MONTHYEARML20217M4461999-10-20020 October 1999 Forwards Rev 8 to Sequoyah Nuclear Plant Physical Security/ Contingency Plan, IAW 10CFR50.54(p).Encl Withheld,Per 10CFR73.21 ML20217J4151999-10-15015 October 1999 Forwards Request for Addl Info Re Util 990624 Application for Amend of TSs That Would Revise TS for Weighing of Ice Condenser Ice Baskets 05000327/LER-1999-002, Forwards LER 99-002-00 Re Start of Units 1 & 2 EDGs as Result of Cable Being Damaged During Installation of Thermo- Lag for Kaowool Upgrade Project1999-10-15015 October 1999 Forwards LER 99-002-00 Re Start of Units 1 & 2 EDGs as Result of Cable Being Damaged During Installation of Thermo- Lag for Kaowool Upgrade Project ML20217G1141999-10-0707 October 1999 Responds to from P Salas,Providing Response to NRC Risk Determination Associated with 990630 Flooding Event at Sequoyah Facility.Meeting to Discuss Risk Determination Issues Scheduled for 991021 in Atlanta,Ga ML20217B2981999-10-0606 October 1999 Discusses Closeout of GL 92-01,rev 1,suppl 1, Reactor Vessel Integrity, for Sequoyah Nuclear Plant,Units 1 & 2. NRC Also Hereby Solicits Any Written Comments That TVA May Have on Current Rvid Data by 991101 ML20217B8431999-10-0505 October 1999 Requests NRC Review & Approval of ASME Code Relief Requests That Were Identified in Plant Second 10-yr ISI Interval for Both Units.Encl 3 Provides Util Procedure for Calculation of ASME Code Coverage for Section XI Nondestructive Exams IR 05000327/19990041999-10-0101 October 1999 Ack Receipt of Providing Comments on Insp Repts 50-327/99-04 & 50-328/99-04.NRC Considered Comments for Apparent Violation Involving 10CFR50.59 Issue ML20217C7101999-10-0101 October 1999 Forwards Response to NRC 990910 RAI Re Sequoyah Nuclear Plant,Units 1 & 2 URI 50-327/98-04-02 & 50-328/98-04-02 Re Ice Weight Representative Sample ML20212J5981999-10-0101 October 1999 Forwards SE Accepting Request for Relief from ASME Boiler & Pressure Vessel Code,Section Xi,Requirements for Certain Inservice Insp at Plnat,Unit 1 ML20212M1081999-09-29029 September 1999 Confirms Intent to Meet with Utils on 991025 in Atlanta,Ga to Discuss Pilot Plants,Shearon Harris & Sequoyah Any Observations & Lessons Learned & Recommendations Re Implementation of Pilot Program ML20217A9451999-09-27027 September 1999 Forwards Insp Repts 50-327/99-05 & 50-328/99-05 on 990718- 0828.One Violation Identified & Being Treated as Non-Cited Violation ML20216J9351999-09-27027 September 1999 Responds to NRC Re Violations Noted in Insp Repts 50-327/99-04 & 50-328/99-04.Corrective Actions:Risk Determination Evaluation Was Performed & Licensee Concluded That Event Is in Green Regulatory Response Band ML20212F0751999-09-23023 September 1999 Forwards SER Granting Util 981021 Request for Relief from ASME Code,Section XI Requirements from Certain Inservice Insp at Sequoyah Nuclear Power Plant,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(ii) ML20212F4501999-09-23023 September 1999 Forwards Amends 246 & 237 to Licenses DPR-77 & DPR-79, Respectively & Ser.Amends Approve Request to Revise TSs to Allow Use of Fully Qualified & Tested Spare Inverter in Place of Any of Eight Required Inverters ML20212M1911999-09-21021 September 1999 Discusses Exercise of Enforcement Discretion Re Apparent Violation Noted in Insp Repts 50-327/99-04 & 50-328/99-04 Associated with Implementation of Procedural Changes Which Resulted in Three Containment Penetrations Being Left Open ML20211Q0311999-09-10010 September 1999 Requests Written Documentation from TVA to Provide Technical Assistance to Region II Re TS Compliance & Ice Condenser Maint Practices at Plant ML20216F5441999-09-0707 September 1999 Provides Results of Risk Evaluation of 990630,flooding Event at Sequoyah 1 & 2 Reactor Facilities.Event Was Documented in