Approval of License Transfers HL-5690, Comment on Integrated Review of Assessment Process for Commercial Nuclear Plants. Util in Total Agreement with NEI Comments Provided to NRC1998-10-0505 October 1998 Comment on Integrated Review of Assessment Process for Commercial Nuclear Plants. Util in Total Agreement with NEI Comments Provided to NRC HL-5983, Comment on Proposed Rule 10CFR50 Re Reporting Requirements for Nuclear Power Reactors. Snoc in Total Agreement with NEI Comments,To Be Provided to Nrc.Requests That NRC Provide Guidance to Application of NUREG-1022,rev 1 as Listed1998-09-21021 September 1998 Comment on Proposed Rule 10CFR50 Re Reporting Requirements for Nuclear Power Reactors. Snoc in Total Agreement with NEI Comments,To Be Provided to Nrc.Requests That NRC Provide Guidance to Application of NUREG-1022,rev 1 as Listed ML20153B2391998-09-15015 September 1998 Comment on Draft NUREG-1633, Assessment of Use of Ki as Protective Action During Severe Reactor Accidents. Endorses NEI Comments HL-5682, Comment Opposing Draft NUREG-1633, Assessment of Use of Potassium Iodide (Ki) as Protective Action During Severe Reactor Accidents, & Endorsing Comments Submitted by Nuclear Energy Institute1998-09-15015 September 1998 Comment Opposing Draft NUREG-1633, Assessment of Use of Potassium Iodide (Ki) as Protective Action During Severe Reactor Accidents, & Endorsing Comments Submitted by Nuclear Energy Institute HL-5602, Comment Opposing Proposed Rule 10CFR50 Re Industry Codes & Stds1998-04-0303 April 1998 Comment Opposing Proposed Rule 10CFR50 Re Industry Codes & Stds HL-5586, Comment on Proposed Generic Ltr, Year 2000 Readiness of Computer Sys at Npps1998-03-0404 March 1998 Comment on Proposed Generic Ltr, Year 2000 Readiness of Computer Sys at Npps HL-5582, Comment on Draft Reg Guide DG-5008, Reporting of Safeguards Events1998-02-27027 February 1998 Comment on Draft Reg Guide DG-5008, Reporting of Safeguards Events HL-5564, Comment on Draft NUREG 1555, Updated Environ Standard Review Plan1998-01-30030 January 1998 Comment on Draft NUREG 1555, Updated Environ Standard Review Plan HL-5554, Comment Supporting NEI Comments on PRM 50-63A by P Crane Recommending Emergency Planning Standard for Protective Actions Be Changed to Require Explicit Consideration of Prophylactic Use of Potassium Iodide for General Public1998-01-15015 January 1998 Comment Supporting NEI Comments on PRM 50-63A by P Crane Recommending Emergency Planning Standard for Protective Actions Be Changed to Require Explicit Consideration of Prophylactic Use of Potassium Iodide for General Public HL-5546, Comment Supporting Proposed Rule & Direct Final Rule on 10CFR50.68 & 10CFR70.24, Criticality Accident Requirements1997-12-31031 December 1997 Comment Supporting Proposed Rule & Direct Final Rule on 10CFR50.68 & 10CFR70.24, Criticality Accident Requirements HL-5529, Comment Opposing Rule 10CFR50 Re Codes & Standards,Ieee National Consensus Standard1997-12-0101 December 1997 Comment Opposing Rule 10CFR50 Re Codes & Standards,Ieee National Consensus Standard ML20199J0031997-11-24024 November 1997 Comment Supporting Proposed Rule Re Financial Requirements for Decommissioning Nuclear Power Reactors & Draft RG 1060 HL-5424, Comment on NUREG-1606, Proposed Regulatory Guidance Re Implementation of 10CFR50.59 (Changes,Tests or Experiments). Encourages NRC Not to Abandon 30 Yrs of Effective Implementation of 10CFR.50.59 for New Positions1997-07-0707 July 1997 Comment on NUREG-1606, Proposed Regulatory Guidance Re Implementation of 10CFR50.59 (Changes,Tests or Experiments). Encourages NRC Not to Abandon 30 Yrs of Effective Implementation of 10CFR.50.59 for New Positions ML20148N0741997-06-19019 June 1997 Comment on Proposed Suppl to Bulletin 96-001 Re Control Rod Insertion Problems.Util in Complete Agreement That Incomplete Rcca Insertion Not Acceptable HL-5407, Comment Opposing NRC Proposed Strategies to Address Licensees Need to Establish & Maintain safety-conscious Work Environ1997-05-27027 May 1997 Comment Opposing NRC Proposed Strategies to Address Licensees Need to Establish & Maintain safety-conscious Work Environ ML20137C4261997-03-18018 March 1997 Director'S Decision Under 10CFR2.206 Re Petition Re Allegation of Illegal Transfer of OLs to Southern Nuclear Operating Co.Petitions Filed by Mb Hobby & AL Mosbaugh Denied ML20137C2581997-03-18018 March 1997 Summary of Director'S Decision Under 10CFR2.206 of Mb Hobby & AL Mosbaugh, HL-5268, Comment Supporting Draft RG DG-1047, Std Format & Content for Applications to Renew NPP Ols1996-11-27027 November 1996 Comment Supporting Draft RG DG-1047, Std Format & Content for Applications to Renew NPP Ols ML20133H1131996-11-25025 November 1996 Petition for Enforcement,Per 10CFR2.206,to Revoke Northeast Utils Operating Licenses for CT Nuclear Power Stations Due to Chronic,Systemic Mismanagement Resulting in Significant Violations of NRC Safety Regulations ML20129J5481996-10-30030 October 1996 Order.