ML20084D410

From kanterella
Jump to navigation Jump to search
Informs of Reinsp Completion of Bergen-Paterson Accessible safety-related Hydraulic Piping Restraints,On 740613,per AEC .All Restraints Are in Satisfactory Condition
ML20084D410
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 06/25/1974
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Anthony Giambusso
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20084D330 List:
References
NUDOCS 8304110170
Download: ML20084D410 (1)


Text

,

FLORIDA POWER & LIGHT COMPANY June 25, 1974

\\

e T i,. s.

(

lll l l{

Mr. Angelo Giambusso

W Deputy Director for Reactor Projects i

M.

Directorate of Licensing 13'g.

E,

' 'r i Office of Regulation L.

U. S. Atomic Energy Commission

'(

Washington, D. C.

20545 N Trs s

Dear Mr. Giambusso:

' ~~

TURKEY POINT UNIT NO. 4 DOCKET NUMBER 50-251 REINSPECTION OF SAFETY RELATED l

HYDRAULIC PIPE RESTRAINTS ACCESSIBLE DURING POWER OPERATION Reinspection of the accessible safety related piping res-traints in accordance with the continuing requirements of the Directorate of Licensing letter of November 8,1973, was completed on June 13, 1974.

There were 15 restraints inspected and all are of the Bergen-Paterson design.

The inspection showed that all of these restraints were in sat-isfactory condition.

Very truly yours,

}ht/Nr c~

R. E. Uhrig Vice President i

REU/HNP/kaw

\\