Insp Rept 50-327/99-04 & 50-328/99-04 & Transmitted in Ltr, ML20211N5681999-09-0101 September 1999 Submits Clarification of Two Issues Raised in Insp Repts 50-327/99-04 & 50-328/99-04,dtd 990813,which Was First Insp Rept Issued for Plant Under NRC Power Reactor Oversight Process Pilot Plant Study ML20211G5881999-08-27027 August 1999 Submits Summary of 990820 Management Meeting Re Plant Performance.List of Attendees & Matl Used in Presentation Enclosed ML20211F8891999-08-25025 August 1999 Forwards Sequoyah Nuclear Plant Unit 1 Cycle 9 Refueling Outage, Re Completed SG Activities,Per TSs 4.4.5.5.b & 4.4.5.5.c ML20211A1851999-08-16016 August 1999 Forwards Proprietary TR WCAP-15128 & non-proprietary Rept WCAP-15129 for NRC Review.Repts Are Provided in Advance of TS Change That Is Being Prepared to Support Cycle 10 Rfo. Proprietary TR Withheld,Per 10CFR2.790 ML20210V1471999-08-13013 August 1999 Forwards Insp Repts 50-327/99-04 & 50-328/99-04 on 990601- 0717.One Potentially Safety Significant Issue Identified.On 990630,inadequate Performance of Storm Drain Sys Caused Water from Heavy Rainfall to Backup & Flood Turbine Bldg ML20211A1921999-08-12012 August 1999 Requests Proprietary TR WCAP-15128, Depth-Based SG Tube Repair Criteria for Axial PWSCC at Dented TSP Intersections, Be Withheld from Public Disclosure Per 10CFR2.790 ML20210Q5011999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006 at Sequoyah Nuclear Plant. Sample Registration Ltr Encl ML20210L4291999-08-0202 August 1999 Forwards Sequoyah Nuclear Plant Unit 2 Cycle 9 12-Month SG Insp Rept & SG-99-07-009, Sequoyah Unit-2 Cycle 10 Voltage-Based Repair Criteria 90-Day Rept. Repts Submitted IAW TS 4.4.5.5.b & TS 4.4.5.5.c ML20210L1611999-07-30030 July 1999 Forwards Request for Relief RV-4 Re ASME Class 1,2 & 3 Prvs, Per First ten-year Inservice Test Time Interval.Review & Approval of RV-4 Is Requested to Support Unit 1 Cycle 10 Refueling Outage,Scheduled to Start 000213 ML20210G5301999-07-28028 July 1999 Forwards Sequoyah Nuclear Plant Unit 2 ISI Summary Rept That Contains Historical Record of Repairs,Replacement & ISI & Augmented Examinations That Were Performed on ASME Code Class 1 & 2 Components from 971104-990511 ML20211B9661999-07-26026 July 1999 Informs That Sequoyah Nuclear Plant Sewage Treatment Plant, NPDES 0026450 Outfall 112,is in Standby Status.Flow Has Been Diverted from Sys Since Jan 1998 ML20210B2521999-07-14014 July 1999 Confirms 990712 Telcon Between J Smith of Licensee Staff & M Shannon of NRC Re semi-annual Mgt Meeting Schedule for 990820 in Atlanta,Ga to Discuss Recent Sequoyah Nuclear Plant Performance ML20210J1091999-07-10010 July 1999 Submits Suggestions & Concerns Re Y2K & Nuclear Power Plants ML20196K0381999-06-30030 June 1999 Provides Written Confirmation of Completed Commitment for Final Implementation of Thermo-Lag 330-1 Fire Barrier Corrective Actions at Snp,Per GL 92-08 ML20209E4071999-06-30030 June 1999 Forwards Insp Repts 50-327/99-03 & 50-328/99-03 on 990328- 0531.Violations Being Treated as Noncited Violations ML20196J8261999-06-28028 June 1999 Forwards Safety Evaluation Authorizing Request for Relief from ASME Boiler & Pressure Vessel Code,Section XI Requirements for Certain Inservice Inspections at Sequoyah Nuclear Plant,Units 1 & 2 ML20196G7881999-06-22022 June 1999 Informs NRC of Changes That Util Incorporated Into TS Bases Sections & Trm.Encl Provides Revised TS Bases Pages & TRM Affected by Listed Revs ML20196G1801999-06-21021 June 1999 Requests Termination of SRO License SOP-20751-1,for Lf Hardin,Effective 990611.Subject Individual Resigned from Position at TVA ML20195G1821999-06-0808 June 1999 Requests NRC Review & Approval of ASME Code Relief for ISI Program.Encl 1 Provides Relief Request 1-ISI-14 That Includes Two Attachments.Encl 