* Extends Time within Which Commission May Take Sua Sponte Review of Memorandum & Order LBP-96-16 to 961129. W/Certificate of Svc.Served on 961030 ML20129K4291996-10-0202 October 1996 Comment Supporting Proposed Rule 10CFR25 & 95, Access to & Protection of Classified Info HL-5247, Comment on Proposed Generic Communication, Primary Water Stress Corrosion Cracking of Control Rod Drive Mechanism & Other Vessel Head Penetrations1996-10-0101 October 1996 Comment on Proposed Generic Communication, Primary Water Stress Corrosion Cracking of Control Rod Drive Mechanism & Other Vessel Head Penetrations ML20128K2791996-09-30030 September 1996 Order.* Time within Which Commission May Take Sua Sponte Review of Memo & Order LBP-96-16 Extended Until 961030. W/Certificate of Svc.Served on 960930 ML20116J8921996-08-0202 August 1996 Withdrawal of AL Mosbaugh.* AL Mosbaugh Voluntarily Withdraws Intervention,Opposition & Contention in Proceedings.W/Certificate of Svc & Svc List ML20116J8551996-08-0202 August 1996 Joint Notice of Termination.* AL Mosbaugh Voluntarily Withdrew Intervention,Opposition & Contentions in Proceeding.W/Certificate of Svc & Svc List ML20116J8431996-08-0202 August 1996 Intervenor Response to Georgia Power Motion for Reconsideration.* Intervenor Supports Motion for Reconsideration.W/Certificate of Svc & Svc List ML20116N5881996-07-31031 July 1996 Comment Re Proposed Rule 10CFR26, Mods to Fitness-For-Duty Program Requirements. Supports NEI Comments ML20116A4931996-07-15015 July 1996 Georgia Power Company Motion for Reconsideration of 960628 Memorandum & Order Or,In Alternative,For Certification.* Gpc Requests That Board Not Require Submittal or Approval of Settlement Between Gpc & Mosbaugh.W/Certificate of Svc ML20115H2671996-07-0808 July 1996 Comment Supporting Final Rule 10CFR51, Environ Review of Renewal of Nuclear Power Plant Operating Licenses HL-5195, Comment Supporting Proposed Rule 10CFR50 Re Financial Assurance Requirements for Decommissioning Nuclear Power Reactors1996-06-24024 June 1996 Comment Supporting Proposed Rule 10CFR50 Re Financial Assurance Requirements for Decommissioning Nuclear Power Reactors ML20114E6491996-06-20020 June 1996 Joint Motion to Defer Issuance of Initial Decision.* Requests That ASLB Defer Issuance of Decision in Proceeding Until 960920,in Order to Allow Gpc & Mosbaugh to Reach Settlement Agreement.W/Certificate of Svc IA-95-211, Transcript of 920507 Interview of Mc Wilkins in Waynesboro, Ga.Pp 1-391996-05-0707 May 1996 Transcript of 920507 Interview of Mc Wilkins in Waynesboro, Ga.Pp 1-39 ML20129H7151996-05-0707 May 1996 Transcript of 920507 Interview of Mc Wilkins in Waynesboro, Ga.Pp 1-39 HL-5103, Comment Supporting NEI Comments on Petition for Rulemaking PRM-50-63 Re Planning Std for Protective Actions for General Public Includes Stockpile or Predistribution of Ki for Prophylactic Use1996-02-0606 February 1996 Comment Supporting NEI Comments on Petition for Rulemaking PRM-50-63 Re Planning Std for Protective Actions for General Public Includes Stockpile or Predistribution of Ki for Prophylactic Use ML20096A4911995-12-22022 December 1995 Georgia Power Co Reply to Intervenor & NRC Staff Proposed Findings of Facts & Conclusions of Law.* W/Certificate of Svc ML20095D9821995-12-12012 December 1995 Georgia Power Co Motion to Correct Record of Exhibits of Diesel Generator Reporting Issues Allegation Hearing.* W/Certificate of Svc ML20095D9771995-12-0808 December 1995 Comment on Proposed Generic Ltr Boraflex Degradation in Spent Fuel Pool Starage Racks. Request for Licensees to Demonstrate Subcriticality Margin in Unborated Water,Seems Inconsistent W/Stated Benefit of Borated Water ML20094S2751995-11-30030 November 1995 Intervenor Final Statement of Fact & Conclusions of Law.* Board Finds That Util & Applicant Failed to Meet Burden of Proof Re Ultimate Issue of Character,Competence & Integrity. W/Svc List ML20094S2411995-11-22022 November 1995 Georgia Power Co Response to Intervenors Motion for Continuance.* Intervenor Motion Unjustified & Prejudicial & Should Be Denied.W/Certificate of Svc & Svc List ML20094S2931995-11-21021 November 1995 Intervenor Motion for Continuance for Good Cause.* Requests Deadline for Filing Post Hearing Brief Be Extended Until 951130.W/Certificate of Svc & Svc List ML20094K1161995-11-0909 November 1995 Intervenor Motion to Admit Supplementary Exhibits.* Moves That Naslp Admit Encl Documents Into Evidence for Listed Reasons.W/Certificate of Svc & Svc List ML20094J9281995-11-0606 November 1995 Gap Proposed Findings of Fact & Conclusions of Law on Diesel Generator Reporting Issues.* Findings of Fact & Conclusion Accepted.W/Certificate of Svc ML20094J9301995-11-0606 November 1995 Georgia Power Company Motion to Correct Record of Diesel Generator Reporting Issues Allegation Hearing.* Moves Licensing Board to Order That Corrections Be Made to Transcript.W/Certificate of Svc & Svc List ML20094J9201995-11-0101 November 1995 Affidavit of Ck Mccoy to Correct Info Contained in Intervenor Exhibit II-97,which Consists of Portions of Deposition in a Mosbaugh Complaint Against Gap 1999-06-28
