Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20217K9011999-10-18018 October 1999 Proposed Tech Specs 3.6.2.2 Loc,Allowing Plant to Operate with Two Independent Trains of Containment Cooling, Consisting of One Fan Cooler Per Train,Operable During Modes 1,2,3 & 4 ML20211F3701999-08-24024 August 1999 Proposed Tech Specs,Revising Efas,Originally Submitted on 980702 as TS Change Request NPF-38-207 ML20211F5501999-08-24024 August 1999 Proposed Tech Specs Page Xviii, Index Administrative Controls, Originally Submitted with TS Change Request NPF-38-220 ML20210M9681999-08-0404 August 1999 Existing & Proposed marked-up TS Pages Modifying TS 3.5.2 by Extending AOT to Seven Days for One LPSI Train Inoperable & AOT of 72 Hours Imposed for Other Conditions ML20210M9861999-08-0404 August 1999 Existing & Proposed TS Pages Modifying TS 3.5.2 by Extending AOT to Seven Days for One HPSI Train Inoperable & TS 3.5.3, Changing end-state to Hot Shutdown with at Least One Operable Shutdown ML20210H2371999-07-29029 July 1999 Proposed Tech Specs 3.6.2.1 Extending Allowable Outage Time to Seven Days for One Containment Spray Sys Train Inoperable ML20210H1771999-07-29029 July 1999 Proposed Tech Specs 3.8.1.1 Re EDG AOT Increase from 72 H to Ten Days ML20210B3411999-07-19019 July 1999 Proposed Tech Specs 4.5.2.f.2,increasing Performance Requirement for LPSI Pumps ML20209H3191999-07-15015 July 1999 Proposed Tech Specs Pages Modifying TS 3/4.4.8.1,Figures 3.4-2 & 3.4-3 to Extend RCS Pressure Temperature Curves to 20 EFPY ML20210D0521999-07-15015 July 1999 Proposed Tech Specs Creating New TS for Feedwater Isolation Valves ML20210D1071999-07-15015 July 1999 Proposed Tech Specs Adding TS Bases Control Program to TS Administrative Controls Section & Correcting Editorial Error Identified in TS Following Issuance of Amend 146,dtd 981019 ML20209D4091999-07-0707 July 1999 Proposed Tech Specs,Revising Actions 19 & 20 for Table 3.3-3 for Functional Unit 7 Emergency Feedwater, Items B & C,Per 980702 TS Change Request NPF-38-207 ML20195B1811999-05-20020 May 1999 Proposed Tech Specs Changes to Bases B 3/4.3.1 & 3/4.3.2, B 3/4.6.3,B 3/4.7.1.2 & B 3/4.7.12 ML20203C4891999-02-0505 February 1999 Proposed Revised Tech Specs Pages 3/4 3-12a & B 3/4 3-1a Re Reactor Trip Circuit Breaker Surveillance Interval Extension ML20199E0861999-01-12012 January 1999 Proposed Tech Specs Re Rev 1 for TS Change Request NPF-38-174 ML20199D9851999-01-12012 January 1999 Proposed Tech Specs,Adding Requirement That CR Intake Monitors Be Operable & SRs Be Applicable During Movement of Irradiated Fuel ML20198G2401998-12-23023 December 1998 Proposed Tech Specs,Modifying LCO for 3.3.3.7.1 for Chlorine Detection Sys by Changing Alarm/Trip Setpoint from 3 Ppm to 2 Ppm ML20196D2181998-11-30030 November 1998 Proposed Tech Specs Pages 3/4 8-8,3/4 9-8,3/4 9-9 & B 3/4 9-2,revised for Consistency Between Action Statements & NUREG-1432,Rev 1, Std Tech Specs for CE Plants ML20154E4171998-10-0606 October 1998 Proposed Tech Specs Pages Re TS Change Request NPF-38-212, Modifying Requirement to Perform Mtc Test Near End of Each Cycle ML20154E1141998-10-0101 October 1998 Proposed Tech Specs Modifying TS 3.3.3.7.3 & SR 4.3.3.7.3 for Broad Range Gas Sys ML20153D5771998-09-23023 September 1998 Proposed Tech Specs Revising Description Re Reactor Power Input Used by Operating Bypass Permissive & Trip Enable of 10-4% Bistable ML20153B4441998-09-18018 September 1998 Proposed Tech Specs Modifying Notes in Tables 2.2-1 & 3.3-1 Re Reactor Protective