Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARLIC-99-0096, Monthly Operating Rept for Sept 1999 for Fcs,Unit 1.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Fcs,Unit 1.With LIC-99-0084, Monthly Operating Rept for Aug 1999 for Fort Calhoun Station.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Fort Calhoun Station.With ML20210R1961999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Fcs,Unit 1 LIC-99-0065, Monthly Operating Rept for June 1999 for Fort Calhoun Station,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Fort Calhoun Station,Unit 1.With ML20210R2081999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Fcs,Unit 1 LIC-99-0053, Monthly Operating Rept for May 1999 for Fort Calhoun Station,Unit 11999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Fort Calhoun Station,Unit 1 LIC-99-0047, Monthly Operating Rept for Apr 1999 for Fort Calhoun Station Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Fort Calhoun Station Unit 1.With LIC-99-0034, Monthly Operating Rept for Mar 1999 for Fcs,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Fcs,Unit 1.With LIC-99-0025, Monthly Operating Rept for Feb 1999 for Fort Calhoun Station,Unit 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Fort Calhoun Station,Unit 1.With LIC-99-0003, Monthly Operating Rept for Dec 1998 for Fort Calhoun Station.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Fort Calhoun Station.With LIC-98-0172, Monthly Operating Rept for Nov 1998 for Fort Calhoun Station,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Fort Calhoun Station,Unit 1.With LIC-98-0154, Monthly Operating Rept for Oct 1998 for Fort Calhoun Station,Unit 1.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Fort Calhoun Station,Unit 1.With LIC-98-0136, Monthly Operating Rept for Sept 1998 for Fort Calhoun Station,Unit 1.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Fort Calhoun Station,Unit 1.With LIC-98-0122, Monthly Operating Rept for Aug 1998 for Fort Calhoun Station Unit 1.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Fort Calhoun Station Unit 1.With LIC-98-0105, Monthly Operating Rept for July 1998 for Fort Calhoun Station1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Fort Calhoun Station LIC-98-0092, Monthly Operating Rept for June 1998 for Fort Calhoun Station,Unit 11998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Fort Calhoun Station,Unit 1 LIC-98-0078, Monthly Operating Rept for May 1998 for Fort Calhoun Station Unit 11998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Fort Calhoun Station Unit 1 LIC-98-0070, Monthly Operating Rept for Apr 1998 for Ft Calhoun Station1998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Ft Calhoun Station LIC-98-0058, Monthly Operating Rept for Mar 1998 for Fcs,Unit 11998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Fcs,Unit 1 LIC-98-0035, Monthly Operating Rept for Feb 1998 for Fcs,Unit 11998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Fcs,Unit 1 LIC-98-0016, Monthly Operating Rept for Jan 1998 for Fort Calhoun Station1998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Fort Calhoun Station LIC-98-0002, Monthly Operating Rept for Dec 1997 for Fcs,Unit 11997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Fcs,Unit 1 LIC-97-0191, Monthly Operating Rept for Nov 1997 for Fcs,Unit 11997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Fcs,Unit 1 LIC-97-0179, Monthly Operating Rept for Oct 1997 for Fcs,Unit 11997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Fcs,Unit 1 LIC-97-0163, Monthly Operating Rept for Sept 1997 for Fcs,Unit 11997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Fcs,Unit 1 LIC-97-0149, Monthly Operating Rept for Aug 1997 for Fort Calhoun Station Unit 11997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Fort Calhoun Station Unit 1 LIC-97-0137, Monthly Operating Rept for Jul 1997 for Fort Calhoun Station1997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Fort Calhoun Station LIC-97-0115, Monthly Operating Rept for June 1997 for Fort Calhoun Station,Unit 11997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Fort Calhoun Station,Unit 1 ML20148L9291997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Fort Calhoun Station Unit 1 LIC-97-0081, Monthly Operating Rept for April 1997 for FCS1997-04-30030 April 1997 Monthly Operating Rept for April 1997 for FCS LIC-97-0054, Monthly Operating Rept for Mar 1997 for Fort Calhoun Station Unit 11997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Fort Calhoun Station