MONTHYEARLIC-99-0096, Monthly Operating Rept for Sept 1999 for Fcs,Unit 1.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Fcs,Unit 1.With LIC-99-0084, Monthly Operating Rept for Aug 1999 for Fort Calhoun Station.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Fort Calhoun Station.With ML20210R1961999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Fcs,Unit 1 LIC-99-0065, Monthly Operating Rept for June 1999 for Fort Calhoun Station,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Fort Calhoun Station,Unit 1.With ML20210R2081999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Fcs,Unit 1 LIC-99-0053, Monthly Operating Rept for May 1999 for Fort Calhoun Station,Unit 11999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Fort Calhoun Station,Unit 1 LIC-99-0047, Monthly Operating Rept for Apr 1999 for Fort Calhoun Station Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Fort Calhoun Station Unit 1.With LIC-99-0034, Monthly Operating Rept for Mar 1999 for Fcs,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Fcs,Unit 1.With LIC-99-0025, Monthly Operating Rept for Feb 1999 for Fort Calhoun Station,Unit 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Fort Calhoun Station,Unit 1.With LIC-99-0003, Monthly Operating Rept for Dec 1998 for Fort Calhoun Station.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Fort Calhoun Station.With LIC-98-0172, Monthly Operating Rept for Nov 1998 for Fort Calhoun Station,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Fort Calhoun Station,Unit 1.With LIC-98-0154, Monthly Operating Rept for Oct 1998 for Fort Calhoun Station,Unit 1.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Fort Calhoun Station,Unit 1.With LIC-98-0136, Monthly Operating Rept for Sept 1998 for Fort Calhoun Station,Unit 1.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Fort Calhoun Station,Unit 1.With LIC-98-0122, Monthly Operating Rept for Aug 1998 for Fort Calhoun Station Unit 1.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Fort Calhoun Station Unit 1.With LIC-98-0105, Monthly Operating Rept for July 1998 for Fort Calhoun Station1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Fort Calhoun Station LIC-98-0092, Monthly Operating Rept for June 1998 for Fort Calhoun Station,Unit 11998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Fort Calhoun Station,Unit 1 LIC-98-0078, Monthly Operating Rept for May 1998 for Fort Calhoun Station Unit 11998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Fort Calhoun Station Unit 1 LIC-98-0070, Monthly Operating Rept for Apr 1998 for Ft Calhoun Station1998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Ft Calhoun Station LIC-98-0058, Monthly Operating Rept for Mar 1998 for Fcs,Unit 11998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Fcs,Unit 1 LIC-98-0035, Monthly Operating Rept for Feb 1998 for Fcs,Unit 11998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Fcs,Unit 1 LIC-98-0016, Monthly Operating Rept for Jan 1998 for Fort Calhoun Station1998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Fort Calhoun Station LIC-98-0002, Monthly Operating Rept for Dec 1997 for Fcs,Unit 11997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Fcs,Unit 1 LIC-97-0191, Monthly Operating Rept for Nov 1997 for Fcs,Unit 11997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Fcs,Unit 1 LIC-97-0179, Monthly Operating Rept for Oct 1997 for Fcs,Unit 11997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Fcs,Unit 1 LIC-97-0163, Monthly Operating Rept for Sept 1997 for Fcs,Unit 11997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Fcs,Unit 1 LIC-97-0149, Monthly Operating Rept for Aug 1997 for Fort Calhoun Station Unit 11997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Fort Calhoun Station Unit 1 