Instrumentation ML20151W5971998-09-11011 September 1998 Proposed Tech Specs Re Notes in Table 2.2-1 Re Reactor Protective Instrumentation Trip Setpoints Limits & Table 3.3-1 Re Reactor Protective Instrumentation ML20237A7921998-08-12012 August 1998 Proposed Tech Specs,Increasing Max Boron Concentration in SITs & Rwsp from 2300 Ppm to 2900 Ppm ML20236U7361998-07-29029 July 1998 Proposed Tech Specs Pages Revising TS 6.9.1.11.1 to Replace Ref to Abb Combustion Engineering SBLOCA ECCS Performance Evaluation Model ML20236H1501998-07-0202 July 1998 Proposed Tech Specs Section 3/4.3.2,adding Restriction on Period of Time Channel of Efas Instrumentation Can Remain in Tripped Condition ML20249C8321998-06-29029 June 1998 Proposed Tech Specs 3.7.6.1,3.7.6.2,3.7.6.3,3.7.6.4 & 3.7.6.5,revising Control Room Ventilation to Be Consistent w/NUREG-1432 ML20249C7901998-06-29029 June 1998 Proposed Tech Specs Adding Footnote to Action Statements to Allow CR Ventilation Sys to Be Unisolated Periodically Under Administrative Controls ML20249A3101998-06-12012 June 1998 Proposed Tech Specs Pages,Adding Footnote to TS Refueling Operations,Surveillance Requirements 4.9.7.2,to Effect Limited Deviation to Allow Crane Main Hook Electrical Interlocks to Be Replaced W/Administrative Controls ML20248B7611998-05-28028 May 1998 Proposed TS Pages Supporting Change to TS 3.7.1.2, Surveillance Requirement 4.7.1.2 & Bases for Emergency Feedwater Sys ML20247P2431998-05-21021 May 1998 Proposed Tech Specs Re Design Feature Suppl ML20217P8411998-05-0101 May 1998 Rev TS Pages Changing Actions Required Should Channel of Recirculation Actuation Signal (RAS) Be Placed in Tripped Condition,Replacing TS Pages Submitted in 970603 Submittal ML20217D5181998-03-25025 March 1998 Proposed TS 3.9.8.1,3.9.8.2,TS Action 3.9.8.2a,3.8.1.2 & Bases 3/4.9.8 ML20198R1251998-01-21021 January 1998 Corrections to Proposed Tech Spec 3/4.1 Re Reactivity Control Sys ML20198R3081998-01-21021 January 1998 Errata to Proposed TS Change Request NPF-38-196 Which Changed TS 3.1.1.1,3.1.1.2,3.10.1 & Figure 3.1.-1 by Removing Cycle Dependent B Concentration & Boration Flow Rate from Action Statements ML20197C6431997-12-22022 December 1997 Proposed Tech Specs Page Supplementing TS Change Request NPF-38-186,by Retaining Operations Superintendent in Paragraph 6.2.2.f of Administrative Controls Section ML20199A1101997-11-13013 November 1997 Proposed Tech Specs,Modifying 6.8.4.a, Primary Coolant Sources Outside Containment to Add Portions of Containment Vacuum Relief Sys & Primary Sampling Sys to Program ML20199A0011997-11-13013 November 1997 Errata to Proposed Tech Specs Change Request NPF-38-193, Replacing Pages 13 Through 21 ML20217G2421997-10-0707 October 1997 Proposed Tech Specs Modifying 3.3.3.7.3 & Surveillance Requirement 4.3.3.7.3 for Broad Range Gas Detection Sys ML20211F8141997-09-25025 September 1997 Proposed Tech Specs Pages Modifying LCO 3.6.1.2, Containment Leakage, Associated Action & SR 4.6.1.2 ML20141G7131997-07-0707 July 1997 Proposed Tech Specs Expanding Applicability of TS 3.7.1.3 to Include Mode 4 Operational Requirements & Maintains 91 Percent Minimum Condensate Storage Pool Level Previously Requested for Modes 1,2 & 3 ML20141D8551997-06-26026 June 1997 Proposed Tech Specs Revising TS Tables 3.7-1 & 3.7-2 by Changing MSSVs Orifice Size from 26 Inches to 28.27 Inches & Relocating Orifice Size from TS to TS Bases ML20140B1671997-06-0303 June 1997 Proposed Tech Specs,Modifying Action Requirements for TS 3/4.3.2 