Unit 1 ML20136G5911997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Fort Calhoun Station ML20134M4281997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Fort Calhoun Station Unit 1 LIC-97-0002, Monthly Operating Rept for Dec 1996 for Fort Calhoun Station Unit 11996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Fort Calhoun Station Unit 1 ML20134M4341996-12-31031 December 1996 Revised Monthly Operating Rept for Dec 1996 for Fort Calhoun Station Unit 1 LIC-96-0196, Monthly Operating Rept for Nov 1996 for Fort Calhoun Station Unit 11996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Fort Calhoun Station Unit 1 LIC-96-0174, Monthly Operating Rept for Oct 1996 for FCS Unit 11996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for FCS Unit 1 LIC-96-0152, Monthly Operating Rept for Sept 1996 for Fort Calhoun Station Unit 11996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Fort Calhoun Station Unit 1 LIC-96-0134, Monthly Operating Rept for Aug 1996 for Fort Calhoun Station1996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Fort Calhoun Station LIC-96-0113, Monthly Operating Rept for Jul 1996 for Fort Calhoun Station Unit 11996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Fort Calhoun Station Unit 1 LIC-96-0096, Monthly Operating Rept for June 1996 for Fort Calhoun Station Unit 11996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Fort Calhoun Station Unit 1 LIC-96-0084, Monthly Operating Rept for May 1996 for Fort Calhoun Station Unit 11996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Fort Calhoun Station Unit 1 ML20117G0821996-04-30030 April 1996 Monthly Operating Rept for April 1996 for FCS ML20117G0841996-03-31031 March 1996 Revised MOR for March 1996 for FCS LIC-96-0036, Monthly Operating Rept for Feb 1996 for Calhoun Station,Unit 11996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Calhoun Station,Unit 1 LIC-96-0016, Monthly Operating Rept for Jan 1996 for Fort Calhoun Station Unit 11996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Fort Calhoun Station Unit 1 LIC-96-0004, Monthly Operating Rept for Dec 1995 for Fort Calhoun Station1995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Fort Calhoun Station LIC-95-0233, Monthly Operating Rept for Nov 1995 for FCS Unit 11995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for FCS Unit 1 ML20093G7571995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Fort Calhoun Station Unit 1 LIC-95-0172, Monthly Operating Rept for Aug 1995 for Fort Calhoun Station1995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Fort Calhoun Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217B5401999-10-0606 October 1999 Safety Evaluation Supporting Amend 193 to License DPR-40 ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data LIC-99-0096, Monthly Operating Rept for Sept 1999 for Fcs,Unit 1.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Fcs,Unit 1.With ML20211J9321999-09-0202 September 1999 Safety Evaluation Concluding That Licensee Proposed Alternatives Provide Acceptable Level of Quality & Safety. Proposed Alternatives Authorized for Remainder of Third ten- Yr ISI Interval for Fort Calhoun Station,Unit 1 LIC-99-0084, Monthly Operating Rept for Aug 1999 for Fort Calhoun Station.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Fort Calhoun Station.With ML20216E6431999-08-26026 August 1999 Rev 19 to TDB-VI, COLR for FCS Unit 1 ML20210R1961999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Fcs,Unit 1 ML20210G2181999-07-27027 July 1999 Safety Evaluation Supporting Amend 192 to License DPR-40 ML20210D9951999-07-22022 July 1999 Safety Evaluation Supporting Amend 191 to License DPR-40 ML20216E6361999-07-21021 July 1999 Rev 18 to TDB-VI, COLR for FCS Unit 1 ML20210R2081999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Fcs,Unit 1 LIC-99-0065, Monthly Operating Rept for June 1999 for Fort Calhoun Station,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Fort Calhoun Station,Unit 1.With ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML20210P5461999-06-0808 June 1999 Rev 0,Vols 1-5 of Fort Calhoun Station 1999 Emergency Preparedness Exercise Manual, to Be Conducted on 990810. Pages 2-20 & 2-40 in Vol 2 & Page 4-1 in Vol 4 of Incoming Submittal Not Included ML20195B4581999-05-31031 May 1999 Rev 3 to CE NPSD-683, Development of RCS Pressure & Temp Limits Rept for Removal of P-T Limits & LTOP Requirements from Ts ML20207H7401999-05-31031 May 1999 Performance Indicators Rept for May 1999 LIC-99-0053, Monthly Operating Rept