NRC-95-0028, Monthly Operating Rept for Feb 1995 for Fermi 2

From kanterella
(Redirected from ML20081D880)
Jump to navigation Jump to search
Monthly Operating Rept for Feb 1995 for Fermi 2
ML20081D880
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 02/28/1995
From: Mckeon R, Stone B
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-95-0028, CON-NRC-95-28 NUDOCS 9503210055
Download: ML20081D880 (4)


Text

- ~ . - . _

h -:

Robert McKeon

~ AssWant Vce Presderd . .l

  • and Marager, Operat one . . , I 6400 h Oue Hwy
Edison. w2"a"'" 1r w.u. ,

l l

Reg Guide 1.16 March 15, 1995 NRC-95-0028 U. S. Nuclear Regulatory Commissior Attention: Document Control Desk Washington, D.C. 20555

Reference:

Fermi 2 WRC Docket No. 50-341 NRC Operating License No. NPF-43

Subject:

Monthly Operating Status Report for February. 1995 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for February, 1995. This report includes the Operating Data Report, Average Daily Unit Power-Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Feral 2 Technical Specification 6.9.1.6.

If you have any questions, please contact Brian Stone, at (313) 586-5148.

1 Sincerely, l l

k $'

i Enclosure <

cc: T. G. Colburn j D. R. Hahn J. B. Martin J M. P. Phillips  !

P. L. Torpey A. Vegel 1

9503210055 DR 950228 ADOCK 05000341 i PDR t

1 y ' t 44 s .

OPERATING DATA REPORT j DOCKET NO. 50-341 COMPLETED BY B. J. Stone l DATE Harch 15, 1995 TELEPil0NE (313) 586-5148 OPERATING STATUS I

1. UNIT NAME: Fermi 2 l Notes: (1) Calculated using weight-l l
2. REPORTING PEHIOD: February, 1995 l ed averages to reflect variations 1 3 LICENSED TilERHAL POWER (HWt): 3430 l In rating (MDC and DER). I
4. NAMEPLATE HATING (GROSS MWe): 1179 l (2) Currently limiting power to 1
5. DESIGN ELECT RATING (Net HWe): 1116 l 80% CTP maximum for Startup Test l
6. HAX DEPENDABLE CAP ' GROSS MWe):1135 l Program. All ratings reflect 985 l l 7 HAX DEPENDAllLE CM8 (Not HWe):1085 l CTP due to turbine throttle *, lve l l limitations. l
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 TilROUGil 7) SINCE  !

LAST HEPORT, GIVE ItEASONS: N/A 9 POWEli LEVEL TO WilICil HESTitICTED, IF ANY (HWe het): (2) I

10. REASONS FOR ltESTitICTION, IF ANY: (2)

TilIS HONTil Ylt TO DATE CUHULATIVE

11. HHS IN HEPORTING PEltIOD 672 1416 62,246
12. IIRS ItEACTOR WAS CRITICAL 275 943.8 41,679.4
13. REACTOR ltESERVE SilUTDOWN llRS 0 0 0 l
14. Il0URS GENEllAT0ft ON-LINE 31.9 243.4 39,367.8
15. UNIT HESEltVE SilUTDOWN 1100RS 0 0 0
16. GROSS TilERHAL ENERGY GEN (HWH) 120,528 608,880 120,322,931
17. Git 0SS El.ECT ENEltGY GEN (HWil) 11.150 96,060 40,060,017 f
18. NET ELECT ENERGY GEN (HWil) 9,878 77,938 38,311,653
19. UNIT SEftVICE FACTOR 4.8 17.2 63 3
20. UNIT AVAILABILITY FACTOR 4.8 17.2 63 3
21. UNIT CAP FACT 0H (USING HDC NET) 1.4 5.1 57.3
22. UNIT CAP FACTOR (USING DER NET) 1.3 4.9 55.9
23. UNIT FoliCEli OUTAGE HATE 95.1 81.1 22.5
24. SilVTDOWNS SCilEDULED OVER NEXT 6 MONTilS (TYPE, DATE, DURATION OF EACil):

'5. IF SilVT IOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

MARCil 13, 1995.

