ML20084D370

From kanterella
Jump to navigation Jump to search
Informs of Insp Completion Re safety-related Hydraulic Pipe Restraints Accessible During Power Operation,On 740912,per AEC .All Restraints Are of Bergen-Paterson Design & in Satisfactory Condition
ML20084D370
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 09/25/1974
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Anthony Giambusso
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20084D330 List:
References
NUDOCS 8304110125
Download: ML20084D370 (1)


Text

'

i p

FLORIDA POWER & LIGHT COMPAPsY j

Septestber 25, 1974 1

i i

Mr. Angelo Giambusso l

Deputy Director for Reactor Projects i

Directorate of Licensing

}

Office of Regulation.

]

U. S. Atomic Energy Constission Washington, D. C.

20545 1

l Dear Mr. Giambussos a

TURKEY POINT UNIT NO. 4 l

DOCKET NO. 50-251 INSPECTION OF SAFETY RELATED HYDRAULIC PIPE RESTRAINTS Inspection of the safety related pipe restraints that are accessi-ble during power operation was completed on September 12, 1974, in i

accordance with the continuing requirements of the Atomic Energy Commission Directorate of Licensing letter of November 8, 1973.

All of the restraints were found to be in satisfactory condition.

The inspection included a total of 15 restraints and all are of the Bergen-Paterson design.

i very truly yours,

/

l bDs& ~2fL.

Robert E. Uhrig Vice President 1

REU/HNP/cpc oc Mr. Norman C. Moseley Jack R. Newman, Esquire 1

Sc-Til 8304110125 741024 A'/1/ #d^'

j PDR ADOCK 0500025 j

i 0

COPY SENT REGION

-.....-.-. -. - -. -.. -.. H E Ly1Ny yyf Ly}OR

,