for May 1999 for Fort Calhoun Station,Unit 11999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Fort Calhoun Station,Unit 1 ML20195B4521999-05-17017 May 1999 Technical Data Book TDB-IX, RCS Pressure - Temp Limits Rept (Ptlr) ML20206L4241999-05-10010 May 1999 Safety Evaluation Supporting Corrective Actions to Ensure That Valves Are Capable of Performing Intended Safety Functions & OPPD Adequately Addressed Requested Actions Discussed in GL 95-07 ML20206M2601999-05-0606 May 1999 SER Concluding That Licensee IPEEE Complete Re Info Requested by Suppl 4 to GL 88-20 & IPEEE Results Reasonable Given FCS Design,Operation & History LIC-99-0047, Monthly Operating Rept for Apr 1999 for Fort Calhoun Station Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Fort Calhoun Station Unit 1.With ML20195E8621999-04-30030 April 1999 Performance Indicators, for Apr 1999 ML20205Q5831999-04-15015 April 1999 Safety Evaluation Supporting Amend 190 to License DPR-40 ML20210J4331999-03-31031 March 1999 Changes,Tests, & Experiments Carried Out Without Prior Commission Approval for Period 981101-990331.With USAR Changes Other than Those Resulting from 10CFR50.59 ML20206G2641999-03-31031 March 1999 Performance Indicators Rept for Mar 1999 LIC-99-0034, Monthly Operating Rept for Mar 1999 for Fcs,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Fcs,Unit 1.With ML20205J8181999-02-28028 February 1999 Performance Indicators, for Feb 1999 LIC-99-0025, Monthly Operating Rept for Feb 1999 for Fort Calhoun Station,Unit 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Fort Calhoun Station,Unit 1.With ML20207F3291999-01-31031 January 1999 FCS Performance Indicators for Jan 1999 ML20203B0991998-12-31031 December 1998 Performance Indicators for Dec 1998 LIC-99-0026, 1998 Omaha Public Power District Annual Rept. with1998-12-31031 December 1998 1998 Omaha Public Power District Annual Rept. with LIC-99-0003, Monthly Operating Rept for Dec 1998 for Fort Calhoun Station.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Fort Calhoun Station.With ML20198S3771998-12-31031 December 1998 Safety Evaluation Supporting Amend 189 to License DPR-40 ML20198S4831998-12-31031 December 1998 Safety Evaluation Supporting Amend 188 to License DPR-40 ML20196G2251998-12-18018 December 1998 Rev 2 to EA-FC-90-082, Potential Over-Pressurization of Containment Penetration Piping Following Main Steam Line Break in Containment ML20198M3141998-11-30030 November 1998 Performance Indicators Rept for Nov 1998 LIC-98-0172, Monthly Operating Rept for Nov 1998 for Fort Calhoun Station,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Fort Calhoun Station,Unit 1.With LIC-98-0160, Special Rept:On 981113,MSL RM RM-064 Was Declared Inoperable Due to Leakage Past Isolation Valve HCV-922.Troubleshooting Has Indicated That Leakage Has Stopped & Cause of Leak Continues to Be Investigated1998-11-25025 November 1998 Special Rept:On 981113,MSL RM RM-064 Was Declared Inoperable Due to Leakage Past Isolation Valve HCV-922.Troubleshooting Has Indicated That Leakage Has Stopped & Cause of Leak Continues to Be Investigated ML20203B0721998-11-16016 November 1998 Rev 6 to HI-92828, Licensing Rept for Spent Fuel Storage Capacity Expansion ML20196E4981998-10-31031 October 1998 Performance Indicators Rept for Oct 1998 ML20196G2441998-10-31031 October 1998 Changes,Tests & Experiments Carried Out Without Prior Commission Approval. with USAR Changes Other than Those Resulting from 10CFR50.59 LIC-98-0154, Monthly Operating Rept for Oct 1998 for Fort Calhoun Station,Unit 1.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Fort Calhoun Station,Unit 1.With ML20154M4881998-10-19019 October 1998 Safety Evaluation Supporting Amend 186 to License DPR-40 ML20154N2411998-10-19019 October 1998 Safety Evaluation Supporting Amend 187 to License DPR-40 LIC-98-0136, Monthly Operating Rept for Sept 1998 for Fort Calhoun Station,Unit 1.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Fort Calhoun Station,Unit 1.With ML20155G4261998-09-30030 September 1998 Performance Indicators for Sept 1998 ML20154A1251998-08-31031 August 1998 Performance Indicators, Rept for Aug 1998 LIC-98-0122, Monthly Operating Rept for Aug 1998 for Fort Calhoun Station Unit 1.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Fort Calhoun Station Unit 1.With ML20238F7231998-08-17017 August 1998 Owner'S Rept for Isis ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency 1999-09-30
[Table view] |
Text
,
. g
> ..] L:l ;;[." N l' .t !.$... -N .!gNAN.Id%.