[Table view] Category:TRANSCRIPTS
MONTHYEARIA-95-211, Transcript of 920507 Interview of Mc Wilkins in Waynesboro, Ga.Pp 1-391996-05-0707 May 1996 Transcript of 920507 Interview of Mc Wilkins in Waynesboro, Ga.Pp 1-39 ML20129H7151996-05-0707 May 1996 Transcript of 920507 Interview of Mc Wilkins in Waynesboro, Ga.Pp 1-39 ML20087L9101995-08-21021 August 1995 Transcript of Rebuttal Testimony of G Bockhold Which Addresses Number of Assertions Made in Prefiled Testimony of AL Mosbaugh.Related Correspondence.W/Certificate of Svc & Svc List ML20087L8951995-08-18018 August 1995 Rebuttal Testimony of M Briney on Behalf of DG Reporting Statements.Related Correspondence ML20087L8681995-08-18018 August 1995 Rebuttal Testimony of Owyoung & RA Johnson on Behalf of Diesel Generator Air Quality Statements.Related Correspondence ML20087L9931995-08-18018 August 1995 Transcript of Rebuttal Testimony of Wf Kitchens Which Responded to Three Issues in Prefiled Testimony of AL Mosbaugh.Related Correspondence ML20083C8371995-05-0404 May 1995 Supplemental Testimony of G Bockhold Re Intervenor Exhibit 18.W/Certificate of Svc & Svc List ML20082C1461995-04-0404 April 1995 Prefiled Testimony of MW Horton on DG Reporting Issues.* Related Correspondence ML20082C1431995-04-0404 April 1995 Prefiled Testimony of Gr Frederick on DG Reporting Issues.* Related Correspondence ML20082C1371995-04-0404 April 1995 Prefiled Testimony of Hw Majors on DG Reporting Issues.* Related Correspondence ML20082C1121995-04-0404 April 1995 Supplementary Testimony of G Bockhold on DG Air Quality Statements.* Related Correspondence ML20082C0921995-04-0404 April 1995 Prefiled Testimony of K Stokes on DG Air Quality Statements. * Related Correspondence ML20082C0451995-04-0404 April 1995 Prefiled Testimony of La Ward in DG Air Quality Statements.* Related Correspondence ML20082C0121995-04-0404 April 1995 Prefiled Testimony of G Bockhold on DG Reporting Issues.* Related Correspondence ML20082B9871995-04-0404 April 1995 Prefiled Testimony of Nj Stringfellow on Diesel Generator Reporting Issues.* Related Correspondence ML20082B9611995-04-0404 April 1995 Prefiled Testimony of Jp Cash on Diesel Generator Reporting Issues.* Related Correspondence ML20082B9551995-04-0404 April 1995 Prefiled Testimony of Wg Hairston on Diesel Generator Reporting Issues.* Related Correspondence ML20082B9361995-04-0404 April 1995 Prefiled Testimony of Jg Aufdenkampe on Diesel Generator Reporting Issues.* Related Correspondence ML20082B9151995-04-0404 April 1995 Prefiled Testimony of Tv Greene on Diesel Generator Reporting Issues.* Related Correspondence ML20082B8341995-04-0404 April 1995 Transcript of Prefiled Testimony of Kc Mccoy on DG Reporting Issues.Related Correspondence ML20077S0291995-01-13013 January 1995 Transcript of 950113 Hearing in Rockville,Md Re Facility. Pp 2,621-2,762 ML20077K0871994-12-27027 December 1994 Prefiled Testimony of Jm Farley Re Illegal License Transfer Allegation of Intervenor.W/Exhibit a Giving Biographical Info ML20077K0781994-12-27027 December 1994 Prefiled Testimony of Wg Hairston Re Illegal License Transfer Allegation of Intervenor.W/Exhibits A-J Supporting Testimony ML20077K0721994-12-27027 December 1994 Prefiled Testimony of Ck Mccoy Re Illegal License Transfer Allegation of Intervenor.W/Exhibits Re Amend 39 to FSAR & Duties of Radiological Assessment Manager ML20077K0571994-12-27027 December 1994 Prefiled Testimony of RP Mcdonald Re Illegal License Transfer Allegation of Intervenor.W/Exhibits Re Meetings W/Nrc Officials on Sonopco Project ML20077K0391994-12-27027 December 1994 Prefiled Testimony of Aw Dahlberg Re Illegal License Transfer Allegation of Intervenor ML20078P6341994-12-0808 December 1994 Exhibits to Intervenor Mosbaugh Prefiled Testimony.Related Correspondence.W/Certificate of Svc & Svc List ML20077G0021994-12-0505 December 1994 Prefiled Testimony of MD Barker.* Lists Questions & Answers ML20077F9981994-12-0505 December 1994 Prefiled Testimony of Mb Hobby.* Lists Questions & Answers ML20077F9901994-12-0505 December 1994 Prefiled Testimony of Intervenor,Al Mosbaugh.* ML20080P1081994-10-21021 October 1994 Transcript of 941021 Ae Chaffee Deposition in Rockville,Md Re Involvement W/Incident Investigation Team Which Went to Vogtle Site Following 900320 Site Emergency Area.Pp 1-103.Supporting Documentation Encl ML20080P1041994-08-24024 August 1994 Transcript of a Mosbaugh 940824 Deposition in Atlanta,Ga Re Opportunity to Review Prefile Testimony. Pp 463-721.Supporting Info Encl ML20080P0901994-08-23023 August 1994 Transcript of a Mosbaugh 940823 Deposition in Atlanta,Ga Re Taping Process & Indexing of Tapes & Maint of Tapes. Pp 208-463 ML20080P0821994-07-22022 July 1994 Transcript of a Mosbaugh 940722 Deposition in Atlanta,Ga. Pp 1-208.Supporting Info Encl ML20080P1231993-11-0404 November 1993 Transcript of 931104 Investigative Interview of a Mosbaugh in Grovetown,Ga.Pp 1-196 ML20127D3681993-01-12012 January 1993 Transcript of 930112 ASLB Proceedings in Augusta,Ga Re Gpc Et Al,Vogtle Electric Generating Plant,Units in Augusta,Ga. Pp 5-116 ML20127M9541993-01-11011 January 1993 Corrected Version of Transcript of 930111 ASLB Gpc,Et Al, Vogtle Electric Generating Plant,Units 1 & 2.Pp 1-4.Related Documentation Encl ML20059N8821990-10-0303 October 1990 Transcript Corrections (Prehearing Conference).