ML20084D406
| ML20084D406 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 07/01/1974 |
| From: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| To: | Anthony Giambusso US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML20084D330 | List: |
| References | |
| NUDOCS 8304110164 | |
| Download: ML20084D406 (1) | |
Text
_
m i
FLORIDA POWER & UGHT COMPANY July 1, 1974
.h
'[v s h 4,
Mr. Angelo Giambusso q,
Deputy Director for Reactor Projects 14 ts
%ca Directorate of Licensing Office of Regulation s
y U. S. Atomic Energy Commission g/
Washington, D. C.
20545 N
Dear Mr. Giambusso:
TURKEY POINT UNIT NO. 3 DOCKET NO. 50-250 INSPECTION OF SAFETY RELATED HYDRAULIC PIPE RESTRAINTS Inspection of the safety related pipe restraints that are ac-cessible during power operation was completed on June 20, 1974, in accordance with the continuing requirements of the Atomic Energy Commission Directorate of Licensing letter of November 8, 1973.
The inspection showed that all of the restraints were operable.
The inspection included a total of twenty (20) re-straints and all are of the Bergen-Paterson design.
Sincerely,
) qy 7
1 m
s.
- ?_\\.4/uv t1 gg M*
R. E. Uhrig Vice President REU/HNP/kaw cc:
Mr. Norman C. Moseley l
1 Jack R. Newman, Esquire t-k
- O i
e' ) S L
e l
' ) b-l3 i
i 8304110164 741024 COPY SENT RF)GION M_
(,)
p PDR ADOCK 05000251 I
lL O
I PM f
H E LPING BUILD FLORID A