LIC-97-0137, Monthly Operating Rept for Jul 1997 for Fort Calhoun Station1997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Fort Calhoun Station LIC-97-0115, Monthly Operating Rept for June 1997 for Fort Calhoun Station,Unit 11997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Fort Calhoun Station,Unit 1 ML20148L9291997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Fort Calhoun Station Unit 1 LIC-97-0081, Monthly Operating Rept for April 1997 for FCS1997-04-30030 April 1997 Monthly Operating Rept for April 1997 for FCS LIC-97-0054, Monthly Operating Rept for Mar 1997 for Fort Calhoun Station Unit 11997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Fort Calhoun Station Unit 1 ML20136G5911997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Fort Calhoun Station ML20134M4281997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Fort Calhoun Station Unit 1 LIC-97-0002, Monthly Operating Rept for Dec 1996 for Fort Calhoun Station Unit 11996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Fort Calhoun Station Unit 1 ML20134M4341996-12-31031 December 1996 Revised Monthly Operating Rept for Dec 1996 for Fort Calhoun Station Unit 1 LIC-96-0196, Monthly Operating Rept for Nov 1996 for Fort Calhoun Station Unit 11996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Fort Calhoun Station Unit 1 LIC-96-0174, Monthly Operating Rept for Oct 1996 for FCS Unit 11996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for FCS Unit 1 LIC-96-0152, Monthly Operating Rept for Sept 1996 for Fort Calhoun Station Unit 11996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Fort Calhoun Station Unit 1 LIC-96-0134, Monthly Operating Rept for Aug 1996 for Fort Calhoun Station1996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Fort Calhoun Station LIC-96-0113, Monthly Operating Rept for Jul 1996 for Fort Calhoun Station Unit 11996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Fort Calhoun Station Unit 1 LIC-96-0096, Monthly Operating Rept for June 1996 for Fort Calhoun Station Unit 11996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Fort Calhoun Station Unit 1 LIC-96-0084, Monthly Operating Rept for May 1996 for Fort Calhoun Station Unit 11996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Fort Calhoun Station Unit 1 ML20117G0821996-04-30030 April 1996 Monthly Operating Rept for April 1996 for FCS ML20117G0841996-03-31031 March 1996 Revised MOR for March 1996 for FCS LIC-96-0036, Monthly Operating Rept for Feb 1996 for Calhoun Station,Unit 11996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Calhoun Station,Unit 1 LIC-96-0016, Monthly Operating Rept for Jan 1996 for Fort Calhoun Station Unit 11996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Fort Calhoun Station Unit 1 LIC-96-0004, Monthly Operating Rept for Dec 1995 for Fort Calhoun Station1995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Fort Calhoun Station LIC-95-0233, Monthly Operating Rept for Nov 1995 for FCS Unit 11995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for FCS Unit 1 ML20093G7571995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Fort Calhoun Station Unit 1 LIC-95-0172, Monthly Operating Rept for Aug 1995 for Fort Calhoun Station1995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Fort Calhoun Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217B5401999-10-0606 October 1999 Safety Evaluation Supporting Amend 193 to License DPR-40 ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data LIC-99-0096, Monthly Operating Rept for Sept 1999 for Fcs,Unit 1.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Fcs,Unit 1.With ML20211J9321999-09-0202 September 1999 Safety Evaluation Concluding That Licensee Proposed Alternatives Provide Acceptable Level of Quality & Safety. Proposed Alternatives Authorized for Remainder of Third ten- Yr ISI Interval for Fort Calhoun Station,Unit 1 LIC-99-0084, Monthly Operating Rept for Aug 1999 for Fort Calhoun Station.