ML20094D622

From kanterella
Jump to navigation Jump to search
Proposed TS Table 4.3-2 Re ESFAS Instrumentation Surveillance Requirements for Automatic Actuation Logic for Channel Check/Channel Calibr,Channel Functional Test & Modes for Which Surveillance Required
ML20094D622
Person / Time
Site: Waterford Entergy icon.png
Issue date: 12/18/1991
From:
ENTERGY OPERATIONS, INC.
To:
Shared Package
ML20094D618 List:
References
NUDOCS 9112230225
Download: ML20094D622 (4)


Text

_ ___.

~

t 3 .

c TABLE 4.3-2 7]$

w n. .

N 9- ENGINEERED SAFETY FEATURES' ACTUATION SYSTEM'INSTRUMENTA10N SURVEILLANCE REQUIREMENTS Ma oro 8 CHANNEL: - MODES FOR milch-

- Q[$ , CHANNEL CHANNEL FUNCT10NAL. SURVEILLANCE o g e- TUNCTIONAL UNIT CHECK CALIBRATION ' TEST IS REQUIRED a- 5 8C

  • i: 1. SAFETY INJECTION (SIAS) '

- @Sg " a. . Manual (Trip ~9uttons). N.A. N.A. R

' 1, 2, 3, 4 om

  • b. Containment Pressure - High S R Q 1,'2, 3
c.  : Pressurizer Pressure - Low .5 d.

R 0 1._ 2 3 -

, (AutomaticActuationLogic- N.A. N.A. P(2) (3) (6) 1, 2,_

EEPuG WW '-

2.

Iro^v *6

a. Manual (Trip Buttons). 'N.A. N.A. R 1,2,3,4 b .- Containment Pressure.--

Hign -'High- 1 R - Q_ l c.

t w @ tomatic' Actuation Logic ___ _ NTA._ NT. M(1) (2 F(3) _1,_2,1m2% 3f- Rensve *

h m 3. CONTAINMENT IS0ttiTION (CIAS). It4%JCr th*-

,', .a. Manual CIAS (Trip. Buttons) N.A. N.A. R 1. 2, 3, 4 m b.

Containment ?ressure.- High- S 2 Q 1, 2 't
c. j ,

PJ essurizer Pressure - Low S R .Q- 1 2,_3 4 1,;2, 3%d i

d. (Automaff{ActTafioWLogic

"~

j N. A. N.A.

M(1)_(ZT(3) ,

4. MAIN STEAM LINE ISOLATION r
a. Manual (Trip Buttons)' N.A.

f '

N.A. R 1, 2, 3

b. Steam Generator Pressure - Low S R q 1,2,3  !
c. Containment Pressure - High' S R 1, 2u36
d. (Fut~omaMc_ActuationLo7gc; N.A. N.A. -Q(1)12]_'(3) I,3 M M -

3 m

5 . >

"i 5  !

9 e'

4

g. TABLE 4.3-2 (Continued) ,

O g ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS El i x CilANNEL MODES FOR MIICH I CHANNEL CHANNEL FUNCTIONAL SURVEILLANCE FUNCTIONAL UNIT CilECK CALIBRATION TEST 15 REQUIRED

[

z U 5. SAFETY INJECTION SYSTEM w RECIRCULATION (RAS)

a. Mant:a1 RAS (Trip Buttons) N.A. N.A. R 1, 2, 3, 4
b. Refueling Water Storage i Pool - Low- 5 R 0 1,2,3 d4 l I
c. goiidtR AUGation Logic N.A. N.A. M(1) (2) (3) 1 Z, 3.j4V ,

a nAcE

6. LOS$ OF POWER (LOV) w tr u
a. 4.16 kV Emergency Pus gg %-

Undervoltage (Loss of Voltage) N.A. R D(4) 1, 2, 3 y b. 480 V Emergency Bus Undervoltage (Loss of Voltage) H.A. R D(4) 1, 2, 3

[

m c. 4.16 kV Emergency Bus Undervoltage (Degraded Voltage) H.A. R D(4) 1, 2, 3 i

n '

5

,9,

'i 5

i:

4

.g TABLE 4.3.-2 (Continued)

O .

g ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS:

8 g .

CHANNEL M00ES FOR MIICH

, CHANNEL CHANNEL FUNCTIONAL SURVEILLANCE c FUNCTIONAL UNIT -

CilECK CALIBRATION TEST IS REQUIRED' 5

  • 7. EMERGENCY FEEDWATER (EFAS) w a. . Manual'(Trip Buttons) N. A. N.A. R 1, 2, 3
b. SG Level-(1/2)-Low and AP.(1/2) - High 5- R Q- 1,2,3
c. SG Level (1/2) Low and No

.Pressura - tow Trip E /2) S' R Q I m/2 3

d. (Automatic Actuation'Loalc_ _. N.A. N.A. .M(1) (2) (3) 1, 2, 37
e. Control Valve togic . 5 R 5A(ST 1, 2, 3* Rerws (Wide Range SG Level - Low) wem IMsGRr A' -

1 Y

'S TABLE NOTATION (1) Each train or ,: sic channel shall be tested at least every 62 days on a STAGGERED TEST'8 ASIS.

(2) Testing of Automatic Actuation Logic'shall include energization/deenergization of each initiation relay and verification of the OPERABILITY of each initiatien relay.

(3) A subgroup relay test shall be performed which shall include the energization/deenergization of each i kg subgroup relay'and verification of the OPERABILITY-of each subgroup relay.- Relays K109, K114, K202, K301, K305,- K308 as,d K313 are exempt from testing during power operation but shall be tested at least g once per 18 months and during each COLD SHUTDOWN condition unless tested within the previous 62 days.

'I (4) Using installed test switches.

c>

(5) To be performed during each COLD SHUTDOWN if not performed in the previous 6 months.

@ (6) Each train shall be tested, with the exemption of relays, K110, K410 and K412,'at least every 62 days on a STAGGERED TEST BASIS. Relays K110, K410 and K412 shall be tested at least every 62 days but will be exempt fron'the STAGGERED TEST BASIS.

E'

. 4

, >  ; . D . i E

. ? .- .p h

~

. t_

. m m

33 33 22 22 .

11 11 _

) a

) 6 3 (

(

) ) ) )

21 23 .

(( ((

QM QM t

A. A. A. A.

NN NN "A B +

t t r r m e e s s n I n

I A. A. A. A.

NN NN

)

esy r ) s csy iya iya gal gal

_ ol e ol e LeRr LeRr n .p op u op up n e iu o iu o t

or a rg t

a rg or t

ug b tu g u. m _

cbu cb u AuS s AuS s F

1

. c t n i c t n '

i

- t po t po v aei aet i mca t mca oxu oxu T

t t et u (e ct u( c A A A A 1