for SI Sys Sump Recirculation Actuation Signal ML20148G6631997-06-0303 June 1997 Proposed Tech Specs,Requesting Minimum Required Level in Condensate Storage Pool Be Increased from 82% to 91% to Account for Vortexing & Instrumentation Measurement Uncertainties ML20141K1741997-05-24024 May 1997 Proposed Tech Specs 3.1.1.1,3.1.1.2,3.10.1 & Figure 3.1-1, Removing Cycle Dependent Boron Concentration ML20141K1951997-05-24024 May 1997 Proposed Tech Specs 3/4.7.4 Modifying Ultimate Heat Sink, Table 3.7-3,by Incorporating More Restrictive Dry Cooling Tower Fan Requirements & Changes Wet Cooling Tower Water Consumption in TS Bases ML20140H0831997-05-0606 May 1997 Proposed Tech Specs Modifying Wording of SR 4.5.2.j by Replacing Venting ECCS Pump Casings & Discharge Piping High Points, with Verifying ECCS Piping Is Full of Water ML20140C8881997-04-17017 April 1997 Proposed Tech Specs,Replacing Attachment to Waterford 3 Submittal W3F1-97-0067,dtd 970407,correcting Oversight ML20137T4051997-04-11011 April 1997 Proposed Tech Specs,Modifying TS 3.3.3.7.3 & SR 4.3.3.7.3 for Broad Range Gas Detection Sys ML20137T4541997-04-11011 April 1997 Proposed Tech Specs Making TS 3.6.2.2 & Surveillance Requirement 4.6.2.2 Consistent W/Containment Cooling Assumptions in Waterford 3 Containment Analysis 1999-08-04
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217K9011999-10-18018 October 1999 Proposed Tech Specs 3.6.2.2 Loc,Allowing Plant to Operate with Two Independent Trains of Containment Cooling, Consisting of One Fan Cooler Per Train,Operable During Modes 1,2,3 & 4 ML20211F5501999-08-24024 August 1999 Proposed Tech Specs Page Xviii, Index Administrative Controls, Originally Submitted with TS Change Request NPF-38-220 ML20211F3701999-08-24024 August 1999 Proposed Tech Specs,Revising Efas,Originally Submitted on 980702 as TS Change Request NPF-38-207 ML20210M9681999-08-0404 August 1999 Existing & Proposed marked-up TS Pages Modifying TS 3.5.2 by Extending AOT to Seven Days for One LPSI Train Inoperable & AOT of 72 Hours Imposed for Other Conditions ML20210M9861999-08-0404 August 1999 Existing & Proposed TS Pages Modifying TS 3.5.2 by Extending AOT to Seven Days for One HPSI Train Inoperable & TS 3.5.3, Changing end-state to Hot Shutdown with at Least One Operable Shutdown ML20210H1771999-07-29029 July 1999 Proposed Tech Specs 3.8.1.1 Re EDG AOT Increase from 72 H to Ten Days ML20210H2371999-07-29029 July 1999 Proposed Tech Specs 3.6.2.1 Extending Allowable Outage Time to Seven Days for One Containment Spray Sys Train Inoperable ML20210B3411999-07-19019 July 1999 Proposed Tech Specs 4.5.2.f.2,increasing Performance Requirement for LPSI Pumps ML20210D0521999-07-15015 July 1999 Proposed Tech Specs Creating New TS for Feedwater Isolation Valves ML20210D1071999-07-15015 July 1999 Proposed Tech Specs Adding TS Bases Control Program to TS Administrative Controls Section & Correcting Editorial Error Identified in TS Following Issuance of Amend 146,dtd 981019 ML20209H3191999-07-15015 July 1999 Proposed Tech Specs Pages Modifying TS 3/4.4.8.1,Figures 3.4-2 & 3.4-3 to Extend RCS Pressure Temperature Curves to 20 EFPY ML20209D4091999-07-0707 July 1999 Proposed Tech Specs,Revising Actions 19 & 20 for Table 3.3-3 for Functional Unit 7 Emergency Feedwater, Items B & C,Per 980702 TS Change Request NPF-38-207 ML20196E9971999-05-24024 May 1999 Rev 3 to NTP-203, Emergency Plan Training ML20195B1811999-05-20020 May 1999 Proposed Tech Specs Changes to Bases B 3/4.3.1 & 3/4.3.2, B 3/4.6.3,B 3/4.7.1.2 & B 3/4.7.12 ML20204H2591999-03-16016 March 1999 Rev 0 to STD-100-237, Procedure for Modification of RCS Pressure Boundary for Installation of Mechanical Nozzle Seal Assemblies (Mnsa) for Waterford Nuclear Generating Station Unit 3 ML20204H2511999-03-16016 March 1999 Rev 1 to C-NOME-EP-0189, Engineering Procedure for Installation of Mechanical Nozzle Seal Assemblies for Waterford 3 ML20203C4891999-02-0505 February 1999 Proposed Revised Tech Specs Pages 3/4 3-12a & B 3/4 3-1a Re Reactor Trip Circuit Breaker Surveillance Interval Extension ML20199D9851999-01-12012 January 1999 Proposed Tech Specs,Adding Requirement That CR Intake Monitors Be Operable & SRs Be Applicable During Movement of Irradiated Fuel ML20199E0861999-01-12012 January 1999 Proposed Tech Specs Re Rev 1 for TS Change Request NPF-38-174 ML20198G2401998-12-23023 December 1998 Proposed Tech Specs,Modifying LCO for 3.3.3.7.1 for Chlorine Detection Sys by Changing Alarm/Trip Setpoint from 3 Ppm to 2 Ppm ML20196D2181998-11-30030 November 1998 Proposed Tech Specs Pages 3/4 8-8,3/4 9-8,3/4 9-9 & B 3/4 9-2,revised for Consistency Between Action Statements & NUREG-1432,Rev 1, Std Tech Specs for CE Plants ML20154E4171998-10-0606 October 1998 Proposed Tech Specs Pages Re TS Change Request NPF-38-212, Modifying Requirement to Perform Mtc Test Near End of Each Cycle ML20154E1141998-10-0101 October 1998 Proposed Tech Specs Modifying TS 3.3.3.7.3 & SR 4.3.3.7.3 for Broad Range Gas Sys ML20153D5771998-09-23023 September 1998 Proposed Tech Specs Revising Description Re Reactor Power Input Used by Operating Bypass Permissive & Trip Enable of 10-4% Bistable ML20153B4441998-09-18018 September 1998 Proposed Tech Specs Modifying Notes in Tables 2.2-1 & 3.3-1 Re Reactor Protective Instrumentation ML20151W5971998-09-11011 September 1998 Proposed Tech Specs Re Notes in Table 2.2-1 Re Reactor Protective Instrumentation Trip Setpoints Limits & Table 3.3-1 Re Reactor Protective Instrumentation ML20237A7921998-08-12012 August 1998 Proposed Tech Specs,Increasing Max Boron Concentration in SITs & Rwsp from 2300 Ppm to 2900 Ppm ML20236U7361998-07-29029 July 1998 Proposed Tech Specs Pages Revising TS 6.9.1.11.1 to Replace Ref to Abb Combustion Engineering SBLOCA ECCS Performance Evaluation Model ML20236H1501998-07-0202 July 1998 Proposed Tech Specs Section 3/4.3.2,adding Restriction on Period of Time Channel of Efas Instrumentation Can Remain in Tripped Condition ML20249C8321998-06-29029 June 1998 Proposed Tech Specs 3.7.6.1,3.7.6.2,3.7.6.3,3.7.6.4 & 3.7.6.5,revising Control Room Ventilation to Be Consistent w/NUREG-1432 ML20249C7901998-06-29029 June 1998 Proposed Tech Specs Adding Footnote to Action Statements to Allow CR Ventilation Sys to Be Unisolated Periodically Under Administrative Controls ML20249A3101998-06-12012 June 1998 Proposed Tech Specs Pages,Adding Footnote to TS Refueling Operations,Surveillance Requirements 4.9.7.2,to Effect Limited Deviation to Allow Crane Main Hook Electrical Interlocks to Be Replaced W/Administrative Controls ML20248B7611998-05-28028 May 1998 Proposed TS Pages Supporting Change to TS 3.7.1.2, Surveillance Requirement 4.7.1.2 & Bases for Emergency Feedwater Sys ML20248H7871998-05-25025 May 1998 Rev 1 to Waterford Unit 3 Second Interval ISI Plan ML20247P2431998-05-21021 May 1998 Proposed Tech Specs Re Design Feature Suppl ML20217P8411998-05-0101 May 1998 Rev TS Pages Changing Actions Required Should Channel of Recirculation Actuation Signal (RAS) Be Placed in Tripped Condition,Replacing TS Pages Submitted in 970603 Submittal ML20217L9971998-04-30030 April 1998 Small Break LOCA ECCS Performance Analysis Using Abb/Ce Suppl 2 Model ML20217D5181998-03-25025 March 1998 Proposed TS 3.9.8.1,3.9.8.2,TS Action 3.9.8.2a,3.8.1.2 & Bases 3/4.9.8 ML20198R3081998-01-21021 January 1998 Errata to Proposed TS Change Request NPF-38-196 Which Changed TS 3.1.1.1,3.1.1.2,3.10.1 & Figure 3.1.