Monthly Operating Rept for Jan 1985
ML20111C237
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/31/1985
From: Hutchison L, Martin J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8503150316
Download: ML20111C237 (5)


Text

__ __ . _ _ _ . - - _ _ _ _ _ _____

- - AVERAGE DAILY UNTT POWER LEVEL DOCKET NO. 50-397 11NTT NNP~2 -

DATE 2/1/8'5 COMPLETED BY LB Hutchison TELEPHONE (509)377-2501 ext 2486 JANUARY 1985 MOh'Iri DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) -

(MWe-Net) 605 1 37 394 2 192 0 18 3

835 '<

~

is 48 1021 4 20 843 1031 8 21 1009 s

1065 944 22 1066 7 23 1061 1066 g 1076 24 g 1066 432.6 25 jo 1065 0 26 11 1065 452 27

  • 1038 12 '- 28 1 1065 29- 953 l 1065 li.

1067 l' x

)

1064 353 15 33 I 1064 is l

Shohh97 PDR INSTRUCTIONS On this form, list the average dz5y imit power level in MWe-Net for each dsy in the reporting month.Ccmpute to the nestest whole mestwstt. j Taese Ogure: wt!! be used to plot a paph for er.:h reporting month. Note that when :::aximum dependable :sp:cityis used for the net electncal rating of ths unit, the:e may be cc::sions when the daily average power Ictel exceeds the 00, line (or the rest:icted power level Lae). In such c:ses. the average daily unit powe: output sheet should be foo: note 4 to e:: plain the apparent anornaly.

4

OPERATING DATA REPORT 50-397 DOCKET NO.

j WNP-2 UNIT 2/1/85 l DATE l COMPLETED BY LB HutChison TELEPHONE (509) 377-2501 ext 248 l

l OPERATING STATUS 744 GROSE HOURS IN REPORTING PERICO:

1. REPORTING PERICO:

3323 MAX. OEPENO. CAPACITY (MWe Net):

1095

2. CURRENTLY AUTHORIZED POWER LEVELg: MAX. DEPEND. CAPACITY (MWe-GROSS:)

iI4U DESIGN ELECTRICAL RATING (MWo. Net):

NONE

3. POWER LEVELTO WHICH RESTRICTED (lF ANY) (MWM:
4. REASONS FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULATIVE ,

-e 636 2 1052.7

5. NUMBER OF HOURS REACTOR WAS CRITICAL 0

. . . 0. . . . . . . . 0. . . 636.2

8. REACTOR RESERVE SHUTOOWN HOURS . . . . . . . . . . . . . . . . . . .

602.8. 1001.3

7. HOURS GENER ATOR ON LINE . . . . . . . . . .0. . . . . . . .0. . . . . . . 602. 0 8 i

S. UNIT RESERVE SHUTDOWN HOURS ......................

1,848,000 1,848,000 3,061,628

9. GROSS THERMAL ENERGY GENERATED * (MWHI 624,660 624,660 1,051,590
10. GROSS ELECTRICAL ENERGY GENER ATED (MWH) . . . . . . . . . . . . . 599,995 1,010,381 599,995
11. NET ELECTRICAL ENERGY GENERATED (MWHI ..............
h. 85.5% 85.5% 88.9%
12. R EACTOR SERVICE F ACTOR . . . . . . . . . . . . . . . . . . . . . . . . . . .

85.5% 85.5% 88.9%

13. REACTOR AV AILASILITY F ACTOR . . . . . . . . . . . . . . . . . . . . . . .

81% 81% 84.6%

14. UNIT SERVIC E FACTOR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81% 81% 84.6%
15. UNIT AVAILASILITY FACTOR . . . . . . . . . . . . . . . . . . . . . . . . . .

73.6% 73.6% 77.9%

16. UNIT CAPACITY FAQTOR (Using MOC) ....................

73.3% 73.3% 77.6%

I 17. UNIT CAP ACITY FACTOR IUsing Deegn MWel . . . . . . . . . . . . . . . . .

19% 19% 15.4%

18. UNIT FORCED OUTAGE RATE . . . . . . . . . . . . . . . . . . . . . . . . . .
19. SHUTDCWNS SCHEDULED OVER NEXT 8 MONTHS (TYPE DATE. AND DURATICN OF EACHl:

- Annual maintenance outage (M3): 4/15/85 for 60 days

20. IF SHUT 3CWN AT END OF REPORT PERICD. ESTIMATED DATE OF STARTUP:

! FORECAST ACHIEVED l 21. UNITS IN TEST STATUS (PRIOR TO CCMMERCI AL CPERATION):

i INITIAL CRITICALITY INITIAL ELECTRICITY COMMERC!ALOPERATION 1 Generator Name Plate 1,231,700 KVA 9 0.975 P.F.

,a ._ _ _ _ _ _ _ _ ,,

N PAGE 1 of 2 00@CTN0'.

WNP-2 LNIT NAME DATE 2/1/85 COMPLETED BY LB Hutchison LNIT SHJTDOWNS / REDUCTIONS REPORT PERIOD UAN 19 85 TELEPHOPE (509) 377-2501 ext 2486 mcnth, yEr .

l ,

W UATE TiPE TDGE IIEA5DFl N N 3Y5TUI N CAUSE & CORRECTIVE ACTION TO FREVENT RECURRENCE y-02 1/1/85 F 22.88 A 3 85-002 EA TRANS Failure of a potential transformer in the 500 KV-substation in the proximity of generator breakers, resulted in operation of ground 0.C. relays which tripped the main generator and caused a reactor Scram from 100% power. Time elements on the ground relays were extended from .25 seconds to .5 seconds I

Nand other corrective actions are to be implemented as conditions permit.

(see LER 85-002) 1/17/85 58.33 3 85-006 EB CKTBRK A Scram occured at 100% power due to an accidental h5-03 F G trip of a feeder breaker and the resultant loss of "A" RPS Bus while a h Scram existed on the opposite

. RPS channel due to troubleshooting an APRM down ..

scale alarm.

(see LER 85-006)

, N I I .. .

I stmARY l REASON METHOD SYSTEM & COMP 0fENT TYPE F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of -

D-Regulatory Restriction 4-Continued Data Entry Sheet

. E-Operator Training 5-Reduced Load Licensee Event Report 8 (LER) File (NUREG-0161)

& License Examination 9-Other

_ _ _ . - __ ____ _ v_ _ m _ _ _ _ _ _ -

PAGE 2 of 2 N -

- DOCKETNO.

LNIT NAME WNP-2 ,

DATE 2/1/85 LNIT SRITDOWNS / REDUCTIONS COMPLETED BY LB Hutchison JAN. 19 85 '

M PHOE (509) 377-2501 ext 2486 REPm T PERIOD month, yWr -

T DAE TVPE HD5 RYA 5iN RETRIf UTTERim 3Y5TN 'CtNRHM CAUSE & t,uctCHVE ACTION TO FREVENT RECURRENCE D5-04 1/25/85 F 43.95 A 3 85-005 EA RELAYX Generator trip from 100% power was attributed to perturbations in the microwave link between genera' tor and 500 KV generator breaker which

~~~

gave signal that generator breaker was open when in actuality, it remained closed. The signal was subsequently shifted to a more

\ reliable microwave channel. (seeLER85-005) 15-05 1/31/85 F 16.02 A 3 LATER EB RELAYX F Generator tripped from 100% power as a result of inadvertant operati6n of a unit lockout relay with the resultant tripping scheme causing a partial loss of off site power. The cause of-trip was investigated, transformers were tested and modifications to relays were implemented to prevent similar future occurances.

, (LERlater)

A c.-

1 I " ~ ' ~

l SLM4ARY l

\

TYPE REASON ETH00 . SYSTEM & COMPOENT F-Forced- A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling- H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet

. E-Operator Training 5-Reduced Load Licensee Event Report I' 9-Other (LER) File (t0 REG-0161) i

& License Examination ' '

- -- - -- - - u - - -

7 Washington Public Power Supply System 3000 George Washington Way P.O. Box 968 Richland, Washington 9935249 February 8,1985 Docket No. 50-397 Director Office of Resource Management U. S. Nuclear Regulatory Commission Washington D. C. 20555

Dear Sir:

Subject:

NUCLEAR PLANT NO. 2 MONTHLY OPERATING REPORT January 1985 as required by our Technical Specifications 6.9.1.6.

Very truly yours t

. Ma tin (M/D927M)

NP-2 Plant Manager JDM/pl Enclosure cc:

Mr. John B. Martin - NRC, Region V Mr. A. D. Toth - WNP-2 Site Ms. Dottie Sherman - ANI, Farmington, CT gs1G W -