Proposed Tech Specs Pages,Adding Footnote to TS Refueling Operations,Surveillance Requirements 4.9.7.2,to Effect Limited Deviation to Allow Crane Main Hook Electrical Interlocks to Be Replaced W/Administrative Controls
ML20249A310
Person / Time
Site: Waterford Entergy icon.png
Issue date: 06/12/1998
From:
ENTERGY OPERATIONS, INC.
To:
Shared Package
ML20249A306 List:
References
NUDOCS 9806160293
Download: ML20249A310 (5)


Text

-

^ *

~

-REFUELING OPERATIONS 3/4.9.7 CRANE TRAVEL - FUEL HANDLING BUILDING LINITING CONDITION FOR OPERATION 3.9.7_ Cranes in the fuel handling building shall be restricted as follows:

a.

The spent fuel handling machine shall be used* for the movement of.

I fuel assemblies (with or without,CEAs) and shall be OPERA 8LE with:

1.

A minimum hoist capacity of 1800 pounds, and 2.

An overload cutoff limit of less than or equal to 1900 pound:;,

and,

~

b.

' Loads in excess of 2000 pounds shall be prohibited from travel over fuel assemblies in the spent fuel pool.

APPLICA8ILITY: During movement of fuel assemblies in the fuel handling building, or with fuei assemblies in the spent fuel pool.

ACTION:

a.

With the spent fuel handling machine inoperabl6, suspend the use of the spent fuel handling machine for movement of fuel assemblies and place the crane load in a safe position.

b.

With loads in excess of 2000 pounds over fuel assemblies in the

~

spent fuel pool, place the crane load in a safe position.

c.

The provisions of Specification 3.0.4 are not applicable.

l SURVEILLANCE REQUIREMENTS

' 4.9.7.1 The spent fuel handling machine shall be demonstrated OPERA 8LE within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> prior to the start of fuel assembly movement and at least once per 7 days thereafter by performing a load test of at least 1800 pounds and demon-strating the automatic load cutoff when the hoist load exceeds 1900 pounds.

4.07.2 The electrical interlock system which prevents crane main hook travel

- over' fuel assemblies'in the spent fuel pool shall'be demonstrated GPERA8LE within 7 days prior to crane use and at least once per 7 days thereafter during crane operation.

L

- 4.9.7.3_

Administrative controls which prevent crane auxiliary hook travel with loads in excess of 2000 pounds over the fuel assemblies in the spent fuel pool shall be enforced during crane operations.

I 1

  • Not required for movement'of new fuel' assemblies outside the spent fuel pool.

?

~

. WATERFORD 4 UNIT 3; 3/4 9-7 f Amendsent No. 6 y

9 0

4 8

s ATTACHMENT 2

i REFUELING OPERATIONS 3/4.9.7, CRANE TRAVEL - FUEL HANDLING BUILDING LfMITING CONDITION FOR OPERATION 3.9.7 Cranes in the fuel handling building shall be restricted as follows:

a. The spent fuel handling machine shall be used* for the movement of fuel assemblies (with or without CEAs) and shall be OPERABLE with:
1. A minimum hoist capacity of 1800 pounds, and l
2. An overload cutoff limit of less than or equal to 1900 pounds,
and,
b. Loads in excess of 2000 pounds shall be prohibited from travel over irradiated fuel assemblies in the Euel Handlina Buildina. spent 4uekpoob APPLICABILITY: During movement of gadiated fuel assemblies in the fuel handling building, or with irradiated fuel assemblies in thu Fuel Handlina Buildina. spent 4uelpoob ACTION:
a. With the spent fuel handling machine inoperable, suspend the use of the spent fuel handling machine for movement of fuel assemblies and place the crane load in a safe position.
b. With loads in excess of 2000 pounds over irradiated fuel assemblies in the Fuel Handlina Buildina. spent 4ueLpool, place the crane load in a safe position.