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Fort Calhoun Station.With ML20216E6431999-08-26026 August 1999 Rev 19 to TDB-VI, COLR for FCS Unit 1 ML20210R1961999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Fcs,Unit 1 ML20210G2181999-07-27027 July 1999 Safety Evaluation Supporting Amend 192 to License DPR-40 ML20210D9951999-07-22022 July 1999 Safety Evaluation Supporting Amend 191 to License DPR-40 ML20216E6361999-07-21021 July 1999 Rev 18 to TDB-VI, COLR for FCS Unit 1 ML20210R2081999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Fcs,Unit 1 LIC-99-0065, Monthly Operating Rept for June 1999 for Fort Calhoun Station,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Fort Calhoun Station,Unit 1.With ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML20210P5461999-06-0808 June 1999 Rev 0,Vols 1-5 of Fort Calhoun Station 1999 Emergency Preparedness Exercise Manual, to Be Conducted on 990810. Pages 2-20 & 2-40 in Vol 2 & Page 4-1 in Vol 4 of Incoming Submittal Not Included ML20195B4581999-05-31031 May 1999 Rev 3 to CE NPSD-683, Development of RCS Pressure & Temp Limits Rept for Removal of P-T Limits & LTOP Requirements from Ts ML20207H7401999-05-31031 May 1999 Performance Indicators Rept for May 1999 LIC-99-0053, Monthly Operating Rept for May 1999 for Fort Calhoun Station,Unit 11999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Fort Calhoun Station,Unit 1 ML20195B4521999-05-17017 May 1999 Technical Data Book TDB-IX, RCS Pressure - Temp Limits Rept (Ptlr) ML20206L4241999-05-10010 May 1999 Safety Evaluation Supporting Corrective Actions to Ensure That Valves Are Capable of Performing Intended Safety Functions & OPPD Adequately Addressed Requested Actions Discussed in GL 95-07 ML20206M2601999-05-0606 May 1999 SER Concluding That Licensee IPEEE Complete Re Info Requested by Suppl 4 to GL 88-20 & IPEEE Results Reasonable Given FCS Design,Operation & History LIC-99-0047, Monthly Operating Rept for Apr 1999 for Fort Calhoun Station Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Fort Calhoun Station Unit 1.With ML20195E8621999-04-30030 April 1999 Performance Indicators, for Apr 1999 ML20205Q5831999-04-15015 April 1999 Safety Evaluation Supporting Amend 190 to License DPR-40 ML20210J4331999-03-31031 March 1999 Changes,Tests, & Experiments Carried Out Without Prior Commission Approval for Period 981101-990331.With USAR Changes Other than Those Resulting from 10CFR50.59 ML20206G2641999-03-31031 March 1999 Performance Indicators Rept for Mar 1999 LIC-99-0034, Monthly Operating Rept for Mar 1999 for Fcs,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Fcs,Unit 1.With ML20205J8181999-02-28028 February 1999 Performance Indicators, for Feb 1999 LIC-99-0025, Monthly Operating Rept for Feb 1999 for Fort Calhoun Station,Unit 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Fort Calhoun Station,Unit 1.With ML20207F3291999-01-31031 January 1999 FCS Performance Indicators for Jan 1999 ML20203B0991998-12-31031 December 1998 Performance Indicators for Dec 1998 LIC-99-0026, 1998 Omaha Public Power District Annual Rept. with1998-12-31031 December 1998 1998 Omaha Public Power District Annual Rept. with LIC-99-0003, Monthly Operating Rept for Dec 1998 for Fort Calhoun Station.