ML20084D452
| ML20084D452 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 02/21/1974 |
| From: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| To: | Anthony Giambusso US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML20084D330 | List: |
| References | |
| NUDOCS 8304110230 | |
| Download: ML20084D452 (1) | |
Text
.
i g
e.o. sox sieo war. nonioA asici L/
W j@tt//,
1 E.
jop?
hi=m - ^
.u.
l February 21, 1974 s
Mr. Angelo Giambusso
' ^ '
Deputy Director for Reactor Projects r*"
Directorate of Licensing
.. 'Q O '-
Officue of Regulation
.h g/)
U. S. Atomic Energy Commission D
Washington, D. C.
30545 4
7' i
.'d ?, Ohs t,Q-79
Dear Mr. Giambusso:
c :, N'g.nt'}
s
~
V TURKEY POINT UNIT NO. 4
- b
=
DOCKET NO. 50-251 g
y
(
INSPECTION OF SAFETY RELATED HYDRAULIC %,
j PIPE RESTRAINTS
- r Inspection of the safety related pipe restraints that are accessible during power operation was conducted on February 8, 1974.
The inspection was in accordance with the con-tinuing requirements of the Atomic Energy Commission j
Directorate of Licensing letter of November 8, 1973.
All of the restra.ints inspected were found to be operable.
The inspection included a total of seven restraints all of which were of the Bergen-Paterson design.
Very truly yours, f)
Ge,) l Y / G T.. n / 0 f }l a a
'R'.
E. Uhrig
~
3' Director of Nuclear Affairs HNP/REU/kmw cc:
Mr. Norman C. Moseley, Director Region II Mr. Jack R. Newman 4
1 i.
- /.
N
\\
1[.
hu3 9,j, L f.
QA 8304110230 741024 d
A PDR ADOCK 05000251 G
PDR l
H E L P I N G D UI L O F L Q A ' D A g