2 Provides Copy of Related ASME Code Page ML20195E9521999-06-0707 June 1999 Requests Relief from Specific Requirements of ASME Section Xi,Subsection IWE of 1992 Edition,1992 Addenda.Util Has Determined That Proposed Alternatives Would Provide Acceptable Level of Quality & Safety ML20195E9311999-05-28028 May 1999 Informs of Planned Insp Activities for Licensee to Have Opportunity to Prepare for Insps & Provide NRC with Feedback on Any Planned Insps Which May Conflict with Plant Activities ML20195B3631999-05-21021 May 1999 Requests Termination of SRO License for Tj Van Huis,Per 10CFR50.74(a).TJ Van Huis Retired from Util,Effective 990514 ML20207A5721999-05-20020 May 1999 Forwards Correction to Previously Issued Amend 163 to License DPR-79 Re SR 4.1.1.1.1.d Inadvertently Omitted from Pp 3/4 1-1 of Unit 2 TS ML20206Q8791999-05-13013 May 1999 Forwards L36 9990415 802, COLR for Sequoyah Nuclear Plant Unit 2,Cycle 10, IAW Plant TS 6.9.1.14.c 05000327/LER-1999-001, Forwards LER 99-001-00 Re Condition That Resulted in Granting of Enforcement Discretion,Per Failure of Centrifugal Charging Pump.Condition Being Reported IAW 10CFR50.73(a)(2)(i)(B) & (a)(2)(iv)1999-05-11011 May 1999 Forwards LER 99-001-00 Re Condition That Resulted in Granting of Enforcement Discretion,Per Failure of Centrifugal Charging Pump.Condition Being Reported IAW 10CFR50.73(a)(2)(i)(B) & (a)(2)(iv) ML20206M9341999-05-10010 May 1999 Forwards Rept of SG Tube Plugging During Unit 2 Cycle 9 Refueling Outage,As Required by TS 4.4.5.5.a.ISI of Unit 2 SG Tubes Was Completed on 990503 ML20206K6271999-05-0606 May 1999 Requests Termination of SRO License for MR Taggart,License SOP-21336 Due to Resignation on 990430 ML20206J2061999-05-0404 May 1999 Requests Relief from Specified ISI Requirements in Section XI of ASME B&PV Code.Tva Requests Approval to Use Wire Type Penetrameters in Lieu of Plaque Type Penetrameters for Performing Radiographic Insps.Specific Relief Request,Encl ML20209J0391999-04-27027 April 1999 Forwards Annual Radioactive Effluent Release Rept, Radiological Impact Assessment Rept & Rev 41 to ODCM, for Period of Jan-Dec 1998 ML20206C6541999-04-23023 April 1999 Forwards Response to NRC 990127 RAI Re GL 96-05 for Sequoyah Nuclear Plant,Units 1 & 2 ML20206C0841999-04-23023 April 1999 Forwards Insp Repts 50-327/99-02 & 50-328/99-02 on 990214-0327.No Violations Noted ML20206B9591999-04-20020 April 1999 Responds to 990417 Request That NRC Exercise Discretion Not to Enforce Compliance with Actions Required in Unit 1 TS 3.1.2.2,3.1.2.4 & 3.5.2 & Documents 990417 Telephone Conversation When NRC Orally Issued NOED ML20205S5891999-04-17017 April 1999 Documents Request for Discretionary Enforcement for Unit 1 TS LCOs 3.1.2.2,3.1.2.4 & 3.5.2 to Support Completion of Repairs & Testing for 1B-B Centrifugal Charging Pump (CCP) 1999-09-07
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217M4461999-10-20020 October 1999 Forwards Rev 8 to Sequoyah Nuclear Plant Physical Security/ Contingency Plan, IAW 10CFR50.54(p).Encl Withheld,Per 10CFR73.21 05000327/LER-1999-002, Forwards LER 99-002-00 Re Start of Units 1 & 2 EDGs as Result of Cable Being Damaged During Installation of Thermo- Lag for Kaowool Upgrade Project1999-10-15015 October 1999 Forwards LER 99-002-00 Re Start of Units 1 & 2 EDGs as Result of Cable Being Damaged During Installation of Thermo- Lag for Kaowool Upgrade Project ML20217B8431999-10-0505 October 1999 Requests NRC Review & Approval of ASME Code Relief Requests That Were Identified in Plant Second 10-yr ISI Interval for Both Units.Encl 3 Provides Util Procedure for Calculation of ASME Code Coverage for Section XI Nondestructive Exams ML20217C7101999-10-0101 October 1999 Forwards Response to NRC 990910 RAI Re Sequoyah Nuclear Plant,Units 1 & 2 URI 