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Fort Calhoun Station.With ML20198S3771998-12-31031 December 1998 Safety Evaluation Supporting Amend 189 to License DPR-40 ML20198S4831998-12-31031 December 1998 Safety Evaluation Supporting Amend 188 to License DPR-40 ML20196G2251998-12-18018 December 1998 Rev 2 to EA-FC-90-082, Potential Over-Pressurization of Containment Penetration Piping Following Main Steam Line Break in Containment ML20198M3141998-11-30030 November 1998 Performance Indicators Rept for Nov 1998 LIC-98-0172, Monthly Operating Rept for Nov 1998 for Fort Calhoun Station,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Fort Calhoun Station,Unit 1.With LIC-98-0160, Special Rept:On 981113,MSL RM RM-064 Was Declared Inoperable Due to Leakage Past Isolation Valve HCV-922.Troubleshooting Has Indicated That Leakage Has Stopped & Cause of Leak Continues to Be Investigated1998-11-25025 November 1998 Special Rept:On 981113,MSL RM RM-064 Was Declared Inoperable Due to Leakage Past Isolation Valve HCV-922.Troubleshooting Has Indicated That Leakage Has Stopped & Cause of Leak Continues to Be Investigated ML20203B0721998-11-16016 November 1998 Rev 6 to HI-92828, Licensing Rept for Spent Fuel Storage Capacity Expansion ML20196E4981998-10-31031 October 1998 Performance Indicators Rept for Oct 1998 ML20196G2441998-10-31031 October 1998 Changes,Tests & Experiments Carried Out Without Prior Commission Approval. with USAR Changes Other than Those Resulting from 10CFR50.59 LIC-98-0154, Monthly Operating Rept for Oct 1998 for Fort Calhoun Station,Unit 1.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Fort Calhoun Station,Unit 1.With ML20154M4881998-10-19019 October 1998 Safety Evaluation Supporting Amend 186 to License DPR-40 ML20154N2411998-10-19019 October 1998 Safety Evaluation Supporting Amend 187 to License DPR-40 LIC-98-0136, Monthly Operating Rept for Sept 1998 for Fort Calhoun Station,Unit 1.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Fort Calhoun Station,Unit 1.With ML20155G4261998-09-30030 September 1998 Performance Indicators for Sept 1998 ML20154A1251998-08-31031 August 1998 Performance Indicators, Rept for Aug 1998 LIC-98-0122, Monthly Operating Rept for Aug 1998 for Fort Calhoun Station Unit 1.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Fort Calhoun Station Unit 1.With ML20238F7231998-08-17017 August 1998 Owner'S Rept for Isis ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency 1999-09-30
[Table view] |
Text
.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-285 UNIT Fort Calhoun #1 November 8, 1978 DATE
- COMPLETED BY B. J. Hi:kle TELEPHONE h02/536 kh13 October, 1978 MONRI DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net) (MWe-Neil
( 3 h37.h 37 0.0 0.0 2
437.1 gg h36.7 39 0.0 3
'h27.1 20
- 0. 0 4
425.3 0.0 3 21 2h.0 0.0 6 22 h22.5 23 0.O 7
h20.8 0. 0 g 34 h18. 8 O.O
, 25 h11.2 0.0 io 26 h07.9 0.0
( 33 27 h0h.0 0. 0 12 28 383.2 0. O 13 29 73 0. 0 ,
g4 30 0.0 0. 0 15 33 4.0 16 ,
INSTRUCTIONS On this forrnst. list the average daily unit power levelin MWe Net for each day in the reporting month.Compuie in the nearest whole megawatt.
f//,, b' /$/
R
- .- . - - .- w--- - #- - , --n --ww .%-,,--w c - . - - - - ~ p o- - y
~
OPERATING DATA REPORT .
1 DOCKET NO. 50-265 DATE November'8, 1978 COMPLETED BY ~B. J . Hickle TELEPHONE h02/536 Th13 OPERATING STATUS Fort Calhoun Notes
- 1. Unit Name: ~
October, 1976
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWt):
1420 502
- 4. Nameplate Ratin;(Gross 51We):
Y '
S. Design Electrical Rating (Net MWe): ,
01
- 6. )1aximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
S. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Report. Give Reasons:
N/A
- 9. Power Lesel To Which Restricted.lf Any (Net MWe): N /A
- 10. Reasons For Restrictions.lf Any: N/A This Month Yr to-Date Cumulatise 7h5 0 7,296.0 hh,713.0
- 11. Hours In Reporting Period 317.6 6,432.0 35,695.3
- 12. Number Of Ilours Reactor Was Critical
- 13. Reactor Reserve Shutdown flours 0.0 0.0 1.136.0
- 14. Hours Generator On-Line 315.2 6,403.7 34,887.6
- 0. 0 0.0 0.0
( 15. Unit Resene Shutdown Hours 420,284.0 8,872,237 9 41,534,760.2 .