-1 by Removing Cycle Dependent B Concentration & Boration Flow Rate from Action Statements ML20198R1251998-01-21021 January 1998 Corrections to Proposed Tech Spec 3/4.1 Re Reactivity Control Sys ML20197C6431997-12-22022 December 1997 Proposed Tech Specs Page Supplementing TS Change Request NPF-38-186,by Retaining Operations Superintendent in Paragraph 6.2.2.f of Administrative Controls Section ML20202C2911997-12-0101 December 1997 Rev 0 to Pump & Valve Inservice Test Plan for Second 10-Yr Interval. Page 23 of Incoming Submittal Not Included ML20199A0011997-11-13013 November 1997 Errata to Proposed Tech Specs Change Request NPF-38-193, Replacing Pages 13 Through 21 ML20199A1101997-11-13013 November 1997 Proposed Tech Specs,Modifying 6.8.4.a, Primary Coolant Sources Outside Containment to Add Portions of Containment Vacuum Relief Sys & Primary Sampling Sys to Program ML20217M0221997-10-28028 October 1997 Rev 8 to RW-001-210, Process Control Program ML20217H5931997-10-14014 October 1997 Revised Page of App B of FOL, Environ Protection Plan (Nonradiological) ML20217G2421997-10-0707 October 1997 Proposed Tech Specs Modifying 3.3.3.7.3 & Surveillance Requirement 4.3.3.7.3 for Broad Range Gas Detection Sys ML20211F8141997-09-25025 September 1997 Proposed Tech Specs Pages Modifying LCO 3.6.1.2, Containment Leakage, Associated Action & SR 4.6.1.2 ML20141G7131997-07-0707 July 1997 Proposed Tech Specs Expanding Applicability of TS 3.7.1.3 to Include Mode 4 Operational Requirements & Maintains 91 Percent Minimum Condensate Storage Pool Level Previously Requested for Modes 1,2 & 3 ML20141D8551997-06-26026 June 1997 Proposed Tech Specs Revising TS Tables 3.7-1 & 3.7-2 by Changing MSSVs Orifice Size from 26 Inches to 28.27 Inches & Relocating Orifice Size from TS to TS Bases 1999-08-04
[Table view] |
Text
- _ - _ - - _ _ _ - _ . . - . .- _ _ -_ . - _ - - - - _ _ _ _ - _ ___ _ - _ _ _ _ __.
sy
, ;C TABLE 3.7-3 i ULTIMATE HEAT SINK MINIMUM FAN REQUIREMENTS PER IMjE -
DRY COOLING TOWER AMBIENT CONDITION DRY BULB 2 98*F < 98"F DRY BULB 2 91*F < 91*F DRY BULB 1 77*F DRY BULB < 77*F Fan 15 14* 12* 9*
Requirements"'
. WET COOLING TOWER AMBIENT CONDITION WET BULB 2 75"F < 75"F WET BULB 2 70 T WET BULB < 70*F Fan 8 7** 4**
Requirements"3 -
(1) With any of the above reouired UHS fan in0Derable CORDlv with ACTION d.
- With a tornado watch in effect. all 9 DCT fans under the missile protected nortion of the DCT shall be OPERABLE.
- With any WCT fan (s) out-of-service in any cell. covers must be in place on the out-of-service fan (s) or the entire cell (i.e. 4 fans) must be declared out-of-service. If four fans are out of service in the same cell. the covers do not have to be installed.
WATERFORD - UNIT 3 , 3/4 7-14 AMENDMENT NO. 95,123
~
9705200364 970524 PDR ADOCK 05000382 P PDR
F , PLANT SYSTEMS BASES
.3/4.h.4 ULTIMATE HEAT SINK The limitations on the ultimate heat sink level, temperature, and number of fans ensure that sufficient cooling capacity is available to either (1) provide normal cooldown of the facility, or (2) to mitigate the effects of accident conditions within acceptable limits.