50-327/98-04-02 & 50-328/98-04-02 Re Ice Weight Representative Sample ML20216J9351999-09-27027 September 1999 Responds to NRC Re Violations Noted in Insp Repts 50-327/99-04 & 50-328/99-04.Corrective Actions:Risk Determination Evaluation Was Performed & Licensee Concluded That Event Is in Green Regulatory Response Band ML20211N5681999-09-0101 September 1999 Submits Clarification of Two Issues Raised in Insp Repts 50-327/99-04 & 50-328/99-04,dtd 990813,which Was First Insp Rept Issued for Plant Under NRC Power Reactor Oversight Process Pilot Plant Study ML20211F8891999-08-25025 August 1999 Forwards Sequoyah Nuclear Plant Unit 1 Cycle 9 Refueling Outage, Re Completed SG Activities,Per TSs 4.4.5.5.b & 4.4.5.5.c ML20211A1851999-08-16016 August 1999 Forwards Proprietary TR WCAP-15128 & non-proprietary Rept WCAP-15129 for NRC Review.Repts Are Provided in Advance of TS Change That Is Being Prepared to Support Cycle 10 Rfo. Proprietary TR Withheld,Per 10CFR2.790 ML20211A1921999-08-12012 August 1999 Requests Proprietary TR WCAP-15128, Depth-Based SG Tube Repair Criteria for Axial PWSCC at Dented TSP Intersections, Be Withheld from Public Disclosure Per 10CFR2.790 ML20210L4291999-08-0202 August 1999 Forwards Sequoyah Nuclear Plant Unit 2 Cycle 9 12-Month SG Insp Rept & SG-99-07-009, Sequoyah Unit-2 Cycle 10 Voltage-Based Repair Criteria 90-Day Rept. Repts Submitted IAW TS 4.4.5.5.b & TS 4.4.5.5.c ML20210L1611999-07-30030 July 1999 Forwards Request for Relief RV-4 Re ASME Class 1,2 & 3 Prvs, Per First ten-year Inservice Test Time Interval.Review & Approval of RV-4 Is Requested to Support Unit 1 Cycle 10 Refueling Outage,Scheduled to Start 000213 ML20210G5301999-07-28028 July 1999 Forwards Sequoyah Nuclear Plant Unit 2 ISI Summary Rept That Contains Historical Record of Repairs,Replacement & ISI & Augmented Examinations That Were Performed on ASME Code Class 1 & 2 Components from 971104-990511 ML20210J1091999-07-10010 July 1999 Submits Suggestions & Concerns Re Y2K & Nuclear Power Plants ML20196K0381999-06-30030 June 1999 Provides Written Confirmation of Completed Commitment for Final Implementation of Thermo-Lag 330-1 Fire Barrier Corrective Actions at Snp,Per GL 92-08 ML20196G7881999-06-22022 June 1999 Informs NRC of Changes That Util Incorporated Into TS Bases Sections & Trm.Encl Provides Revised TS Bases Pages & TRM Affected by Listed Revs ML20196G1801999-06-21021 June 1999 Requests Termination of SRO License SOP-20751-1,for Lf Hardin,Effective 990611.Subject Individual Resigned from Position at TVA ML20195G1821999-06-0808 June 1999 Requests NRC Review & Approval of ASME Code Relief for ISI Program.Encl 1 Provides Relief Request 1-ISI-14 That Includes Two Attachments.Encl 2 Provides Copy of Related ASME Code Page ML20195E9521999-06-0707 June 1999 Requests Relief from Specific Requirements of ASME Section Xi,Subsection IWE of 1992 Edition,1992 Addenda.Util Has Determined That Proposed Alternatives Would Provide Acceptable Level of Quality & Safety ML20195B3631999-05-21021 May 1999 Requests Termination of SRO License for Tj Van Huis,Per 10CFR50.74(a).TJ Van Huis Retired from Util,Effective 990514 ML20206Q8791999-05-13013 May 1999 Forwards L36 9990415 802, COLR for Sequoyah Nuclear Plant Unit 2,Cycle 10, IAW Plant TS 6.9.1.14.c 05000327/LER-1999-001, Forwards LER 99-001-00 Re Condition That Resulted in Granting of Enforcement Discretion,Per Failure of Centrifugal Charging Pump.Condition Being Reported IAW 10CFR50.73(a)(2)(i)(B) & (a)(2)(iv)1999-05-11011 May 1999 Forwards LER 99-001-00 Re Condition That Resulted in Granting of Enforcement Discretion,Per Failure of Centrifugal Charging Pump.Condition Being Reported IAW 10CFR50.73(a)(2)(i)(B) & (a)(2)(iv) ML20206M9341999-05-10010 May 1999 Forwards Rept of SG Tube Plugging During Unit 2 Cycle 