- 16. Gross Thermal Energy Generated (MWH) 138,440.0 2,959.733.7 13,765,071.7
- 17. Gross Electrical Energy Generated (MWH) 131,121.1 2,613,750.6 12,985,719.6
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Senice Factor 42.3 87.8 78.0
- 20. Unit Availabili.y Factor 42.3 67.6 78.0
- 21. Unit Capaci!y I actor iUsing MDC Net) 36 5 64.5 64.2
- 22. Unit Capacity Factor (Using DER Net 1 38.5 84.4 63.6
- 23. Unit Forced Outage Rate 0.0 3.9 5.0
- 24. Shutdowns Scheduled Oser Next 6 Months (Type, Date.and Duration of Eacht:
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior o Commercial Operationi: Forecast Achieved P
INITIAL CRITICALITY INITIA L ELECTRICITY .
COMMERCIAL OPERATION ,
( 9/771
v 3
DOCKET NO. 50-285 -
UNIT SilUTUOWNS AND POWER REDUC 110NS UNIT NAME Fort Calbrm :21 DATE Nover-ber- t4 1o78 COMPLETED BY R- 7- U i ci- 1 r-REPORT MON 0 111 ctober,1978 1ELEP310NE 4 W O 3b '4'413
":.c c j1, Cause & Cusrectise
-, E_ g 3 $Y} Licensee E g, Action to
. No. Date g 3g s jge Event 37 po Prevent Recurrence H yE 5 3 a g =g Report a vi u ,
u Q
S h29 8 C 1 N/A N/A N/A N/A 78-Oh 78101h 3 4 I 2 Exhibit G-Instructions Reason: Method:
F: Forced for Preparation of Data A. Equipment Failure (Explain) 1-Manual S: Scheduled Entry Sheets for Licensee B-Maintenance or Test 2-Manual Scram.
3 Automatic Scram. Eveni Report (LER) File tNUREG.
C-Refueling 4 Other (Explain) 01611 D Regulatory Restriction E Operator Training & License Examination F Administrative Exhibit I- Same Source G Operational Error (Explain)
(9/77) Il Other (Explain)
Refueling InforTration ,
Ibrt Calhoun - Unit No.1 Report for the nonth ending October 31, 1978.
Scheduled date for next refueling shutdom. In Proaress 1.
December 1. 1978 2.' Scheduled date for restart following refueling.
Will refueling or restmption of operation thereafter 3.
require a technical siracification change or other Yes license anendTent?
- a. If answer is yes, W at, in general, will these be?
b .
- b. If answer is no, has the. reload fuel design and core configuration been reviewed by your Plant Safety Review Ccmittee to deter-mine whether any unreviewed safety questions are associated with the core reload.
- c. If no such review has taken place, d en is it scheduled?
- 4. Scheduled date(s) for submitting proposed licensing Submitted Aug. 4, 1978 action and support infonration.
- 5. Important licensing considerations associated with refueling, e.g., new or different fuel design or k
supplier, unreviewed design or performance analysis nethods, significant changes in fuel design, new operating procedures.
I 133 assen611es
- 6. The ntreber ?f fuel assenblies:b) a)in in the the spent core fuel pool 113 c) spent fuel pool "
storage capacity 483 d) planned spent fuel pool "
storage capacity 483
- 7. The projected date of the last refueling that can be 4 discharged to the spent fuel pool assuming the present 1985 licensed capacity.
November 3, 1978 Prepared by k h* Date
(
OMAHA P03LIC POWER DIS"7!ICT Fort Calhoun Station Unit No. 1 October 1978 Monthly Operations Report I. OPERATIONS
SUMMARY
Unit operation continued at a nomical 100% power until the second week of October when a gradual power reduction was initiated in preparation for core physics testir4 The physics testing was completed and the unit shutdown on October lh in preparation fo: a refueling outage.
Extensive maintenance operations continued throughout the re-( mainder of the month.
The radioactive vaste solidification modification preoperational test was initiated and vill- be completed when plant conditions allow.
An additional reactor operators license was issued to a member of the Fort Calhoun operations staff after successfully completing his examination by the Nuclear Regulaotry Commission on October 11, 12.