* Lists Adopted Corrections to 900919 Prehearing Conference Transcript,Per NRC 900928 Submittal of Proposed Corrections. Certificate of Svc Encl.Served on 901004 ML20059M5741990-09-28028 September 1990 NRC Staff Corrections to Transcript of Hearing in Atlanta,Ga on 900919 in Above Captioned Proceeding.* W/Certificate of Svc ML20080P1171990-07-18018 July 1990 Transcript of 900718 Investigative Interview of a Mosbaugh in Augusta,Ga.Pp 1-255.Supporting Documentation Encl ML20129F2641990-07-18018 July 1990 Transcript on 900718-19 Investigative Interview of a Mosbaugh.Pp 1-254 ML20077G0071990-07-16016 July 1990 Prefiled Testimony of Tj Mchenry.* W/Certificate of Svc. Related Correspondence ML20129F1741990-04-0202 April 1990 Transcript of 900402 Meeting in Waynesboro,Ga Re Diesel Generator.Pp 1-61.Supporting Documentation Encl ML20247F7151989-03-30030 March 1989 Transcript of 890330 Discussion/Possible Vote in Rockville,Md Re Full Power OL for Facility.Pp 1-71. Viewgraphs Encl ML20247R4091988-12-31031 December 1988 Transcript of Commission 881221 Press Conference in Rockville,Md.Pp 1-31 ML20196A5991988-12-0101 December 1988 Transcript of 881201 Hearing in Bethesda,Md.Pp 143-152 ML20206J3701988-11-21021 November 1988 Transcript of 881121 Telcon in Bethesda,Md Re Alchemie. Pp 70-100 ML20206C0851988-11-0909 November 1988 Transcript of ASLB 881109 Telcon in Bethesda,Md.Pp 44-69 ML20205R7111988-11-0404 November 1988 NRC Staff Testimony of Jj Swift Addressing ASLB Inquiries Dtd 881018.* Supporting Info Encl.Related Correspondence ML20151M8991988-07-21021 July 1988 Transcript of 880721 Prehearing Conference in Knoxville,Tn. Pp 1-43 1996-05-07
[Table view] Category:DEPOSITIONS
MONTHYEARIA-95-211, Transcript of 920507 Interview of Mc Wilkins in Waynesboro, Ga.Pp 1-391996-05-0707 May 1996 Transcript of 920507 Interview of Mc Wilkins in Waynesboro, Ga.Pp 1-39 ML20129H7151996-05-0707 May 1996 Transcript of 920507 Interview of Mc Wilkins in Waynesboro, Ga.Pp 1-39 ML20087L9101995-08-21021 August 1995 Transcript of Rebuttal Testimony of G Bockhold Which Addresses Number of Assertions Made in Prefiled Testimony of AL Mosbaugh.Related Correspondence.W/Certificate of Svc & Svc List ML20087L8951995-08-18018 August 1995 Rebuttal Testimony of M Briney on Behalf of DG Reporting Statements.Related Correspondence ML20087L8681995-08-18018 August 1995 Rebuttal Testimony of Owyoung & RA Johnson on Behalf of Diesel Generator Air Quality Statements.Related Correspondence ML20087L9931995-08-18018 August 1995 Transcript of Rebuttal Testimony of Wf Kitchens Which Responded to Three Issues in Prefiled Testimony of AL Mosbaugh.Related Correspondence ML20083C8371995-05-0404 May 1995 Supplemental Testimony of G Bockhold Re Intervenor Exhibit 18.W/Certificate of Svc & Svc List ML20082C1461995-04-0404 April 1995 Prefiled Testimony of MW Horton on DG Reporting Issues.* Related Correspondence ML20082C1431995-04-0404 April 1995 Prefiled Testimony of Gr Frederick on DG Reporting Issues.* Related Correspondence ML20082C1371995-04-0404 April 1995 Prefiled Testimony of Hw Majors on DG Reporting Issues.* Related Correspondence ML20082C1121995-04-0404 April 1995 Supplementary Testimony of G Bockhold on DG Air Quality Statements.* Related Correspondence ML20082C0921995-04-0404 April 1995 Prefiled Testimony of K Stokes on DG Air Quality Statements. * Related Correspondence ML20082C0451995-04-0404 April 1995 Prefiled Testimony of La Ward in DG Air Quality Statements.* Related Correspondence ML20082C0121995-04-0404 April 1995 Prefiled Testimony of G Bockhold on DG Reporting Issues.* Related Correspondence ML20082B9871995-04-0404 April 1995 Prefiled Testimony of Nj Stringfellow on Diesel Generator Reporting Issues.* Related Correspondence ML20082B9611995-04-0404 April 1995 Prefiled Testimony of Jp Cash on Diesel Generator Reporting Issues.* Related Correspondence ML20082B9551995-04-0404 April 1995 Prefiled Testimony of Wg Hairston on Diesel Generator Reporting Issues.* Related Correspondence ML20082B9361995-04-0404 April 1995 Prefiled Testimony of Jg Aufdenkampe on Diesel Generator Reporting Issues.* Related Correspondence ML20082B9151995-04-0404 April 1995 Prefiled Testimony of Tv Greene on Diesel Generator Reporting Issues.