[ N 1,'I d k '. N .I.( h ('~}.9 } . }..._.m.h,,.~..._.__-...,[.[
, , ./ - 1 .; L l.
Omaha Public Power District 444 South 16th Stract Mall Omaha, Nebraska CJ3102-2247 402/63G2000 January 14, 1992 LIC-92-007R U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Mail Station P1-137 Washington, DC 20555
Reference:
Docket No. 50-285 Gent!cmen:
SUBJECT:
DecemberMonthlyOperatingReport(MOR)
Enclosed is the December 1991 MOR for Fort Calhoun Station (FCS) Unit No. 1 ss required by FCS Technical Specification Section 5.9.1.
If you should have any questions, please contact me.
Sincerely,
/
W.G. Gates [A Division Ma ager Nuclear Operations WGG/sel Enclosures c: LeBoeuf, Lamb, Leiby & MacRae R. D. Martin, NRC Regional Administrator, Region IV R. P. Mullikin, NRC Senior Resident Inspector D. K. Sent(.ll, Combustion Engineering R. J. Simon, W stinghouse Office of Management & Program Analysis (2)
- INPO Records Center l American Nuclear Insurers 4A
-i 45-5124 Empayment with Equal Onporturu, k T'2Ol 7.91161 # b112O I M'I'#I'*d!'
PDR ADOCN 05000m5 R FDR
LO.
, AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-285 UNIT Fort Calhoun Station DATE January 13, 1992 COMPLETED BY E. R. Cavanaugh TELEPHONE (402)636-2474 MONTH December 1991 DAY - ! AVERAGE DAILY POWER LEVEL ' DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 487 17 486 2 486 18 486 3' 486- __
19 486 4 486 20 486 5 486 21 486 6 487 22 486 7- 487 23 486 487 24 _, 486 9 487- ~25 486
~10 487 26 486 11- - 487- 27 486 12 487 28 486 11 3 486 29 486 14- 486 30 486 151 486 31 485-116 486
' INSTRUCTIONS On.this form, list the average daily unit power level in MWe-Net for each day-in'the reporting month. Compute-to the nearest whole megawatt.
L I
, . . . - - . . - - . - - . . -- ~
S' OPERATING DATA REPORT ,
DOCKET NO. 50-285 UNIT Fort Calhoun Station ~
DATE January 13, 1992 !
COMPLETED BY G.-R. Cavanaugh TELEPHONF (402)636-2474 8
=0PERATING STATUS 1.,' Unit Names Fort Calhoun Station Notes i
- 2. . Reporting Period: December 1991 J 1500-
- 3. -Licensed Thermal Power (MWt :
~
4.: NameplateRating(GrossMWe: -
502
- 5. DesignElectricalRating(NtT1We): 478 6.- Maximum Dependable Capacity-(Gross MWe): 502
- 7. MaximumDependableCapacity(NotMWe):. 478
,8. If_ changes _ occur in Capacity Ratings (Item Numbers 3 through 7) Since Last Report, Give Reasons:
NA ,
- 9. PowerLeveltoWhichRestricted,IfAny(NetMWe):-NA
- 10. Reasons for Restrictions,_If Any:_NAA '
l This Month Yr-to-Date Cumulative l
- 11. Hours in Reporting Period ~ 744.0 8,760.0 160,130.0
- 12. Number of Hours 1 Reactor was Critical -744.0 8,030'T _
124,818.7
- 13. ' Reactor Reserve' Shutdown Hours 0.0 0.0 1,309.5 114. Hours Generator.0n-Line- 744.0 7,947.2 123,377.1
- 15, Unit Reserve Shutdown Hours 0.0 0.0 0.0 16,; Gross Thermal Energy _ Generated (MWH) 1,111,552.0 10,340,236.4 161,623,725.7-17.-GrossElectr_icalEnergy: Generated (MWH) 378,520.0 3,426,000.0 53,176,126.2 18.- Net' Electrical Energy Cenerated-(MWH) 361,687.9 3,248,975.1- _ 50,733,751.4
- 19. Unit.' Service Factor 100.0 -90.7 77.0
- 20. -Unit i Availability Factor-100.0 90.7 77.0 121. Unit Capacity Factor (Using MDC-Net) 101.7 77.6- ~~
69.0
'22.. Unit Capacity Factor (Using DER Net) 10T.7 77.6 67.1 23.- Unit Forced Outage Rate 0.0 9.3 3.9 124.--Shutdowns.ScheduledOverNext6 Months (Type,Date,andDurationof;Each):
' Refueling Outage scheduled for February 1, 1992, and will last
-approximately three months.
