ML20084D351

From kanterella
Jump to navigation Jump to search
Informs of Insp Completion Re safety-related Pipe Restraints Accessible During Power Operation on 741021.All Restraints Operable & All Restraints Are of Bergen-Paterson Design
ML20084D351
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 10/23/1974
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Anthony Giambusso
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20084D330 List:
References
NUDOCS 8304110109
Download: ML20084D351 (1)


Text

s 6-o

~~.,~-- mr.-}, m,,

P.O. OCX 3100 NBAMI, fiOFIDA 33101

\\

Yb YJ 'L.../qlh

/

(j L.1 4

FLOR 1DA PO\\*.EH & LiOHT CO'.'PA*iY October 23, 1974

) u gr %,

, fy $f-' ~..

jf 'g{jWl,y:l=//t/)

Mr. Angelo Giambusso Deputy Director for Reactor Projects Directorate of Licensing

$tt; ' 4. h Mk '

,l

.r,.

3,..

Office of Regulation

. 'CJ: d;;;-

10 f

U.

S. Atomic Energy Commission

'Q 9h/"M Y c/

Washington, D.

C.

20545

'.'L.j,.

s >.-

Dear Mr. Giambusso:

TURKEY POINT UNIT NO. 3 DOCKET NO. 50-250 INSPECTION OF SAFETY RELATED HYDRAULIC PIPE RESTRAINTS Inspection of the safety related pipe restraints that are accessi-ble during power operation was completed on October 21, 1974, in accordance with the continuing requirements of the Atomic Energy Commission Directorate of Licensing letter of November 8, 1973.

All of the restraints were found to be in an operable condition.

Ilydraulic fluid was added to two restraints to bring their fluid level to the upper end of the allowable level band.

The inspection included a total of 20 restraints and all are of the Bergen-Paterson design.

Very truly yours,

,/ /,. L//

q jl

!(

, Li h r 9 Q... i.s Robert E.

Uhrig

/

Vice President REU/IINP/cpc i

cc:

Mr. Norman C. Moseley Jack R. Newman, Esquire 1

e 1

1 E

r-I bb ltiY A1100.

l 8304110109 741024 PDR ADDCK 05000251 O

/

PDR GION A,> n a.bN r IE, w,% a. m.

s 2

.s.

ou

,,,n

>w

--,,wa

-m