* Related Correspondence ML20082B8341995-04-0404 April 1995 Transcript of Prefiled Testimony of Kc Mccoy on DG Reporting Issues.Related Correspondence ML20077S0291995-01-13013 January 1995 Transcript of 950113 Hearing in Rockville,Md Re Facility. Pp 2,621-2,762 ML20077K0871994-12-27027 December 1994 Prefiled Testimony of Jm Farley Re Illegal License Transfer Allegation of Intervenor.W/Exhibit a Giving Biographical Info ML20077K0781994-12-27027 December 1994 Prefiled Testimony of Wg Hairston Re Illegal License Transfer Allegation of Intervenor.W/Exhibits A-J Supporting Testimony ML20077K0721994-12-27027 December 1994 Prefiled Testimony of Ck Mccoy Re Illegal License Transfer Allegation of Intervenor.W/Exhibits Re Amend 39 to FSAR & Duties of Radiological Assessment Manager ML20077K0571994-12-27027 December 1994 Prefiled Testimony of RP Mcdonald Re Illegal License Transfer Allegation of Intervenor.W/Exhibits Re Meetings W/Nrc Officials on Sonopco Project ML20077K0391994-12-27027 December 1994 Prefiled Testimony of Aw Dahlberg Re Illegal License Transfer Allegation of Intervenor ML20078P6341994-12-0808 December 1994 Exhibits to Intervenor Mosbaugh Prefiled Testimony.Related Correspondence.W/Certificate of Svc & Svc List ML20077G0021994-12-0505 December 1994 Prefiled Testimony of MD Barker.* Lists Questions & Answers ML20077F9981994-12-0505 December 1994 Prefiled Testimony of Mb Hobby.* Lists Questions & Answers ML20077F9901994-12-0505 December 1994 Prefiled Testimony of Intervenor,Al Mosbaugh.* ML20080P1081994-10-21021 October 1994 Transcript of 941021 Ae Chaffee Deposition in Rockville,Md Re Involvement W/Incident Investigation Team Which Went to Vogtle Site Following 900320 Site Emergency Area.Pp 1-103.Supporting Documentation Encl ML20080P1041994-08-24024 August 1994 Transcript of a Mosbaugh 940824 Deposition in Atlanta,Ga Re Opportunity to Review Prefile Testimony. Pp 463-721.Supporting Info Encl ML20080P0901994-08-23023 August 1994 Transcript of a Mosbaugh 940823 Deposition in Atlanta,Ga Re Taping Process & Indexing of Tapes & Maint of Tapes. Pp 208-463 ML20080P0821994-07-22022 July 1994 Transcript of a Mosbaugh 940722 Deposition in Atlanta,Ga. Pp 1-208.Supporting Info Encl ML20080P1231993-11-0404 November 1993 Transcript of 931104 Investigative Interview of a Mosbaugh in Grovetown,Ga.Pp 1-196 ML20127D3681993-01-12012 January 1993 Transcript of 930112 ASLB Proceedings in Augusta,Ga Re Gpc Et Al,Vogtle Electric Generating Plant,Units in Augusta,Ga. Pp 5-116 ML20127M9541993-01-11011 January 1993 Corrected Version of Transcript of 930111 ASLB Gpc,Et Al, Vogtle Electric Generating Plant,Units 1 & 2.Pp 1-4.Related Documentation Encl ML20059N8821990-10-0303 October 1990 Transcript Corrections (Prehearing Conference).* Lists Adopted Corrections to 900919 Prehearing Conference Transcript,Per NRC 900928 Submittal of Proposed Corrections. Certificate of Svc Encl.Served on 901004 ML20059M5741990-09-28028 September 1990 NRC Staff Corrections to Transcript of Hearing in Atlanta,Ga on 900919 in Above Captioned Proceeding.* W/Certificate of Svc ML20080P1171990-07-18018 July 1990 Transcript of 900718 Investigative Interview of a Mosbaugh in Augusta,Ga.Pp 1-255.Supporting Documentation Encl ML20129F2641990-07-18018 July 1990 Transcript on 900718-19 Investigative Interview of a Mosbaugh.Pp 1-254 ML20077G0071990-07-16016 July 1990 Prefiled Testimony of Tj Mchenry.* W/Certificate of Svc. Related Correspondence ML20129F1741990-04-0202 April 1990 Transcript of 900402 Meeting in Waynesboro,Ga Re Diesel Generator.Pp 1-61.Supporting Documentation Encl ML20247F7151989-03-30030 March 1989 Transcript of 890330 Discussion/Possible Vote in Rockville,Md Re Full Power OL for Facility.Pp 1-71. Viewgraphs Encl ML20247R4091988-12-31031 December 1988 Transcript of Commission 881221 Press Conference in Rockville,Md.Pp 1-31 ML20196A5991988-12-0101 December 1988 Transcript of 881201 Hearing in Bethesda,Md.Pp 143-152 ML20206J3701988-11-21021 November 1988 Transcript of 881121 Telcon in Bethesda,Md Re Alchemie. Pp 70-100 ML20206C0851988-11-0909 November 1988 Transcript of ASLB 881109 Telcon in Bethesda,Md.Pp 44-69 ML20205R7111988-11-0404 November 1988 NRC Staff Testimony of Jj Swift Addressing ASLB Inquiries Dtd 881018.* Supporting Info Encl.Related Correspondence ML20151M8991988-07-21021 July 1988 Transcript of 880721 Prehearing Conference in Knoxville,Tn. Pp 1-43 1996-05-07
[Table view] Category:NARRATIVE TESTIMONY
MONTHYEARIA-95-211, Transcript of 920507 Interview of Mc Wilkins in Waynesboro, Ga.Pp 1-391996-05-0707 May 1996 Transcript of 920507 Interview of Mc Wilkins in Waynesboro, Ga.Pp 1-39 ML20129H7151996-05-0707 May 1996 Transcript of 920507 Interview of Mc Wilkins in Waynesboro, Ga.Pp 1-39 ML20087L9101995-08-21021 August 1995 Transcript of Rebuttal Testimony of G Bockhold Which Addresses Number of Assertions Made in Prefiled Testimony of AL Mosbaugh.Related Correspondence.W/Certificate of Svc & Svc List ML20087L8951995-08-18018 August 1995 Rebuttal Testimony of M Briney on Behalf of DG Reporting Statements.Related Correspondence ML20087L8681995-08-18018 August 1995 Rebuttal Testimony of Owyoung & RA Johnson on Behalf of Diesel Generator Air Quality Statements.Related Correspondence ML20087L9931995-08-18018 August 1995 Transcript of Rebuttal Testimony of Wf Kitchens Which Responded to Three Issues in Prefiled Testimony of AL Mosbaugh.Related Correspondence ML20083C8371995-05-0404 May 1995 Supplemental Testimony of G Bockhold Re Intervenor Exhibit 18.W/Certificate of Svc & Svc List ML20082C1461995-04-0404 April 1995 Prefiled Testimony of MW Horton on DG Reporting Issues.