25.. If Shut Down at End of- Report _ Period,_ Estimated Date of Startup: NA
- 26.. Units In Test: Status (Prior to Commercial Operation): Forcast- Achieved INITIAL CRITICALITY INITIAL ELECTRICITY N/A
~
COMMERCIAL OPERATION
, Refueling Information Fort Calhoun - Unit No. 1 Report for the month ending December 1991 4
- 1. Scheduled date for next refueling shutdown. February 1. 1992
- 2. Scheduled date for restart following refueling, aprJl_22u1992
- 3. Will refueling or resumption of operation thereafter require a technical specification change or other license- amendment? Yes
- a. If answer is yes, what, in general, will these be?
Incorporate specific-requirements resulting from reload safety analysis.
. If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload. N/A
- c. If no such resiew has taken place, when is it scheduled? N/A
- 4. Scheduled date(s) for submitting proposed licensing action and support information. Submitted November 27.
1991
- 5. Important licensing considerations a::sociated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures. New fuel supplier lipw LOCA Analysis
- 6. The number of fuel assemblies: a) in the core 133 3 A;semblies b) in the spent fuel pool 477 Assemblies c) spent fuel pool storage capacity 729 Assemblies d) planned spent fuel pool Planned to be increased storage capacity with higher density spent fuel racks.
- 7. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity. 1995
- o- Capability of full core offload of 133 assemblies lost. Reracking to be performed between the 1993 and 1995 Refueling Outages.
Prepared'by kM'11 b kce Date i,/,s /s 2
UNIT SHUTDOWNS AND P')WER REDUCTIONS DOCKET NO. 50-285- - -
UNIT NMtE Frrt Calhoun Station:
DATE January 9. 1992 COMPLETED BY G. R. Cavanauch -
TELEPHONE 402 - 636-2474 REPORT MONTH Decer.ber 1991 l
2 Licensee System Component Cause & Corrective No2 Date Type' Duration Reason Method of Shuting Event Code' Code' Action to (Hours) Prevent Recurrence Down Reactor 8 Report #
l 'Ibere were no unit shu.Jowns or power reductions in Decernber 1991.
l l
l I
3 8 I 2 Reason: Metini: Exhibit G - Insturctions F: Forced A-Equipnnnt Failure (Explain) 1-Manual for Preparation of Data S: Scheduled 2-Manual Scram. Entry Sheets for Licensee B-Maintenance or Test C-Refueling 3-Automatic Scram. Event Report (LER) File D-Regulatory Restriction 4-Other (Explain) (NUREG-0161)
E-Operator Training & License Examination '
F-Administrative G-Operational Error (Explain) Exhibit 1 - Same Source (9/77) H-Other (Explain)
i
- . OMAHA PUBLIC POWER DISTRICT Fort Calhoun Station Unit No. 1 December 1991 Monthly Operating Report I. OPERATIONS
SUMMARY
Fort Calhoun Station operated at a nominal 100% power throughout the month of December 1991.
On December 1, 1991, the Process Radiation Monitrrs for the Radioactive Waste Processing Building (RM-041,-042, & 043) were found to have zero sample flow due to a closed exhaust damper in the building ventilation system. This required entry-into Technical Specification LC0 2.9.1 (2) which requires - grab samples each 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for gaseous activity and continuous sampling for particulate and iodine activity on the Rad Waste Building exhaust stack. The damper apparently failed closed due to the loss -tf the control air in the building. The control air system self-contained air compressor had tripped off and not restarted following a momentary . loss of off-site (161kV) power. The air compressor was restarted and sample flow was re-established to the monitors shortly after discovery. This allowed clearing the LCO.
On-December 4, 1991, a four-hour notification was made to the NRC due to a failure to adequately test the equalizing valve on the containment inner Personnel Air Lock (PAL) door. The e tested per Technical Specification 3.5(qualizing volve had not been leak 3) s measure the inner door was declared inoperable and the outer PAL door was immediately danger tagged closed to prevent a breach of Containment integrity.- ~ Preparations for testing the equalizing valve included fabricating a test assembly and obtaining a waiver of compliance from the NRC to allow the outer PAL door to be opened. On December 6, 1991 the NRC granted Omaha Public Power District (OPPD) a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> waiver to allow testing of the inner PAL door equalizing valve. The valve was ,
~
successfully tested.on December 7, 1991.
