ML20084J765

From kanterella
Jump to navigation Jump to search
Rev 0 to Procedure 40AC-02213, Licensed Operator Qualification Std
ML20084J765
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 04/30/1984
From:
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML20084J759 List:
References
40AC-02213, 40AC-2213, NUDOCS 8405100061
Download: ML20084J765 (9)


Text

_ _ - . _ _ - _ _ ______ _ __.

1 l

PALO VERDE NUCLEAR GENERATING [ROCEDURE STATION MANUAL coAc-ozzis REVISION LICENSED OPERATOR QUALIFICATION STANDARD 0 Page 1 of 9 4

. q$hY

~

9 9

  1. gy -

DEPT. HEAD Ott M DATE

[f PRB/PRG REVIEW , /ref.fg a f , DATE h 7.# / M APPROVED BY V DATE YJe/ -

EFFECTIVE DATE Y 7

20/,- Pl[

'DN-9360A/0812A o

-. me mo e m "dsjggt PDR

',* '.' l PALO VERDE NUCLEAR GENERATING Q CEwas STATION MANUAL 40AC-0ZZ13 REVISION LICENSED OPERATOR QUALIFICATION STANDARD 0 Page 2 of 9 TABLE OF CONTENTS SECTION PAGE NUMBER 1.0 PLPPOSE 3

2.0 REFERENCES

3 3.0 DEFINITIONS AND ABBREVIATIONS 3 4.0 RESPONSIBILITIES 3 5.0 INSTRUCTIONS 3 5.1 General - '

3 5.2 Documentation Method t 5

PENDICES Appendix A - Qualification Standard System Certification Record 6 l

I 1

1

  • I Pv25000 REY 8/82 ~

PALO VERDE NUCLEAR GENERATING o

[ROCEDURE STATION MANUAL 40AC-0ZZ13 REVISION LICENSED OPERATOR QUALIFICATION STANDARD 0 Page 3 of 9 1.0 PURPOSE The Licensed Operator Qualification Standard provides assurance that licensed personnel have an in-plant working knowledge of major systems in the unit.

2.0 REFERENCES

NONE 3.0 DEFINITIONS AND ABBREVIATIONS NONE 4.0 RESPONSIBILITIES' 4.1 Each department manager that h onnel in the license path is to ensure that the Qualif Standard is completed prior to taking the NRC RO/SRO Exam. Personnel presently licensed shall have their ' ification Standard completed two (2) months prior to F L ad. Personnel in the July 1984 li-cense group shall h J eir Qualification Standard completed prior to Fuel Load.

4.2 Personnel providing check outs are responsible to ensure that personnel have the necessary system knowledge to perfarm their jobs prior to signing off a system.

5.0 INSTRUCTIONS 5.1 General 5.1.1 Each individual in the license pathway will receive a Qualification Standard which provides for a check off of system knowledge for those systems listed in Appendix A.

5.1.2 Each system in the standard shall be signed off by either an SRO candidate previously checked out on the system or by an individual who has passed the NRC SRO exam.

PV2 5000 REV 082 a '

PALO VERDE NUCLEAR GENERATING o

[ROCEDURE STATION MANUAL 40AC-0zzi3 REVISION LICENSED OPERATOR QUALIFICATION STANDARD 0 Page 4 of 9 5.1.3 Personnel conducting the checkout shall utilize any one or combination of the following evaluation methods to determine an individuals qualifications.

The methods are:

METHOD 1 Performance of routine operations such as:

Swapping heat exchangers/ pumps Isolating / restoring of co.., nents in a system Monitoring /adjustingsf m parameters Understanding o dure content Component 1 ns METHOD 2 System wa and interviews k valuate design, operation, interfaces an procedural requirements.

METHOD 3 Formal training and evaluation on systems, com-ponents locations and procedure content. A copy of the training completion forms shall be attached to an individuals Appendix A.

METHOD 4 Startup operations, such as:

Flushing Isolation / restoration of components in a system-Pre-operational and prerequisite testing Understanding of procedure content Component locations METHOD 5 Having completed a checkoff for a required system under the previous qualification program. A copy of the previous qualification sign off sheet shall be attached to Appendix A.

m wooo nev sie

PALO VERDE NUCLEAR GENERATING @caoane STATION MANUAL 40AC-0ZZ13 REVISION LICENSED OPERATOR QUALIFICATION STANDARD 0 Page 5 of 9 5.2 Documentation Method 5.2.1 Documentation will be completed on Appendix A. The person providing the checkout will sign, date and indicate the method (s) utilized for each system checkout.