* Related Correspondence ML20082C1431995-04-0404 April 1995 Prefiled Testimony of Gr Frederick on DG Reporting Issues.* Related Correspondence ML20082C1371995-04-0404 April 1995 Prefiled Testimony of Hw Majors on DG Reporting Issues.* Related Correspondence ML20082C1121995-04-0404 April 1995 Supplementary Testimony of G Bockhold on DG Air Quality Statements.* Related Correspondence ML20082C0921995-04-0404 April 1995 Prefiled Testimony of K Stokes on DG Air Quality Statements. * Related Correspondence ML20082C0451995-04-0404 April 1995 Prefiled Testimony of La Ward in DG Air Quality Statements.* Related Correspondence ML20082C0121995-04-0404 April 1995 Prefiled Testimony of G Bockhold on DG Reporting Issues.* Related Correspondence ML20082B9871995-04-0404 April 1995 Prefiled Testimony of Nj Stringfellow on Diesel Generator Reporting Issues.* Related Correspondence ML20082B9611995-04-0404 April 1995 Prefiled Testimony of Jp Cash on Diesel Generator Reporting Issues.* Related Correspondence ML20082B9551995-04-0404 April 1995 Prefiled Testimony of Wg Hairston on Diesel Generator Reporting Issues.* Related Correspondence ML20082B9361995-04-0404 April 1995 Prefiled Testimony of Jg Aufdenkampe on Diesel Generator Reporting Issues.* Related Correspondence ML20082B9151995-04-0404 April 1995 Prefiled Testimony of Tv Greene on Diesel Generator Reporting Issues.* Related Correspondence ML20082B8341995-04-0404 April 1995 Transcript of Prefiled Testimony of Kc Mccoy on DG Reporting Issues.Related Correspondence ML20077S0291995-01-13013 January 1995 Transcript of 950113 Hearing in Rockville,Md Re Facility. Pp 2,621-2,762 ML20077K0871994-12-27027 December 1994 Prefiled Testimony of Jm Farley Re Illegal License Transfer Allegation of Intervenor.W/Exhibit a Giving Biographical Info ML20077K0781994-12-27027 December 1994 Prefiled Testimony of Wg Hairston Re Illegal License Transfer Allegation of Intervenor.W/Exhibits A-J Supporting Testimony ML20077K0721994-12-27027 December 1994 Prefiled Testimony of Ck Mccoy Re Illegal License Transfer Allegation of Intervenor.W/Exhibits Re Amend 39 to FSAR & Duties of Radiological Assessment Manager ML20077K0571994-12-27027 December 1994 Prefiled Testimony of RP Mcdonald Re Illegal License Transfer Allegation of Intervenor.W/Exhibits Re Meetings W/Nrc Officials on Sonopco Project ML20077K0391994-12-27027 December 1994 Prefiled Testimony of Aw Dahlberg Re Illegal License Transfer Allegation of Intervenor ML20078P6341994-12-0808 December 1994 Exhibits to Intervenor Mosbaugh Prefiled Testimony.Related Correspondence.W/Certificate of Svc & Svc List ML20077G0021994-12-0505 December 1994 Prefiled Testimony of MD Barker.* Lists Questions & Answers ML20077F9981994-12-0505 December 1994 Prefiled Testimony of Mb Hobby.* Lists Questions & Answers ML20077F9901994-12-0505 December 1994 Prefiled Testimony of Intervenor,Al Mosbaugh.* ML20080P1081994-10-21021 October 1994 Transcript of 941021 Ae Chaffee Deposition in Rockville,Md Re Involvement W/Incident Investigation Team Which Went to Vogtle Site Following 900320 Site Emergency Area.Pp 1-103.Supporting Documentation Encl ML20080P1041994-08-24024 August 1994 Transcript of a Mosbaugh 940824 Deposition in Atlanta,Ga Re Opportunity to Review Prefile Testimony. Pp 463-721.Supporting Info Encl ML20080P0901994-08-23023 August 1994 Transcript of a Mosbaugh 940823 Deposition in Atlanta,Ga Re Taping Process & Indexing of Tapes & Maint of Tapes. Pp 208-463 ML20080P0821994-07-22022 July 1994 Transcript of a Mosbaugh 940722 Deposition in Atlanta,Ga. Pp 1-208.Supporting Info Encl ML20080P1231993-11-0404 November 1993 Transcript of 931104 Investigative Interview of a Mosbaugh in Grovetown,Ga.Pp 1-196 ML20127D3681993-01-12012 January 1993 Transcript of 930112 ASLB Proceedings in Augusta,Ga Re Gpc Et Al,Vogtle Electric Generating Plant,Units in Augusta,Ga. Pp 5-116 ML20127M9541993-01-11011 January 1993 Corrected Version of Transcript of 930111 ASLB Gpc,Et Al, Vogtle Electric Generating Plant,Units 1 & 2.Pp 1-4.Related Documentation Encl ML20059N8821990-10-0303 October 1990 Transcript Corrections (Prehearing Conference).* Lists Adopted Corrections to 900919 Prehearing Conference Transcript,Per NRC 900928 Submittal of Proposed Corrections. Certificate of Svc Encl.Served on 901004 ML20059M5741990-09-28028 September 1990 NRC Staff Corrections to Transcript of Hearing in Atlanta,Ga on 900919 in Above Captioned Proceeding.* W/Certificate of Svc ML20080P1171990-07-18018 July 1990 Transcript of 900718 Investigative Interview of a Mosbaugh in Augusta,Ga.Pp 1-255.Supporting Documentation Encl ML20129F2641990-07-18018 July 1990 Transcript on 900718-19 Investigative Interview of a Mosbaugh.Pp 1-254 ML20077G0071990-07-16016 July 1990 Prefiled Testimony of Tj Mchenry.