Text
_ _
- ~
h -:
Robert McKeon
. l
~ AssWant Vce Presderd.
and Marager, Operat one 6400 h Oue Hwy
- Edison. w2"a"'"
1r w.u.
Reg Guide 1.16 March 15, 1995 NRC-95-0028 U. S. Nuclear Regulatory Commissior Attention: Document Control Desk Washington, D.C.
20555
Reference:
Fermi 2 WRC Docket No. 50-341 NRC Operating License No. NPF-43
Subject:
Monthly Operating Status Report for February. 1995 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for February, 1995. This report includes the Operating Data Report, Average Daily Unit Power-Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Feral 2 Technical Specification 6.9.1.6.
If you have any questions, please contact Brian Stone, at (313) 586-5148.
Sincerely, l
l k
i Enclosure cc:
T. G. Colburn j
D. R. Hahn J. B. Martin J
M. P. Phillips P. L. Torpey A.
Vegel 1
9503210055 950228 DR ADOCK 05000341 i
PDR t
y '
t 44 OPERATING DATA REPORT j
s DOCKET NO.
50-341 COMPLETED BY B. J. Stone DATE Harch 15, 1995 TELEPil0NE (313) 586-5148 OPERATING STATUS 1.
UNIT NAME:
Fermi 2 l Notes:
(1) Calculated using weight-l 2.
REPORTING PEHIOD: February, 1995 l ed averages to reflect variations 1
3 LICENSED TilERHAL POWER (HWt):
3430 l In rating (MDC and DER).
I 4.
NAMEPLATE HATING (GROSS MWe):
1179 l (2) Currently limiting power to 1
5.
DESIGN ELECT RATING (Net HWe): 1116 l 80% CTP maximum for Startup Test l
6.
HAX DEPENDABLE CAP ' GROSS MWe):1135 l Program. All ratings reflect 985 l
7 HAX DEPENDAllLE CM8 (Not HWe):1085 l CTP due to turbine throttle *, lve l
l limitations.
l 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 TilROUGil 7) SINCE LAST HEPORT, GIVE ItEASONS:
N/A 9
POWEli LEVEL TO WilICil HESTitICTED, IF ANY (HWe het):
(2)
- 10. REASONS FOR ltESTitICTION, IF ANY:
(2)
TilIS HONTil Ylt TO DATE CUHULATIVE
- 11. HHS IN HEPORTING PEltIOD 672 1416 62,246
- 12. IIRS ItEACTOR WAS CRITICAL 275 943.8 41,679.4
- 13. REACTOR ltESERVE SilUTDOWN llRS 0
0 0
l
- 14. Il0URS GENEllAT0ft ON-LINE 31.9 243.4 39,367.8
- 15. UNIT HESEltVE SilUTDOWN 1100RS 0
0 0
- 16. GROSS TilERHAL ENERGY GEN (HWH) 120,528 608,880 120,322,931
- 17. Git 0SS El.ECT ENEltGY GEN (HWil) 11.150 96,060 40,060,017 f
- 18. NET ELECT ENERGY GEN (HWil) 9,878 77,938 38,311,653
- 19. UNIT SEftVICE FACTOR 4.8 17.2 63 3
- 20. UNIT AVAILABILITY FACTOR 4.8 17.2 63 3
- 21. UNIT CAP FACT 0H (USING HDC NET) 1.4 5.1 57.3
- 22. UNIT CAP FACTOR (USING DER NET) 1.3 4.9 55.9
- 23. UNIT FoliCEli OUTAGE HATE 95.1 81.1 22.5
- 24. SilVTDOWNS SCilEDULED OVER NEXT 6 MONTilS (TYPE, DATE, DURATION OF EACil):
'5.
IF SilVT IOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
MARCil 13, 1995.
- 26. UNITS IN TEST STATUS (Pili 0lt TO COMMERCIAL OPERATION):
FORECAST ACilIEVED INITIAL, CHITICALITY N/A N/A INITI AL El.ECTitICITY N/A N/A COMMERCIAL. OPEHATION N/A N/A
~
.f,.
-AVERAGE DAILY UNIT PONER LEVEL' e
-DOCKET NO.
50-341 UNIT FERMI 2
-DATE March 15, 1995 COMPLETED BY.
II. Stone TELEPHONE (313) 586-5148 i
Hont.h Febeuary, 1995 DAY. AVEHAGE DAll.Y POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (HWo-Net)
(MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
l 8
0 24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 21 3 28 0
13 370 1
14 0
15 0
16 0
i
r e
P i
UNIT SHUTDOWNS AND POWER REDUCTIONS s
e.
DATE Marco 15. 1995 DOCKET NO.
50-34 LOMDLETED Dv B.
J.
Stone UNIT NAME Fermi 2 TELEPeONE (313i 586-5146 REPORT MONTm 5eervarv. 190%
l' E
~~
ufTmOD D Sr;TTING don'. i lee SYS
! COM?
CAUSE & CORRECT:sE
}
- pt*;
T. :- -
rA r, i t s m, Tc LEtrTra r,N C cc :
ACTION T(- PREeU'
("E 2'
Uk EEbCCING 14 IE' GECURRENCE 4
f
~
%'w E r l 2 t
t
$ t i
I 6
i
! 595-0t 4 950127 5
2C E
f4 / A 1 N/A i
TA 1 TRS ITuroine taken off-line to per+orm i
(8:
I i
loost outage calancing.
i i
i i
i i
i i
i t
i i
i i
i I 595-OJ 4 5 0 2't ?
i r
i 259 i B
i N/A I N/A i
TD i PSP ITurnine remainea o+f-line to repair i
i I
i l
ls4 jacking oil pump disch&rge I
l (9e I
i i
1 i
I (piping.
i i
i I
t I
1 8
i i
i i
I i
i t
i
{
F
!361.1 l B
l 1
N/A l TO l PSP
{ Turbine taken off-line to repair j
l 595-03 1 950213 4
l I
f l
}
l lturoine jacaing oil system j
i I
l l
l
! structural concerns.
l l
i 1
(3) METHOD:
(4) INSTRUCTIONS FOR (1) F: FORCED (2) REASON:
5: SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM ENTRY SHEETS FOR LICENSEE 3 - AUTOMATIC SCRAW EVENT REPORT (LER) FILE C-REFUELING 4 - CONTINUED (NUREG-1022)
D-REGULATORY RESTRICTION E - OPERATOR TRAINING & LICENSE EXAMINATION 5 - REDUCED LO=D F - ADMINISTRATIVE 9 - OTHER G - ODERATIONAL ERPOR (EXPLAIN)
(5) SAME SOURCE AS (4)
H - OTHER (EXPLAIN)
(6) 9 - PREFIX INDICATES POWER REDUCTION.
5-PREFIX INDICATES PLANT SHUTDOWN.
(7) DURATION OF REDUCTIONS REPORTED AS 2ERO PER REG.
GUIDE 1.16 REV. 4 (8) Outage nours are a continuation of the outage unich began on 01/27/95.
(9) Outage hours are forced continuation of outage which began on 01/27/95.