]

l

c. The provisions of Specification 3.0.4 are not applicable.

EURVElf l_ ANCE REQUIREMENTS 4.9.7.1 The spent fuel handling machine shall be demonstrated OPERABLE within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> prior to the j

start of fuel assembly movement and at least once per 7 days thereafter by performing a load test of at least 1000 pounds and demonstrating the automatic load cutoff when the hoist load exceeds 1900 pounds.

4.9.7.2 The electrical interlock system which prevents crane main hook travel over irradiated fuel d

assemblies in the Fuel Handlina Buildina spent 4uerpool.shall be demonstrated O RABLE within 7 days F~l prior to crane use and at least once per 7 days thereafter during crane operation.

D 4.9.7.3 Administrative controls which prevent crane auxiliary hook travel with loads in excess of 2000 pounds over the irradiated fuel assemblies in the Fuel Handlina Puilding_ spent 4uetpookshall be enforced l.g O

during crane operations.

O ut o

>~~db q!

$^

Q 2r

-4 tl F

  • Not required for movement of new fuel assemblies outside the spent fuel pool and cask storaae oit.

D

  1. The crane main hook electrical interlocks may be replaced with administrative controls for activities associated with the implementation of the spent fuel rerack proiect beina performed prior to Refuelina Outaae 9. While these administrative controls are in olace. the performance of SR 4.9.7.2 is not reacired.

WATERFORD - UNIT 3 3/4 9-7 AMENDMENT NO. 6

4 10 t

D 9

ATTACHMENT 3

[

REFUELING OPERATIONS 3/4.9.7 CRANE TRAVEL - FUEL HANDLING BUILDING l

t IMITING CONDITION FOR OPERATION 3.9.7 Cranes in the fuel handling building shall be restricted as follows:

a. The spent fuel handling machine shall be used* for the movement of fuel assemblies (with or without CEAs) and shall be OPERABLE with:
1. A minimum hoist capacity of 1800 pounds, and
2. An overload cutoff limit of less than or equal to 1900 pounds,
and,
b. Loads in excess of 2000 pounds shall be prohibited from travel over irradiated fuel assemblies in the Fuel Handling Building.

APPLICABil.lTY: During movement of irradiated fuel assemblies in the fuel handling building, or with.

Irradiated fuel assemblies in the Fuel Handling Building.

ACTION:

a. With the spent fuel handling machine inoperable, suspend the use of the spent fuel handling machine for movement of fuel assemblies and place the crane load in a safe position,
b. With loads in excess of 2000 pounds over irradiated fuel assemblies in the Fuel Handling Building, place the crano load in a safe position.
c. The provisions of Specification 3.0.4 are not applicable.

SURVFili ANCE REQUIREMENTS 4.9.7.1 The spent fuel handlicy machine shall be demonstrated OPERABLE within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> prior to the start of fuel assembly movemert and at least once per 7 days thereafter by performing a load test of at least 1800 pounds and demondrating the automatic load cutoff when the hoist load exceeds 1900 pounds.

4.9.7.2 The electricalinterlock system which prevents crane main hook travel over irradiated fuel assemblies in the Fuel Handling Building shall be demonstrated OPERABLE within 7 days prior to crane use and at least once per 7 days thereafter during crane operation. #

4.9.7.3 Administrative controls which prevent crane auxiliary hook travel with loads in excess of 2000 pounds over the irradiated fuel assemblies in the Fuel Handling Building shall be enforced during crane l

operations.

  • Not required for movement of new fuel assemblies outside the spent fuel pool and cask storage pit.
  1. The crane main hook electricalinterlocks may be replaced with administrative controls for sctivities associated with the implementation of the spent fuel rerack project being performed prior to Refueling

, Outage 9. While these administrative controls are in place, the performance of SR 4.9.7.2 is not required.-

WATERFORD - UNIT 3 3/4 9-7 AMENDMENT NO. 6