* W/Certificate of Svc. Related Correspondence ML20129F1741990-04-0202 April 1990 Transcript of 900402 Meeting in Waynesboro,Ga Re Diesel Generator.Pp 1-61.Supporting Documentation Encl ML20247F7151989-03-30030 March 1989 Transcript of 890330 Discussion/Possible Vote in Rockville,Md Re Full Power OL for Facility.Pp 1-71. Viewgraphs Encl ML20247R4091988-12-31031 December 1988 Transcript of Commission 881221 Press Conference in Rockville,Md.Pp 1-31 ML20196A5991988-12-0101 December 1988 Transcript of 881201 Hearing in Bethesda,Md.Pp 143-152 ML20206J3701988-11-21021 November 1988 Transcript of 881121 Telcon in Bethesda,Md Re Alchemie. Pp 70-100 ML20206C0851988-11-0909 November 1988 Transcript of ASLB 881109 Telcon in Bethesda,Md.Pp 44-69 ML20205R7111988-11-0404 November 1988 NRC Staff Testimony of Jj Swift Addressing ASLB Inquiries Dtd 881018.* Supporting Info Encl.Related Correspondence ML20151M8991988-07-21021 July 1988 Transcript of 880721 Prehearing Conference in Knoxville,Tn. Pp 1-43 1996-05-07
[Table view] |
Text
-
4 Y
May 7, 1974 :. ..
f WO U. S. ATOMIC ENERGY C041ISSION "[
ALVIN W. V0GTLE NUCLEAR PLANT, UNITS 1-4 DOCKET NOS. 50-424, 425, 426, 427 SUPPLEMENTAL TESTIMONY OF AEC REGULATORY STAFF ON SITE SUITABILITY BY Harold R. Denton Assistant Director for Site Safety The site proposed for the Vogtle facility has been reviewed by the Regulatory staff'to establish whether the site is suitable for light water reactors of the general type proposed. The facility will be located on the southwest side of the Savannah River in -
Burke ' County, Georgia, approximately 26 miles south-southeast of Augusta, Georgia. The facility consists of four pressurized i
water reactors of a design similar to that reviewed and approved Ifor other nuclear power planta now in operation or under ednstruction.
Each unit is designed for a rated thermal output of 3411 MJ and a net electrical output of about 1100 Mf. The site evaluation has been conducted for a stretch th armal power of 3565 MJ.
The Nuclear Steam Supply Systems, f.tcluding the initial cores.
will be supplied by the Westinghou e Electric' Corporation and-the turbine generators will be put chased from the General Electric Company.
DR p 2 850228 ~
8 M 84-430 PDR
o 3
distance, low population zone and population center distance, there is reasonable assurance that adequate engineered safety features can be provided to meet the dose guideline values indicated in 10 CFR Part 100.
B. NEARBY INDUSTRIAL, TRANSPORTATION & MILITARY FACILITIES No nearby industrial or military facilities have been identified for which the Vogtle plant could not be designed against, as
- necessary, to protect the health and safety of the public. There are no airports, military facilities, gas pipelines or major highways within 5 miles'of the plant.- The nearest railroad line is about.
4 miles from the plant. The only significant transportation route'in I the vicinity is the Savannat River which is about 3600 feet from the nearest reactor.
The AEC's Savannah River Plant (SRP), which lies directly across the river from the proposed Vogtle nuclear station produces nuclear materials, including plutonium and tritium, and uses significant quantities of the hazardous chemical hydrogen sulfide. The nearest operating SRP reactor is located about 8 miles from the proposed Vogtle plant'and the nearest fuel processing and tritium processing
, facilities about 11 miles away. Hydrogen sulfide is stored and used at a distance of about 4 miles. We have evaluated accidental releases of radioactive materials and of hazardous chemicals from SRP. Based on our review, we have concluded that adequate design provisions can be incorporated to assure that the Vogtle plant meets General Design
7
-4
^
Criterion: No.19, and . that such releases would not adversely af fect control room operations, nor prevent ' a safe and orderly shutdown of the nuclear reactors.
-On-the basis of the above considerations, we conclude that there are no nearby activities that would preclude -site acceptability. ,
'l C. . SEISMOLOGY AND GEOLOGY There are no geologic hazards such as surface faulting, landsliding potential, liquefaction potential, or ground failure attributable to subsidence or. collapse brought ab'out by cavities or caverns within the clay-bearing
' stratum at the site.
-j. The site is' located on the Coastal Plain Province.about~
25 miles southeast of the Fall Zone, the physiographic boundary between the Coastal Plain and Piedmont Provinces.
The Safe Shutdown Earthquake (SSE) for the Vogtle site will be based on the seismicity of both provinces. The Atlantic ,
~ Coastal Plain ' Province has experienced a maximum historical intensity of X.on 'the Modified Mercalli (MM)' scale as a consequence of the 1886 Charleston, South Carolina earthquake.
During that event, the-site, which is about 100 miles from Charleston, experienced an intensity no higher than VII on the MM scale. Because of the spatial clustering characteristics of Coastal Plain earthquakes, particularly a cluster of more than 400 historic shocks in the -immediate vicinity of .