9 Refueling Outage,As Required by TS 4.4.5.5.a.ISI of Unit 2 SG Tubes Was Completed on 990503 ML20206K6271999-05-0606 May 1999 Requests Termination of SRO License for MR Taggart,License SOP-21336 Due to Resignation on 990430 ML20206J2061999-05-0404 May 1999 Requests Relief from Specified ISI Requirements in Section XI of ASME B&PV Code.Tva Requests Approval to Use Wire Type Penetrameters in Lieu of Plaque Type Penetrameters for Performing Radiographic Insps.Specific Relief Request,Encl ML20209J0391999-04-27027 April 1999 Forwards Annual Radioactive Effluent Release Rept, Radiological Impact Assessment Rept & Rev 41 to ODCM, for Period of Jan-Dec 1998 ML20206C6541999-04-23023 April 1999 Forwards Response to NRC 990127 RAI Re GL 96-05 for Sequoyah Nuclear Plant,Units 1 & 2 ML20205S5891999-04-17017 April 1999 Documents Request for Discretionary Enforcement for Unit 1 TS LCOs 3.1.2.2,3.1.2.4 & 3.5.2 to Support Completion of Repairs & Testing for 1B-B Centrifugal Charging Pump (CCP) ML20205B1091999-03-19019 March 1999 Submits Response to NRC Questions Concerning Lead Test Assembly Matl History,Per Request ML20204H0161999-03-19019 March 1999 Resubmits Util 990302 Response to Violations Noted in Insp Repts 50-327/98-11 & 50-328/98-11.Corrective Actions:Lessons Learned from Event Have Been Provided to Operating Crews ML20204E8251999-03-0505 March 1999 Forwards Sequoyah Nuclear Plant,Four Yr Simulator Test Rept for Period Ending 990321, in Accordance with Requirements of 10CFR55.45 ML20207E6851999-03-0202 March 1999 Responds to NRC Re Violations Noted in Insp Repts 50-327/98-11 & 50-328/98-11.Corrective Actions:Lessons Learned from Event Have Been Provided to Operating Crews ML20207J1171999-01-29029 January 1999 Forwards Copy of Final Exercise Rept for Full Participation Ingestion Pathway Exercise of Offsite Radiological Emergency Response Plans site-specific to Sequoyah NPP ML20202A7141999-01-20020 January 1999 Provides Request for Relief for Delaying Repair on Section of ASME Code Class 3 Piping within Essential Raw Cooling Water Sys ML20198S7141998-12-29029 December 1998 Forwards Cycle 10 Voltage-Based Repair Criteria 90-Day Rept, Per GL 95-05.Rept Is Submitted IAW License Condition 2.C.(9)(d) 05000327/LER-1998-004, Forwards LER 98-004-00,providing Details Concerning Inability to Complete Surveillance within Required Time Interval1998-12-21021 December 1998 Forwards LER 98-004-00,providing Details Concerning Inability to Complete Surveillance within Required Time Interval ML20198D5471998-12-14014 December 1998 Requests That License OP-20313-2 for Je Wright,Be Terminated IAW 10CFR50.74(a).Individual Retiring ML20197J5541998-12-10010 December 1998 Forwards Unit 1 Cycle 9 90-Day ISI Summary Rept IAW IWA-6220 & IWA-6230 of ASME Code,Section Xi.Request for Relief Will Be Submitted to NRC Timeframe to Support Second 10-year Insp Interval,Per 10CFR50.55a 05000327/LER-1998-003, Forwards LER 98-003-00 Re Automatic Reactor Trip with FW Isolation & Auxiliary FW Start as Result of Failure of Vital Inverter & Second Inverter Failure.Event Is Being Reported IAW 10CFR50.73(a)(2)(iv)1998-12-0909 December 1998 Forwards LER 98-003-00 Re Automatic Reactor Trip with FW Isolation & Auxiliary FW Start as Result of Failure of Vital Inverter & Second Inverter Failure.Event Is Being Reported IAW 10CFR50.73(a)(2)(iv) ML20196F9841998-11-25025 November 1998 Provides Changes to Calculated Peak Fuel Cladding Temp, Resulting from Recent Changes to Plant ECCS Evaluation Model ML20195H7891998-11-17017 November 1998 Requests NRC Review & Approval of Five ASME Code Relief Requests Identified in Snp Second ten-year ISI Interval for Units 1 & 2 ML20195E4991998-11-12012 November 1998 Forwards Rev 7 to Physical Security/Contingency Plan.Rev Adds Requirement That