EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) i
- 1. Each time HPSI Pump A/B is placed in or taken out of service in place of HPSI Pump A or B, the pump being placed in service shall be demonstrated OPERABLE by:
- 1. Verifying that each valve in the flow path is in its correct position; and
- 2. Verifying the pump starts manually and upon receipt of a SIAS test signal; and i
- 3. Performing Surveillance Requirement 4.5.2f.1., if not previously accomplished within the required frequency.
J. Following any maintenance which drains portions of the system, by venting the ECCS p=p eMng: end d!: charge piping high pointe venfvina the ECCS ninina is full of water 9705120327 970506 PDR ADOCK 05000382 p
PDR WATERFORD - UNIT 3 3/4 5-7 AMENDMENT NO.
-.