On. December 10,1991, the last shipment of new Westinghouse fuel was received and inspected for the upcoming refueling outage. Currently all new fuel assemblies have been accepted by OPPD exccpt for one (R-001).
The assembly in question has a small surface defect on one fuel pin.
On December 16, 1991 a one-hour notification was made to the NRC based on discovery.thatportIonsofthetubingusedtotesttheContainmentPAL were not seismically qualified; thus, the PAL was outside the design bas?
of the plant. The non-qualified test equipment has been removed and new seismically rated tubing and isolation valves will be-installed January
-1992.
Unknown leakage from the RCS had been increasing over the last few months.
During the month of December, efforts to identify the leak path found that the source of leakage was the High Pressure Safety Injection (HPSI) -
Charging system crosstie valve HCV-2988. To prevent any further leakage-from this path, the Charging - HPSI manual isolation valve (CH-li,1) was closed. This resulted in a reduction in RCS unknown leakage to normal values.
1 MonthlyOperatingReport(Continued)
LIC-92-007R Page 2 On December 19, 1991, the 161kV Offsite power feed to the plant was taken out of service to repair a power pole arm which had been damaged by a winter storm earlier in the year. Repairs were completed by OPPD's Electric Operations Division and power was restored in approximately six hours.
The following hRC inspections took place during December 1991:
IER No. 91-24 Routine Resident Inspection IER No. 91-26 Special Inspection (Containment Integrity)
The following LERs were submitted during December 1991:
jJR NO. Descrintion 91-24 ESF Actuation after Pulling Fuses 91-25 S1 Pipe Supports Outside Design Basis 91-26 SR0 without NRC Physical 91-27 RCDT Sampling (WD-1060) 91-28 Unmonitored Release on Loss of 161kV A. SAFETY VALVES OR PORV CHALLENGES OR FAILURES WHICH OCCURRED NONE B. RESULTS OF LEAK RATE TESTS Total RCS leak rate increased from 0.475 gpm at the first of the month to 0.712 gpm on December 18, when the major source of leakage was identified. Charging flow was leaking through HCV-2988 to the 2500 psig HPSI header and then through the "B" Safety Injection Tank leakage cooler to the Reactor Coolant Drain Tank. HCV-2988 is the cross connect valve between the charging header and the high pressure HPSI header. The valve is a solenoid operated valve that is normally open to provide a flow path for hot leg injection and long term core cool ing. The valve is scheduled to be rsplaced during the 1992 refueling outage.
HCV-2988 was isolated by closing CH-191. This reduced the leakage to .137 gpm. With CH-191 closed, the total RCS leakage remained near this amount the rest of the month.
9 MonthlyOperatingReport(Continued)
LIC-92-007R Pagc 3 C. CHANGES, TESTS AND EXPERIMENTS REQUIRING NUCLEAR REGULA10RY COMMISSION AUTHORIZATION PURSUANT TO 10CFR50.59 Amendment No. Description NONE-D. SIGNIFICANT SAFETY RELATED MAINTENANCE FOR THE MONTH OF DECEMBER 1991
- Adjusted impeller lift and obtained new baseline data on three RawWaterPumps(AC-10A,B,C)
-Charging Replacedthegasbag)assemblyontheSuctionAccumulatorfor Pump (CH-18 .
Straightened the top cap and installed a new diaphragm on the fresh air supply damper (YCV-8710) for Diasel Generator No. 2.
- On 125V DC Battery Charger No.1, the silicon controlled rectifier (SCR) was found to be degraded and a replacement was I installed. Also replaced a faulty amplifier module and re-soldered a loose connection on the SCR firing module.
Installed the new Breaker for the Vacuum Deaerator Pump
. (DW-46A)
I Replaced ferro-resonance choke and filter components for Inverter"C"BypassTransformer(EE-4Q) .
t Replaced.a defective coil for the Containment High Radiation )
- SignalLockoutRelayChannelB(86B/CRHS)
Specific . tubes for Component Cooling Water Heat Exchanger AC-10 were cleaned to execute performance testing of various individual tubes, .
4 l
l.