Informs of Insp Completion Re safety-related Pipe Restraints Accessible During Power Operation,On 740920,per AEC .All Restraints Found in Satisfactory Condition
ML20084D359
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 10/02/1974
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Anthony Giambusso
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20084D330 List:
References
NUDOCS 8304110114
Download: ML20084D359 (1)


Text

_

FLORIDA POWER & UGHT COMPANY October 2, 1974

,- er p.

G

.~ s pre i

4_

0,o Mr. Angelo Giambusso i0CTI 51974c-1.

Deputy Director for Reactor Projects MA MCM:C u,tas 7

Directorate of Licensing h@NM Office of Regulation Wu i

U. S. Atomic Energy Connaission E

Washington, D. C.

20545 O2 i

Dear Mr. Giambusson TURKEY POINT UNIT NO. 3 DOCKET NO. 50-250 INSPECTION OF SAFETY RELATED j

HYDRAULIC PIPE RESTRAINTS i

Inspection of the safety related pipe restraints that are accessi-ble during power operation was completed on September 20, 1974, in accordance with the continuing requirements of the Atomic Energy Commission Directorate of Licensing letter of November 8, 1973.

All of the restraints were found to be in satisfactory condition.

The inspection included a total of 20 restraints and all are of the Bergen-Paterson design.

Very truly yours, e

L Robert E. Uhrig Vice President REU/HNP/cpc cc: