05000354/LER-1995-037, Responds to Enforcement Conference Notification Stating Wish to Waive Attending 960314 Conference.Iaw NRC Enforcement Policy,Relevant Info Re Violations Noted in Insp Rept 50-354/95-19 Provided in LER 95-037-00

From kanterella
(Redirected from ML20101B914)
Jump to navigation Jump to search
Responds to Enforcement Conference Notification Stating Wish to Waive Attending 960314 Conference.Iaw NRC Enforcement Policy,Relevant Info Re Violations Noted in Insp Rept 50-354/95-19 Provided in LER 95-037-00
ML20101B914
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 03/11/1996
From: Storz L
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LR-N96066, NUDOCS 9603150140
Download: ML20101B914 (2)


LER-2095-037, Responds to Enforcement Conference Notification Stating Wish to Waive Attending 960314 Conference.Iaw NRC Enforcement Policy,Relevant Info Re Violations Noted in Insp Rept 50-354/95-19 Provided in LER 95-037-00
Event date:
Report date:
3542095037R00 - NRC Website

text

.r 3 I < ,

Public Service Electnc and Gas Company Louis F. Storz Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 009-339-5700 Senor Vce Presdent Nuclear Operatons g }{

LR-N96066 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Gentlemen:

REPLY TO ENEVRCEMENT CONFERENCE NOTIFICATION HOPE CREEK GENERATING STATION FACILITY OPERATING LICENSE NO. NPF-57 DOCKET NO. 50-354 In Hope Creek Inspection Report 354/95-19, dated January 30, 1996, the NRC identified apparent violations associated with inadequate or ineffective corrective actions associated with the safety auxiliary cooling system (SACS) and the shutdown cooling (SDC) system. The report also indicated that a pre-decisional enforcement conference had been scheduled for March 14, 1996 to discuss the apparent violations.

As discussed between Mr. D. Powell and Mr. L. Nicholson, Public Service Electric and Gas Company (PSE&G) wishes to waive the right to the pre-decisional enforcement conference and does not plan to attend. In accordance with the current NRC Enforcement Policy, PSE&G has provided relevant information concerning the two apparent violations. LER 95-037-00, dated January 3, 1996, provided information for the SACS system issue and LER 95-038-01, dated January 29, 1996, provided preliminary information for the SDC issue. LER 95-038-02 is scheduled for submittal the week of March 11, 1996. These document.3 provide a discussion of the issues, the root causes, the associated corrective actions and PSE&G's position on the safety significance of the issues.

Should you have any questions or need additional information, please do not hesitate to contact us.

Sincerely, y , ,f f' fp y' , / Q '),

9603150140960351 DR ADOCK 0500 4

[ i jp j

@ Pnntedon Recycled Paper '

l-l .: s.

i

- e

[' Document Control Desk 2 MAR 111996 LR-N96066 C: Mr. T. T. Martin, Administrator - Region I 1 U. S. Nuclear Regulatory Commission  ;

475 Allendale Road )

King of Prussia, EA 19406 '

l Mrc D. Jaffe, Licensing Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike-Mail Stop 14E21 Rockville, MD 20852 Mr. R. Summers (SO9)

USNRC Senior Resident Inspector Mr. K. Tosch, Manager, IV Bureau of Nuclear Engineering

33 Arctic Parkway l CN 415- ,

Trenton, NJ 08625 i l

e t

i 95 4933

_ , . _ . - , , _ . _ _ , _ _. . _ _ . _ _ _ _