ML20199D985

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs,Adding Requirement That CR Intake Monitors Be Operable & SRs Be Applicable During Movement of Irradiated Fuel
ML20199D985
Person / Time
Site: Waterford Entergy icon.png
Issue date: 01/12/1999
From:
ENTERGY OPERATIONS, INC.
To:
Shared Package
ML20199D966 List:
References
NUDOCS 9901200280
Download: ML20199D985 (6)


Text

- _.

+-

\\

4 l.

n I

1 l

l P

I 1

t-.

l 1

NPF-38-204 Revision 1 I

I ATTACHMENT A i

EXISTING SPECIFICATIONS

(

I l

l l

l-L i

l t

L i

L i

9901200280 990112 1

2 PDR ADOCK 05000382..'

p PDR L.

=

l l

l l

l-

l NPF-38-204 Revision 1 ATTACHMENT B PROPOSED SPECIFICATIONS l

(

- -. -.... n. -.... -. - -..

- --. ~

v TABLE 3.3-6 RADIATION IHilT98111G INSTRIBEllTATION MINIMist t

CHANNELS APPLICABLE ALAltt/ TRIP MEASUREMENT litSTMBENT OPERABLE BEDES SETPOINT RANGE ACIIGli 1.

AREA IUllTORS s

a.

Fuel Storage Pool Area Fuel Handling Buildtag Ventilation System s 100 mR/h 10 - 10' mR/h' 24 Isolation 2

b.

Containment - Purge &

1/ train 1, 2, 3, 4 & **

40 mR/h or 20 - 5x10 mR/h 25 i

5 Exhaust Isolation s 2x background whichever is i

Higher 2.

PROCESS MONITORS i

t a.

Containment Atmosphere t

1)

Gaseous Activity 4

RCS Leakage Detection 1

1, 2, 3, & 4 flot Applicable 10

- 10 pCi/cc 23 4

2)

Particulate Activity RCS Leakage Detection 1

1, 2, 3, & 4 flot Applicable 10'" - 104 pC1/cc 23 b.

Control Room Intake Monitors 1/ intake ALL MODES s 5.45x10 pC1/cc 10

- lo-a pC1/cc 26 4

4

(

c.

Steam Generator Blowdown Monitor 1

1, 2, 3, & 4 5 10'8 pC1/cc 10

- 10 pC1/cc 28 4

d.

Component Cooling Water Monitors AaB 1/)ine ALL MODES

$ 10 pC1/cc 10'# - 10 pC1/cc 28 5

4 e.

Component Cooling Water u

Monitor A/B 1

1, 2, 3, & 4 s 10 pCi/cc 10'T - 10'2 pCl/cc 28 U

4

  • With irradiated fuel in the storage pool.

l WATERFORD - UNIT 3 3/4 3-29 Amendment No. 66PM,Il4

.i j

^

TABLE 3.3-6

~

RADIATION ENITORIM INSTIRNENTATIGil MINIORNE CHRlWIELS APPLICABLE AUWUl/ TRIP MEASUREMENT t

INSTRINENT OPERABLE MDES SETPOINT RANGE ACTIGE l 1.

AREA IMIITORS s.

Fuel Storage Pool Area Fuel Handling Su11 ding l

Ventilation System Isolation 2

s 100 mR/h 10 - 10' mR/h' 24 b.

Containment - Purge &

1/ train 1, 2, 3, 4 & **

40 uA/h or 20 - 5x10' mR/h 25 Exhaust Isolation s 2x background whichever is Higher l

l 2.

PRDCESS MONITORS a.

Containment Atmosphere 1)

Gaseous Activity i

RCS Leakage Detection 1

1, 2, 3, & 4 flot Applicable 10

- 10 pC1/cc 23 4

l 2)

Particulate Activity RCS Leakage Detection 1

1, 2, 3, & 4 flot Applicable 10'" - 10 pC1/cc 23 b.

Control Room Intake Monitors 1/ intake ALLMODESk 5 5.45x10 pC1/cc 10 a pcl/cc 26 4

c.