Security Personnel Will Assess Search Equipment Alarms & Add Definition of Major Maint.Rev Withheld (Ref 10CFR2.790(d)(1)) 05000328/LER-1998-002, Forwards LER 98-002-00 Re Automatic Turbine & Reactor Trip, Resulting from Failure of Sudden Pressure Relay on 'B' Phase Main Transformer1998-11-10010 November 1998 Forwards LER 98-002-00 Re Automatic Turbine & Reactor Trip, Resulting from Failure of Sudden Pressure Relay on 'B' Phase Main Transformer ML20195G5701998-11-10010 November 1998 Documents Util Basis for 981110 Telcon Request for Discretionary Enforcement for Plant TS 3.8.2.1,Action B,For 120-VAC Vital Instrument Power Board 1-IV.Licensee Determined That Inverter Failed Due to Component Failure ML20155J4031998-11-0505 November 1998 Provides Clarification of Topical Rept Associated with Insertion of Limited Number of Lead Test Assemblies Beginning with Unit 2 Operating Cycle 10 Core ML20154R9581998-10-21021 October 1998 Requests Approval of Encl Request for Relief ISI-3 from ASME Code Requirements Re Integrally Welded Attachments of Supports & Restraints for AFW Piping ML20155B1481998-10-21021 October 1998 Informs That as Result of Discussion of Issues Re Recent Events in Ice Condenser Industry,Ice Condenser Mini-Group (Icmg),Decided to Focus Efforts on Review & Potential Rev of Ice condenser-related TS in Order to Clarify Issues ML20154K1581998-10-13013 October 1998 Forwards Rept Re SG Tube Plugging Which Occurred During Unit 1 Cycle 9 Refueling Outage,Per TS 4.4.5.5.a.ISI of Unit 1 SG Was Completed on 980930 ML20154H6191998-10-0808 October 1998 Forwards Rev 0 to Sequoyah Nuclear Plant Unit 1 Cycle 10 COLR, IAW TS 6.9.1.14.c 05000328/LER-1998-001, Forwards LER 98-001-00 Providing Details Re Automatic Turbine & Reactor Trip Due to Failure of Sudden Pressure Relay on 'B' Phase Main Transformer1998-09-28028 September 1998 Forwards LER 98-001-00 Providing Details Re Automatic Turbine & Reactor Trip Due to Failure of Sudden Pressure Relay on 'B' Phase Main Transformer ML20151W4901998-09-0303 September 1998 Responds to NRC Re Violations Noted in Insp Repts 50-327/98-07 & 50-328/98-07.Corrective Actions:Revised Per SQ971279PER to Address Hardware Issues of Hysteresis, Pressure Shift & Abnormal Popping Noise 1999-09-27
[Table view] |
Text
,
En -
Tennessee Vaney Authonty Post Offce Box 7J00. Soody-Daisy Tennessee 37379 September 6,1995 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:
In the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 SEQUOYAH NUCLEAR PLANT (SON)- 10 CFR 50.46 UPDATED ANNUAL REPORT
Reference:
TVA letter to NRC dated July 12,1995, "Sequoyah Nuclear Plant (SON) -
10 CFR 50.46 Annual Report" 10 CFR 50.46 requires that a 30-day report be furnished if a significant change in peak clad temperatureis discovered. The purpose of this letteris to provide this notification. Recently, Westinghouse Electric Corporation withdrew its request for NRC approval of the Power Shapes Sensitivity Model (PSSM). PSSM had been developed and submitted to NRC as a statistical methodology to evaluate and assure
- that the cosine distribution remains the limiting distribution. This methodology was implerriented on a forward-fit tiasis. In order to rninimize potential peak clad ,
temperature (PCT) penalties due to the withdrawal of PSSM, Westinghouse developed i an alternate axial power shape methodology, Explicit Shape Analysis for PCT Effects.
The Explicit Shape Analysis for PCT Effects methodologyis based on explicit analysis of a set of skewed axial power shapes. The explicit use of skewed power shapes has previously been approved by NRC as part of the Westinghouse large break '
loss-of-coolant accident (LOCA) evaluation model. Based upon this replacement, the SON large break LOCA analysis is impacted in the form of a penalty.