Charleston, and because the site itself is located in a w .w -
- - - , . ,,rw, , ,.. , , - ,-- -
5 nearly aseismic area, we do not consider that intensity X events.could occur near the site. W e conclude that an intensity of VII is the maximum likely to be experienced at the site in consequence of a Coastal Plain earthquake.
The Piedmont has experienced a maximum intensity of VII.
The nearest point to the site of the Piedmont province is 25 miles distant. Thus, the SSE at the site will be
(..
no greater than VII. Plants licensed by the Atomic Energy Commission elsewhere in the eastern United States have been designed for this intensity.
The crystalline basement, which is near the surface northwest of the Fall Zone, slopes southeasterly and lies at a depth of about
.6 950 feet beneath the site. The basement is overlain by Coastal Plain sediments consisting of sands, silts, clays, and limestones ranging in age from Cretaceous to Recent. The applicant demonstrated that the Coastal Plain strata beneath the site are not faulted.
-Within the basement'beneath the site is a downfaulted block, filled with Triassic sediments. It is believed that the northwest side of this Triassic Basin is founded by a fault, about one mile northwest of the site. . Any faulting associated with such Triassic basins does not appear to have been tectonically active since pre-Upper Cretaceous time, or more than 60 million years ago, and faults associated with the basins are not considered " capable" faults as defined in Appendix A to 10 CFR Part 100. There are no other identifiable faults or other younger geologic structures that might be expected to localize earth-quakes in the imrediate vicinity of the site.
T-
~
6 From our analysis and evaluation of available geologic and seismicity data,' including the results of the investigations performed by the-applicant, we conclude that there are no geologic or seismic consider-ations which would preclude the acceptability of the site.
D. METEOROLOGY The Vogtle site is on the eastern side of an area, centered over the southern Appalachian Mountains, in which atmospheric dispersion condi-tions are generally not as favorable as over other portions of the United States east of the Rocky Mountains. Within the geographical region in which the site is located, however, the dispersion condi-tions at Vogtle are better than at other nuclear plant sites in chia region, and better than the average for all sites in the contiguous 1
United States.
A description of meteorological conditions at the site, including.
the climatology of the region, local meteorological conditions and expectea severe weather, is presented in Section 2.6 of the Final
- Environmental Statement for the plant issued in March 1974.
~
The applicant has provided meteorological data (in joint frequency foca as recommended in Regulatory Guide 1.23), co11ected onsite during the period 12/4/72 - 12/4/73, as a basis for the staff's evalua-tion of atmospheric diffusion conditions. For the evaluation of .short-term accidental releases from the buildings and vents, the staff used the joint frequency distribution of wind direction and speed measured at the 33-foot level and vertical temperature difference between the
e 7
150- and 33-foot levels, and assumed a ground-level release with a building wake factor (cA) of 1350 square meters.
The relative concentration (X/Q) for the 0-2 hour time period which is exceeded 57. of the time is calculated, using the diffusion model
-4 3 described in Regulatory Guide 1.4, to be 2.8 x 10 sec/m. at the minimum site boundary distance of 1098 meters. This relative concen-tration is equivalent to dispersion conditions produced by Pasquill type F stability with a wind speed of 1.1 meters /second. The relative concentration which is exceeded 5% of the time at the outer boundary of
-4 3 thelowpopulationzone.i3220m)iscalculatedtobe1.0X10 sec/m t for the 0-8 hour time period.
A comparison of the short-term atmospheric dispersion values at the exclusion radius with similar values at other sites that have been evaluated by the staf f indicates that the dispersion condi.tions at ,
Vogtle are better than those at about 807. of the other sites.
Based on the above, we conclude that there are no meteorological char-acteristics that would preclude site acceptability.
E.. HYDROLOGY The proposed site for the Vogtle plant is about 26 miles SSE of Augusta, Georgia, on the west bank of the Savannah River. Plant grade is to be about 220 feet above mean sea level (MSL). I i
s 8
The site.is not subject to flooding-from the Savannah River. The esti-mated Savannah River Probable Maxieum Flood (PMF), about one million
~
cubic feet per second at the site, is a modified Corps of Engineers estimate for the Savannah River above Augusta. Preliminary estimates indicate a maximum water level of about 149 feet MSL
-will be attained. The design-basis water level on the -Savannah River will be produced by a Standard Project Flood, generally assumed equal to about one-half-of the PMF, coincident with an arbitrarily
. assumed seismic failure of the upstream Jocasse Dam and the sub-sequent failure of all intermediate dams. The estimated water level at the. site under these assumed conditions would be about 168 feet MSL. The conservative methods of, analyses and the substantial margin between the calculated flood levels and plant grade provide assurance that the design-basis flood elevation will be well below plant grade.
I-The Savannah River will-provide an adequate supply of normal cooling water. Because it is regulated by upstream reservoirs, the estimated low flow of the Savannah River is significantly greater than the esti-r mated makeup requirements for th,e proposed natural draft cooling towers.
Mechanical draf t cooling towers, which are to provide emergency cooling, are to be located at plant grade and are not to be dependent on the
, river intake for emergency operation.
The groundwater gradient beneath the site is toward - the Savannah River.
Only plant wells are loca ted down gradient between the site and the River. Thus, the potential for groundwater contamination from acci-dental spills will not differ from that at sites previously approved by the Commission.
O e
,w- -, m , w-, m ,- -,m -w
.j-9 Based on the above considerations, we conclude that there are no hydro--
logical factors that would preclude acceptability of the site.
CONCLUSION On the basis of our fanalysis and evaluation, we conclude that there is reasonable assurance that the proposed site is a suitable location for nuclear power reactors of the general size and type proposed from the standpoint of radiological health and safety considerations under the Atomic Energy Act and rules and regulations pror.ulgated by the Commission pursuant'thereto.
4
$