Informs of Reinsp Completion of Accessible safety-related Piping Restraints,Per AEC ,On 740118.All Restraints Are of Bergen-Paterson Design & in Satisfactory Condition
ML20084D473
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/29/1974
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Anthony Giambusso
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20084D330 List:
References
NUDOCS 8304120034
Download: ML20084D473 (1)


Text

,

9 9

}

P.O. DQX 3100 MIAMI, MOsl0A 33108 e-pr h

j

_J

--..J

/jM\\

/

f wA

~.

6 TLCRCA P0i.13 & L;GH T CD'/ si..r' h

1 January 29, 1974 1

t 5

!;0-

}

g

~, '\\

c, 7 t

/

Mr. Angelo Giambusso, Deputy Director b

i for Reactor Projects FEB4 $74h:

r-Directorate of Licensing 3

Office of Regulation

"' F i 2 [d

.....r 2

i U. S. Atontic Energy Co=tission E;; 6.h y?*,

h'ashington, D. C.

20545 y

a y,, [s; J' E h' i

Dear Mr. Giambusso:

i

]

'IURKEY POINT UNIT NO.3

j DOCKET hWIBER 50-250 REINSPECTION OF SAFETY PELATED flYDRAULIC PIPE RESTRAINTS j

ACCESSIBLE DURING PO'.ER OPERATION 1

i Reinspection of the accessible safety related piping restraints in accordance with the continuing requirements of the Directorate of j

Licensing, letter of November 8,1973, was completed on January 18, 1974.

1 There are 14 restraints which are in the above category and all are of j

the Bergen Paterson design. The inspection showed that all of the re-straints were in satisfactory condition with no signs of hydraulic fluid Icakage. As noted in our letter of January 11, 1974, all of these re-straints have been rebuilt utili::ing the recommended ethylene propylene seal material.

I i

Very truly yours, a

i A

Yt."

(

l Robert E. Uhrig Director of Nuc1 car Affairs 1

{

REU/IINP:pa::

cc:

Mr. Jack R. Newman j

1 4

(\\

f f,o

[

k' B304120034 741024 COPY SENT REGION __ k,6 q,{

PDR ADOCK 05000251 G

PDR

,