The UHS consists of two dry cooling towers (DCTs), two wet cooling towers (WCTs), and water stored in WCT basins. Each of two 100 percent capacity loops employs a dry and wet cooling tower. l Each DCT consists of five separate cells.. Cooling air for each cell is provided by 3 fans, for a total of 15 per DCT. The cooling coils on three cells of each DCT (i.e. 60%) are protected from tornado missiles by grating located above the coils and capable of withstanding tornado missile impact.
With a Tornado Watch in effect and the number of fans OPERABLE within the missile protected area of a DCT less than that required by Table 3.7-3, ACTION c requires the restoration of tnoperable fans within I hour or plant l shutdown as specified. This ACTION is based on FSAR analysis (subsection 9.2.5.3.3) that assumes the worst case single failure as, I emergency diesel generator coincident with a loss of offsite power. This failure occurs subsequent to a tornado strike and 60% cooling capacity of a DCT is assumed available.
Each WCT has a basin which is capable of storing sufficient water to bring the plant to safe shutdown under all accident conditions. Item a of LCO 3/4.7.4 requires a minimum water level in each WCT basin of 97% (-9.86 ft MSL). The bases for this elevation is WCT water evaporation and drift loss calculations, which concluded that during a LOCA 168,738 gallons would be -
consumed from one WCT basin. When the WCT basin water level is maintained at .
-9.86 ft MSL, each basin has a minimum capacity of 174,000 gallons. Each WCT l consists of two cells, each cell is serviced by 4 induced draft fans, for a l total of 8 per WCT. There is a concrete partition between the cells that l prevents air recirculation between the fans of each cell. Covers are required I on fans declared out-of-service to prevent air recirculation between fans within a cell.
Table 3.7-3 specifies increased or decreased fan OPERABILITY requirements based on outside air temperature and humidity. The table provides the cooling tower fan OPERABILITY requirements that may vary with outside ambient conditions. Fan OPERABILITY requirements are specified for each controlling parameter (i.e., dry bulb temperatures for. DCT fans and wet bulb temperatures for WCT fans). The calculated temperature values (EC-M95-009) associated with DCT and WCT fan requirements have been rounded in the conservative direction .
and lowered one full degree to account for minor inaccuracies. Failure to meet the OPERABILITY requirements of Table 3.7-3 requires entry into the tpplicable action. -Because temperature and humidity are subject to change during the day, ACTION d requires periodic temperature readings to verify compliance with Table 3.7-3 when any cooling tower fan is inoperable.
The limitations on minimum water level and maximum temperature are based
- on providing a 30-day cooling water supply to safety-related equipment without exceeding their design basis temperature and is consistent with the' recommend-ations of Regulatory Guide 1.27, " Ultimate Heat Sink for Nuclear Plants," j March 1974. 1 WATERFORD - UNIT 3 B 3/4 7-4 AMENDMENT NO. M ,123 l
~
- . ~
Y q 94 1
1 I
l 1
i i
1 I
l l
l l
l
(
NPF-38-197 1
ATTACHMENT B 1
l I
l l
i L
i
-e i
,Ll*.
TABLE 3.7-3 ,
ULTIMATE HEAT SINK MINIMUM FAN REQUIREMENTS PER TRAIN DRY COOLING TOWER AMBIENT CONDITION DRY BULB 2 98*F < 98 F DRY BULB 2 91*F < 91*F DRY BULB 1
Fan 15 14* 12* t Requirements (1) i WET COOLING TOWER
^
AMBIENT CONDITION WET BULB 2 75 F < 75 F WET BULB 2 70 F WET BULB < 70 F L
Fan 8 7** 4" I Requirements (1) .l (1) With any of the above required UHS fan inoperable comply with AOTION d.
- With a tomado watch in effect. all 9 DCT fans under the missile protected portion of the DCT shall be OPERABLE.
2
" With any WCT fan (s) outef-service in any cell. covers must be in place on the outaf-service fan (s) or the entire cell (i.e. 4 fans) must be !
declared outef-service. If four fans are out of service in the same cell the covers do not have to be installed. !
e F
i t
WATERFORD - UNIT 3 3/4 7-14 AMENDMENT No. 96r423, l f
k J
.g. ,
PLANT SYSTEMS BASES-3/4.7.4 ULTIMATE HEAT SINK The limitations on the ultimate heat sink level, temperature, and number of fans ensure that sufficient cooling capacity is available to either (1) provide normal cooldown of the facility, or (2) to mitigate the effects of accident conditions within
! acceptable limits.
