05000302/LER-1983-039, Informs That Engineering Investigation of 12 Process Instruments Discovered Out of Calibr During Surveillance Testing & Reported in LER 83-039 Nearing Completion.Next Rept Expected by 840127

From kanterella
(Redirected from ML20083A514)
Jump to navigation Jump to search
Informs That Engineering Investigation of 12 Process Instruments Discovered Out of Calibr During Surveillance Testing & Reported in LER 83-039 Nearing Completion.Next Rept Expected by 840127
ML20083A514
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/13/1983
From: Westafer G
FLORIDA POWER CORP.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
3F1283-22, 831231, NUDOCS 8312200306
Download: ML20083A514 (2)


LER-2083-039, Informs That Engineering Investigation of 12 Process Instruments Discovered Out of Calibr During Surveillance Testing & Reported in LER 83-039 Nearing Completion.Next Rept Expected by 840127
Event date:
Report date:
3022083039R00 - NRC Website

text

_ _ _ _ _ _ _

g .-

eco waa b O

  • S$$f ooo M

Power C O n p O s A T s O se December 13,1983 3F1283-22 Mr. James P. O'Reilly Regional Administrator, Region II Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30303

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Licensee Event Report No.83-039

Dear Mr. O'Reilly:

On October 13, 1983, Florida Power Corporation (FPC) submitted Licensee Event Report (LER)83-039. This report indicated that approximately a dozen process instruments were discovered to be out of calibration during surveillance testirg.

The report also indicated that the cause of the discrepancies was still under investigation and that a supplement detailing cause and corrective action would be submitted on or before December 13,1983.

As of this time, the engineering investigation is nearing completion. Multiple causes for the discrepancies have been identified and corrective actions partially addressing these causes have already been implemented. However, a management concensus has not yet been reached as to the validity / seriousness of other alleged causes, and other corrective actions that may be appropriate. Additionally, some of the technical data collection required for the report is incomplete. Therefore, the supplement detailing the causes and corrective actions related to this event will be submitted on or before January 27,1983.

./

8312200306 831213 PDR ADOCK 05000302 s PDR

' Wi 'it y < r:..

JftL I i

4 GEN ERAL OFFICE 3201 Thirty-fourth Street South e P.O. Box 14042, St. Peterst:urg, Florida 33733 e 813-8 45151

, s-December 13,1983 3F1282-22 Page 2 Should there be any questions, please contact this office.

Sincerely, G. R. Westafer Manager, Nuclear Operations Licensing and Fuel Management AEF/feb Enclosure cc: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555 1