To offset the effect of the skewed power shapes discussed above, it was necessary to mod 61 an improvement to the large break LOCA evaluation model for plants with a severe penality. TVA decided to apply this improvement to its large break LOCA evaluation model. This improvement allows for the modeling of flow through the hot-leg nozzle gap as a benefit. This benefit is cuained by including steam flow through the reactor vessel hot-leg nozzle gap (between the core barrel and the reactor vessel) in the calculations.
11008V 9509120350 950906 PDR
__R. _
ADDCK 05000327
__ PDR h' I
, _ _. _ ~. - - _ _ ._ .. _ _._ __ _ . _ .
k t
U.S. Nuclear Regulatory Commission Page 2 ,
September 6,1995 ,
An additional benefit is derived by eliminating the penalty that has been assessed against the large break LOCA evaluation model for the Westinghouse standard fuel j assembly with Inconel grids. Since Cycle 5, most of the standard fuel assemblies j have been replaced with Vantage-5H assemblies with Z rcaloy grids. The few ,
standard fuel assemblies that have not been replaced will continue to be located in l low power regions. By ensuring the standard fuel assemblies remain in low power region, the relative average power factor for the Vantage-5H fuel assemblies is bounding. The reload safety analysis process will ensure that the remaining ctandard fuel assemblies will remain in the low power regions for future cycles.
The summation of the PCT impact from the above three items results in a 245 degrees Fahrenheit ( F) decrease in the large break LOCA PCT, which exceeds the threshold ,
discussed in 10 CFR 50.46 (a)(3)(ii). Additionally, the above-identified changes do not result in exceeding the limits of 10 CFR 50.46, and PCT margin allocations will ensure these limitations are not exceeded. Therefore, further reanalysis or actions are not planned at this time.
i The attached enclosure provides the benefits and penalty discussed above. The above reference provided SON's 1995 Annual 10 CFR 50.46 Report. The small break l LOCA PCT remains unchanged from that reported in the referenced document.
Additionally, potentialissues are under investigation by Westinghouse thet may l impact the PCT for large and small break LOCA. The potentialissues have had PCT !
margin temporarily allocated to ensure that the cumulative efforts are tracked such !
that the 10 CFR 50.46 PCT limit of 2200 Fis not exceeded. Upon their resolution, these issues will continue to be reported as appropriate.
Please direct questions concerning this issue to W. C. Ludwig at 843-7460.
Sincerely,
- h. Y-R. H. Shell :
Manager SON Site Licensing Enclosure cc: See page 3 e
. i U. S Nuclear Regulatory Commission Page 3 September 6,1995 cc (Enclosure):
Mr. D. E. LaBarge, Project Manager Nuclear Regulatory Commission i One White Flint, North - !
11555 Rockville Pike Rockville, Maryland 20852-2739 ;
NRC Resident inspector ,
Sequoyah Nuclear Plant i 2600 Igou Feny Road Soddy-Daisy, Tennessee 37379 3624 Regional Administrator U.S. Nuclear Regulatory Commission ;
Region 11 !
101 Marietta Street, NW, Suite 2900 i Atlanta, Georgia 30323-2711 [
+
1
,. I i
ENCLOSURE 10 CFR 50.46 REPORT DOCUMENTATION i
3
'Laras Break Loss-of-Coolant Accident (LOCA) e ECI Attachment t Previous Licensing Basis Peak 2156*F
. Cladding Temperature (PCT)
(July 12,1995) ;
Standard Fuel Assembly Relative Average -100 F 1 Power Limit Adjustment ;
l ESHAPE' Power Shape Sensitivity Model +25 F 2 !
l Hot Leg Nozzle Gap Flow Modeling -170 F 3 l
Updated Licensing Basis PCT 1911 F t
, Net Change -245 F i
- - Small Break LOCA i
ECI I
j Previous Licensing Basis PCT 1716*F (July 12,1995)
$ No Change Idontified 0F Updated Licensing Basis PCT 1716 F Net Change 0F I I
A detailed discussion of the change outlined above is included in the indicated attachment. !
- Explicit EHape analysis for ECT Effects
Attachment 1 STANDARD FUEL ASSEMBLY RELATIVE AVERAGE POWER ADJUSTMENT
Background
The current licensing basis large break loss-of-coolant accident for Sequoyah was performed using the 1981 Westinghouse ECCS Evaluation Model (BASH). The analysis was performed to support operation with a peaking factor (F) of 2.40, a hot channel factor (FJ of 1.62 and a ,
relative average power factor (PJ of 1.44. This analysis was initially performed for the Westinghouse Standard Fuel Assembly with Inconel grids. Begmnmg with Unit 1, Cycle 5 operation, TVA began using the Westinghouse Vantage-5H Fuel Assembly with Zircaloy grids.