Steam Generator Blowdown 4

Monitor 1

1, 2, 3, & 4 5 10'5 pC1/cc 10

- 10 pC1/cc 28 j

i d.

Component Coo 11ag Water l

Monitors AEB 1/11ne ALL MODES 5 10 pC1/cc 10 - 10'2 pC1/cc 28 4

e.

Component Coeling Hater Monitor A/B 1

1 2, 3, & 4 510' pCilcc 10 7 - 10.a pC1/cc 28 i

  • With irradiated fuel in the storage pool.

r C E ALTERATWJ45 or ement of rradiat fuel t:ithin the containment.

I 4 * + Du rn,y w o o e r.r e., / s f nre s/,

fd M L

-=--

66 94,114 fl j ;

WATERFORD - UNIT 3 3/4 3-29 Amendment No.

1 l

. _..... _. = - _... _ _ _.

..m f

6 IAllil 4.3 3 R[41.l A T.10N MUN i l 0R I NG_I NS l RUME N I A l l 0N SURVI I L L ANCE REQU I REME NI_S CNANNtl -

MODES FOR WNICH.

CHANNil CHANNIL FUNCil0NAL SURVEILLANCE INSTRUMEN_T

. tlM CK_

CAL _lBRA1_1.ON TEST IS REOUIRED L

1.

AREA MONITORS

+

a.

Fuel Storage Pool Area Fuel Handling Building

(

Ventilation System i

Isolation S

R Q-l!

i b.

Containment - Purge &

Exhaust isolation 5

R Q

1, 2, 3, 4 4 **

I{

f 2.

PROCESS MONITORS a.

Containment Atmosphere f

1)

Gaseous Activity -

RCS Leakage Detection S

R Q

1, 2, 3, & 4 2)

Particulate Activity -

RCS Leakage Detection S

R Q

1, 2, 3, & 4 l

b.

Control Room Intake Monitors S

6 q

ALL MODES I-c.

Steam Generator Blowdown S

R Q

1,2,3,44 l

d.

Component Cooling Water Monitors ASB S

R Q

ALL MODFS I(

I e.

Component Cooling Water

[

Monitor A/B S

R Q

1, 2, 3 & 4 li t

  • With irradiated fuel in the storage pool.

l

    • During CORE Alif RAll0NS or movement of irradiated fuel within the containment.

L WATERFORD - UNIT 3 3/4 3-32 Amendment l'o. 91-96

+

IAlt!I 4.3 3 RADIAL 10N MUNil0 RING _INslRUNtNIAll0N SURVIltLANCE REQUIRt_NENTS CHANNEL MODES FOR WHICH tflANNiI CHANNEL FUNCI10NAL SURVEILLANCE IN51 RUNE.N_T

. tift ?K_

CAL _18RA1_1.ON T[Si 15 REQUIRED 1.

AREA MONITORS a.

Fuel Storage Pwl Area Fuel Handling Building Ventilation > System Isolation S

R Q

b.

Containment - Purge &

[

Exhaust Isolation S

R Q

I, 2, 3, 4 & **

3 i

2.

PROCESS MONITORS i

a.

Containment Atmosphere

[

1)

Gaseous Activity -

RCS Leakage Detection S

R Q

1, 2, 3, & 4 2)

Particulate Activity -

RCS Leakage Detection S

R Q

! 2: 1, & 4 l

b.

Control Room Intake Monitors S

R Q

Al_L igDWL5 /W j

t c.

Steam Generator Bioudown S

R Q

1,2,3,44 l

i d.

Component Cooling Water Monitors A48 5

R Q

Att M00f5 i

i e.

Component Cooling Water Monitor A/8 5

R Q

1, 2, 3, & 4

  • With irradiated fuel in the storavic pool.

M adiated fuel within the containment.

l r

CORE At I Al r

t +

n, m m..,e m e.d o i>res% fr / Su et, i

, W [

3/4 3-32 Amendment No. 91r %

l t

i

-