Proposed Tech Specs Modifying Wording of SR 4.5.2.j by Replacing Venting ECCS Pump Casings & Discharge Piping High Points, with Verifying ECCS Piping Is Full of Water
ML20140H083
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/06/1997
From:
ENTERGY OPERATIONS, INC.
To:
Shared Package
ML20140H073 List:
References
NUDOCS 9705120327
Download: ML20140H083 (1)


Text

-

8 e

EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) i

1. Each time HPSI Pump A/B is placed in or taken out of service in place of HPSI Pump A or B, the pump being placed in service shall be demonstrated OPERABLE by:
1. Verifying that each valve in the flow path is in its correct position; and
2. Verifying the pump starts manually and upon receipt of a SIAS test signal; and i
3. Performing Surveillance Requirement 4.5.2f.1., if not previously accomplished within the required frequency.

J. Following any maintenance which drains portions of the system, by venting the ECCS p=p eMng: end d!: charge piping high pointe venfvina the ECCS ninina is full of water 9705120327 970506 PDR ADOCK 05000382 p

PDR WATERFORD - UNIT 3 3/4 5-7 AMENDMENT NO.

-.