The analysis performed to support use of the Vantage-5H fuel found that the original Standard fuel assembly results bounded the Vantage-5H results. As such, no change to the ECCS evaluation model or calculated peak clad temperature was required to support use of the Vantage-5H fuel assemblies.
Since Cycle 5, most of the Standard fuel assemblies at Sequoyah have been replaced with Vantage-5H assemblies. The Standard fuel assemblies which continue to be in operation in the present (and future) cores are located in low power regions (typically on the periphery of the core). As a result, the relative average power of these assemblies is much lower than the 1.44 value assumed in the licensing basis analysis. At the request of TVA, Westinghouse recently performed an evaluation to determine the maximum allowable average power factor for the Standard fuel assemblies which would result in a peak clad temperature less than that previously calculated for Vantage-5H fuel assemblies. The evaluation found that limiting the Standard fuel relative average power factor to 1.28 will ensure that the Vantage-5H results are bounding.
A review of the Standard fuel assemblies presently installed at Sequoyah (and future core designs for Cycle 8 operatinn) found that they meet the 1.28 relative average power factor limit. As such, TVA has decided to impose a permanent relative average power limit of 1.28 on all Sequoyah Standard fuel assemblies. This limit will be evaluated as part of the reload safety evaluation process for all future cores designed under the present large break loss-of-coolant accident en*]ysis. This limit will allow the Vantage-5H fuel assembly analysis to be adopted as the Sequoyah licensing basis analysis.
Estimated Effect The calculated peak clad temperature for the Standard fuel assemblies exceeds that calculated for the Vantage-5H fuel assemblies by 100 F for a relative average power factor of 1.44. Limiting the remaining Standard fuel assemblies to a relative average power factor of 1.28 will result in a 100 F reduction in calculated peak clad temperature.
l
- _. , -. - .~ . .. - . . . _ . - .. . - _
4 Attachment 2 i
! ESHAPE POWER SHAPE SENSITIVIIT MODEL
) Background !
5 3 Large break loss-of-coolant accident analyses generally assume a symmetric, chopped cosine, ;
j core axial power distribution. Under cenain conditions, there is a potential for top-skewed power ,
distributions to result in peak clad temperatures greater than those calculated with the chopped - '
I cosine power distribution. In 1991, Westinghouse developed a statistical methodology to evaluate
- and assure that the cosine distribution is the limiting power distribution. This methodology is referred to as the power shape sensitivity model (PSSM) and is documented in Topical Report ;
, WCAP-12909-P. This methodology has been used to suppon the Sequoyah core reload safety l cvaluations for the present fuel cycles (Cycle 7).
f Based upon recent NRC concerns regarding the statistical apr wh and uncertainties used in the- '
i PSSM methodology, Westinghouse has indicated that the PSSM methodology has been replaced i by an alternate evaluation methodology for the BASH emergency core cooling system evaluation !
model. This alternate methodology is referred to as ESHAPE (Explicit Shape Analysis for PCT l Effects) and has been approved by NRC as pan of the Westinghouse large break loss-of-coolant 1 j accident evaluation model (Topical Report WCAP-10266-P-A, Addendum 1, Revision 2-P-A). !
This methodology is based upon explicit analysis of a set of skewed power shapes.
i
( '
Estimated Effect :
l :
[, , Westinghouse has performed an evaluation of the Sequoyah large break loss-of-coolant accident
! N using the'aSHAPE methodology . The revised axial power distribution model increased the l calculated peak clad temperature by 25*F. .
1 e
I !
]
1 4
l l
1 i
i i
Attachment 3' HOT LEG NOZZLE GAP FLOW MODELING
Background
Westinghouse designed pressurized water reactors have a small gap at the interface between the reactor core barrel and the reactor vessel at the hot leg nozzle location. This gap is necessary for installing and removing the core barrel. This gap creates a flow path for core cooling during .
a large break loss of-coolant accident from the upper plenum to the cold leg via the downcomer region. No credit is taken for this flow path in the present Sequoyah large break loss-of-cooling accident analysis.
Westinghouse has recently developed a methodology for modeling these gaps in the BASH emergency core cooling system evaluation model. This methodology is documented in Topical Report WCAP-14404-P. This modification extends the basic flow link modeling of the existing evaluation model to the additional flowpath created by the hot leg gaps. This modeling enhancement has recently been applied to the Sequoyah large break loss-of-coolant accident analysis.
Estimated Effect Application of the hot leg nozzle gap flow modeling to the Sequoyah large break loss-of-coolant accident analysis reduces the calculated peak clad temperature by 170 F.
s
%