5.2.2 For systems completed using the formal training method a copy of the course completion record shall be attached to Appendix A.

5.2.3 For systems completed by the previ> qualification pro-gram, a copy of the sign off s s rom the previous qualification program shall b ched to Appendix A.

5.2.4 The completed Qualificat andard is be sent to Training Support for re on.

I l

Pv216-000 PEV 8/82

PALO VERDE NUCLEAR GENERATING [ROCEDURE o APPENDIX A 1 STATION MANUAL 40AC-0ZZ13 Page 1 of 4 l REVISION LICENSED OPERATOR QUALIFICATION STANDARD 0 Page 6 of 9 QUALIFICATION STANDARD SYSTEM CERTIFICATION RECORD METHODS

1. System Operation ,
2. System Walkdowns
3. Formal Training
4. Startup Operations
5. Previous Qualifications SYSTEM ATURE DATE METHOD Main Steam (SG) /

V Main Turbine (MT)

Condensate (CD)

{

Feedwater (FW)

Extraction Drains (ED)

)

Aux Feed (AF) __.

Condensate Transfer (CT)

Reactor Coolant (RC)

CVCS (CH)

Safety Injection (SI) l Blowdown (SC)

Steam Secis (/;S)

PV216@D REV8/82

PALO VERDE NUCLEAR GENERATING [ROCEDURE APPENDIX A STATION MANUAL 40AC-0ZZ13 Page 2 of 4

~

REVISION Page 7 of 9 LICENSED OPERATOR QUALIFICATION STANDARD 0 QUALIFICATION STANDARD SYSTEM CERTIFICATION RECORD SYSTEM SIGNATURE DATE MET 110D Lube Oil (LO)

!!2& CO2 (GH)

Seal Oil (50)

Stator Cooling (CE) m V

Air Removal (AR)

Control Oil (CO) A Circ Water (CW) f Plant Cooling (PN) _q Turbine Cooling (TC)

Nuclear Cooling (NC)

Fuel Pool Cooling (PC)

Essential Cooling (EW)

Essential Spray (SP)

Feed Pump Turbine (FT)

Chilled Uater (WC)

Fuel Bldg.IIVAC (liF)

e. .

l l PALO VERDE NUCLEAR GENERATING [7CEDURE APPENDIX A STATION MANUAL 40AC-0ZZ13 Page 3 of 4 REVISION LICENSED OPERATOR QUALIFICATION STANDARD 0 Page 8 of 9 QUALIFICATION STANDARD SYSTEM CERTIFICATION RECORD SYSTEM SIGNATURE DATE METHOD Aux Bldg. HVAC (HA)

Control Bldg. HVAC (HJ)

Diesel Bldg. HVAC (HD)

Ctmt Bldg. HVAC (HC) g Essential Chilled Water (EC) d

. V Ctmt H2 Control (HP)

Ctmt Purge (CP) A Gaseous Radwaste (GR) jh Instrument Air (IA) _

Diesel Generator (DG) (f Diesel Fuel Oil (DF)

Fire Protection (FP)

Main Generation (MA)

Voltage Regulation (MB) 4.16KV Class Power (PB)

Stby Generation (PE) 480V Class Swgr (PG) 480V Class MCC (PH)

PV2 400D REV.8/82

PALO VERDE NUCLEAR GENERATING $cEounE APPENDIX A STATION MANUAL 40AC-0zzl3 Page 4 of 4 REVISION LICENSED OPERATOR QUALIFICATION STANDARD 0 Page 9 of 9 QUALIFICATION STANDARD SYSTEM CERTIFICATION RECORD SYSTEM SIGNATURE DATE METHOD 125V DC Class (PK) ,

120V AC Class (PN) d 13.8KV Non-Class (NA) 4.16KV Non-Class (NB) _

480V Non-Class Swgr (NG) ,<

480 Non-Class MCC (NH) n 125V DC Non-Class (NK) 120V AC Non-Class (NN) 120V AC Uninterrup (NQ)

Essential Lighting (QB) l PV216@D REV.8/82