ML20084D444
| ML20084D444 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 03/25/1974 |
| From: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| To: | Anthony Giambusso US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML20084D330 | List: |
| References | |
| NUDOCS 8304110221 | |
| Download: ML20084D444 (1) | |
Text
.
m FLORIDA POWER & UGHT COMPANY March 25, 1974 Mr. Angelo Giambusso Deputy Director for Reactor Projects Directorate of Licensing Office of Regulation U. S. Atomic Energy Commission Washington, D. C.
20545
Dear Mr. Giambusso:
TURKEY POINT UNIT NO. 4 DOCKET NO. 50-251 REINSPECTION OP HYDRAULIC PIPE RESTRAINTS Reinspection of the safety related hydraulic pipe restraints that are accessible during power operation was completed on March 12, 1974, in accordance with the continuing require-ments of the Directorate of Licensing letter dated November 8, 1973.
The inspection revealed that all of the restraints were operable.
There were seven restraints inspected and all are of the Bergen-Paterson design.
Very truly yours,
- l. p. k ?>w}
1~
R. E. Uhrig Director of Nuclear Affairs REU/HNP/kaw cc:
Mr. Norman C. Moseley Mr. Jack R. Newman
/
ali (G,{ k N'l '
o 1
(.
y e,q ;p.Q-
' )D3 y l')
0f -)
1 j
v
.0 y:. :,
c:- c;i y 7;1 Q O +hT [4(ffth D4
/z
(
)
1,.
ue 8304110221 741024 4
nmcI11 PDR ADDCK 05000251 G >]El \\}- ls G
/
H E LPIN G OUILO FLO