26. UNITS IN TEST STATUS (Pili 0lt TO COMMERCIAL OPERATION):

FORECAST ACilIEVED INITIAL, CHITICALITY N/A N/A INITI AL El.ECTitICITY N/A N/A COMMERCIAL. OPEHATION N/A N/A

_. __ , . _ _ _ _~

.f, . -.

-AVERAGE DAILY UNIT PONER LEVEL'

. I e -DOCKET NO. 50-341 UNIT FERMI 2

-DATE March 15, 1995 COMPLETED BY. II. Stone TELEPHONE (313) 586-5148 ,

i Hont.h Febeuary, 1995 DAY . AVEHAGE DAll.Y POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (HWo-Net) (MWe-Net) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 l l

5 0 21 0 6 0 22 0 7 _

0 23 0 l 8 0 24 0 9 0 25 0 l

10 0 26 0 11 0 27 0 l 12 21 3 28 0 13 370 l 1

14 0 15 0 16 0 l

1 i

r e P

i .-

UNIT SHUTDOWNS AND POWER REDUCTIONS s e.

DATE Marco 15. 1995 .

DOCKET NO. 50-34 LOMDLETED Dv B. J. Stone ,

UNIT NAME Fermi 2 TELEPeONE (313i 586-5146 REPORT MONTm 5eervarv. 190% ,

l'

~~

ufTmOD D E ,

}

  • Sr;TTING don'. i lee SYS  ! COM? CAUSE & CORRECT:sE '

T . :- - rA r, i t s m, Tc LEtrTra  % r,N C cc : ACTION T(- PREeU'

  • .' pt*; GECURRENCE

("E 2' Uk EEbCCING 14 IE' 4

f

~

%'w E r l 2 t ,

$ t i t

I 6 i  ! .

ITuroine taken off-line to per+orm i 5 2C E f4 / A 1 N/A i TA 1 TRS

! 595-0t 4 950127 '

i loost outage calancing.  !

(8: I i i i

i i i

i  !

t i i i

i i i i i

ITurnine remainea o+f-line to repair i 4 5 0 2't ? r i 259 i B i N/A I N/A i TD i PSP I I 595-OJ i I i l ls4 jacking oil pump disch&rge

.  ! l (9e (piping. I i

! 1 i I i  !  ! i ,

I t I 1 8

! i i  !

i t i i i i j

i l 595-03 1 950213 I

{ F i

!361.1 l B l 1 N/A l TO l PSP { Turbine taken off-line to repair lturoine jacaing oil system ,

4

! l } l j l I f

! structural concerns.

l l l i  !  !  ! I l

'  !  ! i 1  !

! l (3) METHOD: (4) INSTRUCTIONS FOR (1) F: FORCED (2) REASON: 1 - MANUAL PREPARATION OF DATA 5: SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 2 - MANUAL SCRAM ENTRY SHEETS FOR LICENSEE B - MAINTENANCE OR TEST EVENT REPORT (LER) FILE C- REFUELING 3 - AUTOMATIC SCRAW 4 - CONTINUED (NUREG-1022)

D- REGULATORY RESTRICTION E - OPERATOR TRAINING & LICENSE EXAMINATION 5 - REDUCED LO=D F - ADMINISTRATIVE 9 - OTHER G - ODERATIONAL ERPOR (EXPLAIN) (5) SAME SOURCE AS (4)

H - OTHER (EXPLAIN)

(6) 9 - PREFIX INDICATES POWER REDUCTION.

5- PREFIX INDICATES PLANT SHUTDOWN.

(7) DURATION OF REDUCTIONS REPORTED AS 2ERO PER REG.

GUIDE 1.16 REV. 4 (8) Outage nours are a continuation of the outage unich began on 01/27/95.

(9) Outage hours are forced continuation of outage which began on 01/27/95.

_