The UHS consists of two dry cooling towers (DCTs), two wet cooling towers l (WCTs), and water stored in WCT basins. Each of two 100 percent capacity loops employs a dry and wet cooling tower.
l Each DCT consists of five separate cells.- Cooling air for each cell is provided by 3 l fans, for a total of 15 per DCT. The cooling coils on three cells of each DCT (i.e. 60%) ,
are protected from tomado missiles by grating located above the coils and capable of withstanding tomado missile impact. With a Tomado Watch in effect and the number
! of fans OPERABLE within the missile protected area of a DCT less than that required i by Table 3.7-3, ACTION c requires the restoration of inoperable fans within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or plant shutdown as specified. This ACTION is based on FSAR analysis (subsection 9.2.5.3.3) that assumes the worst case single failure as,1 emergency diesel generator coincident with a loss of offsite power. This failure occurs subsequent to a tomado strike and 80% cooling capacity of a DCT is assumed available.
Each WCT has a basin which is capable of storing sufficient water to bring the plant to safe shutdown under all desian basis accident conditions. Item a of LCO l 3/4.7.4 requires a minimum water levelin each WCT basin of 97% (-9.86 ft. MSL). The i
bases for this elevation is WCT water evaporation and drift loss calculations, which concluded that during a LOCA 164.389 gallons (218.155 aallons with the non-essential load of spent fuel coolina) would be consumed from one WCT basin. When the WCT basin water level is maintained at -9.86 ft. MSL, each basin has a minimum capacity of -
174,000 gallons. Each WCT consists of two cells, each cell is serviced by 4 induced draft fans, for a total of 8 per WCT. There is a concrete partition between the cells that prevents air re-circulation between the fans of each cell. Covers are required on fans declared out-of-service to prevent air re-circulation between fans within a cell.
Table 3.7-3 specifies increased or decreased fan OPERABILITY requirements based on outside air temperature and humidity. The table provides the cooling tower fan OPERABILITY requirements that may vary with outside ambient conditions. Fan OPERABILITY requirements are specified for each controlling parameter (i.e., dry bulb temperatures for DCT fans and wet bulb temperatures for WCT fans). The calculated temperature values (EC-M95-009) associated with DCT and WCT fan requirements have been rounded in the conservative direction and lowered at least one full degree to l account for minor inaccuracies. Failure to meet the OPERABILITY requirements of Table 3.7-3 requires entry into the applicable action. Because temperature and humidity are subject to change during the day, ACTION d requires periodic temperature readings to verify compliance with Table 3.7-3 when any cooling tower fan is inoperable.
The limitations on minimum water levol and maximum temperature are based on providing a 30-day cooling water supply to safety-related equipment without exceeding their design basis temperature and is consistent with the recommendations of
- Regulatory Guide 1.27, " Ultimate Heat Sink for Nuclear Plants," March 1974.
l WATERFORD - UNIT 3 3/4 7-15 AMENDMENT No. 96rt23, l
- m. =- m.#.A-*e m_.--4 a.c __;mw__
a .a a I-a_ e- a mLs- m - -. -___ 4 h 2..A.hama. -,__.aa __-. a._.-4-. s -_. 2 e'
r, 8 ~
3 .
0
i i
l l
l i
i i
NPF-38-197 ;
FIGURE 1 l
l l
I i
l I
l i
I i
4 4 ..
l i
r
s a J._J s,w444 a.4 *a> _ed um a es~ rawA _a 4.um+--e e e_4.e a A _ +as. m. A m. , . _ _ . -
4 4
I e 0 e
l 8 i l li
- ! q. t
~
0 5d hgh IIIIIIIII1 g 44 44 %
li M ! j]
%#%v sg s "
gega s g i -
8!; :[n i.
il 3,,,,,,,,,,o g ;v 3
, oi a g m a q -
l 8 -
E s
O 2!! O e "
l O 8
^
s l
8 -
_c tr l
81 fjj " -
1
~i 3- iiiiiiiiii s -
8:8 3
M
/%'% '
- 8il d s
% % I gl , -
! 0 9
%'% 9 i --e a
.n.........., 8 8
--e l
I l
[ J