ML20084D326

From kanterella
Jump to navigation Jump to search
Informs of Completion of Insp Re safety-related Hydraulic Pipe Restraints Accessible During Power Operation on 741012, Per AEC .One Restraint Located on Main Steam Piping Indicated Fluid Level Below Min Level
ML20084D326
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 10/24/1974
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Anthony Giambusso
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20084D330 List:
References
NUDOCS 8304110085
Download: ML20084D326 (1)


Text

-

P.O. BCX 31C3 MIAMI, FLOSIDA 33101 FLORIDA POWER & LIGHT COMPANY f

October 24, 1974 e

w 9

G fjg$

I 0

Mr. Angelo Giambusso g9 s

Deputy Director for Reactor Projects E'

Directorate of Licensing OCTs! 197 4 r Office of Regulation 04 McM!C agga

'l 7"$

U. 8. Atomic Energy Commission ni$ k -

l Mashington, D. C.

20545 4

I

Dear Mr. Giambusso:

tu i

l TURKEY POINT UNIT NO. 4 l

DOCEET NO. 50-251 l

INSPECTION OF SAFETY RELATED HYDRAULIC PIPE RESTRAINTS Inspection of the saf.ety related pipe restraints that are accessi-ble during power operation was cosipleted on october 12, 1974, in accordance with the continuing requirements of the Atomic Energy comunission Directorate of Licensing letter of November 8,1973.

One restraint located on the main steam piping had an indicated l

hydraulic fluid level that was below the minimum acceptable level.

This restraint was replaced with a spare unit.

The loss of fluid is believed to be the result of mechanical wear of the piston shaft packing as described in our previous inspection report dated August 26, 1974.

The inspection included a total of 15 restraints and all are ok tb*;.Bergen-Paterson design.

very truly yours, bw Robert E. Uhrig Vice President REU/IDIP/cyc I

cc:

Mr. Norman C. Moseley Jack R. Newunan, Esquire h,

'cl-

}

,UV y

i 8304110085 741024 PDR ADOCK 05000251