A. PERFORMANCE CHARACTERISTICS LER Uu=ber Deficiency 78-031 During nor=al steady state power operation the hot leg te=perature indicator for "D" channel vent to full scale. The re=aining
( three hot leg te=perature channels remained operable throughout this event.
!78-032 During the perfomance of Surveillance Test ST-ESF-5, Section F.1, the monthly AC sequencer timer test, timers SI-13 and CH-1B on sequencer S2-2 failed to time out within the prescribed limit. The timers were exercised and tested within specified limits.
- 3. CHANGES IN OPERATING METHODS Frocedure Change No. Title Reason for Change 36Bh OI-FP-6-Fire To update procedure to confom with Proh etion System recent additions of fire protection Inspection & Teqt equipment per Fire Protecticn SER i
!!cnthly Operations Report October 1978 Page Two C. RESULTS OF SERVEILLANCE TESTS AND INSPECTIONS Surveillance tests as required by the Technical Specifications Section 3 0 and Appendix B, were perfomed in accordance with the annual surveillance test schedule. The following is a-su=ary of the surveillance tests which resulted in Operations Incidents and are not reported elsewhere in the report:
Operations Incident # Deficienev OI 657 During the perfomance of ST-FP-2 F.2
( Steps 1 and 2 of the procedure were per-fomed out of sequence without prior PRC approval (procedure change) l The following are surveillance tests where an unusual result occurred
- Surveillance Test No. Descrintion ST-ESF-5 Run to detemine if timers were accurate D. CHAUGES, TESTS AND EXPERIMENTS CARRIED OUT *n'ITHOU"' C0!GIISSION APPROVAL
( Procedure Description SP-?AUD-1 Fuel Asse=bly Uplift Condition Detection.
Two loops showed greater than 995 assurance that more than 150 lbs. downward force exists on the fuel asse=bly. Core Ap transmitters on the other two loops gave erroneous readings and MO 20280 was prepared to repair instrument loops.
SP-VA-6 Charging Pu=p Room Temp. Rise Test / Test results .
satisfactory.
Monthly Operations Report October 1978 Page Three E. RESULTS OF LEAK RATE TESTS The Refueling Leak Rate Testing program was started this month and vill continue throughout the outage in accordance with ST-CONT-2 and 3 A follow up report vill be submitted within 90 days of the completion of the Leak Rate Testing Program conducted during the 1978 Refueling Outage.
ss F. CHANGES IU PLANT OPERATING STAFF Robert Luikens employed as Auxiliary Operator-Nuclear.
f G. TRAINING October training consisted of Radiation Protection refresher for most of the unrestricted and restricted personnel in preparation for the 1978 refueling outage. There was a large number of contract personnel that were give initial radiation protection instructions. Three hot license persoonel vere tested by the NRC and the R.O. candidate received a Reactor Operator license.
The two SRO upgrades are still pending.
H. CFJL'IGES, TESTO AND EXPERIMENTS REQUIRING NUCIrtR REGULATORY CO!GIISSION AUTHORIZATION PURSUANT TO 10CFR50 59 Modifications designated in URC safety evaluation report for fire protection progrs= at Fort Calhoun Station designated to be completed in October 1978 vere completed this ::onth.
Approved by Ottartf,uu. ( ail Manager-Fort Calhoun Station
M0nthly Cpe-ations Reper:
00tcber 1978
?sge Four
!!. MAO!~2"!A'!"I (Significan Safety Related)
X. O. p Cate i Descri tic Cerre: ive Action 18209 10/19/78 Inspe:: & adjust ac necessary fan Cc=pleted per MF-VA-7-1 blades en VA-70 18210 10/20/78 Inspect and adjust as ner.assary fer Cc=pleted per 2?-VA-7-1 blades en VA-7D 20h27 10/27/78 Cntter p'n =issing en Snubber S!S Replaced =issing cotter pin 122A 20hlh 10/23/78 Grease bearing in s=all hcok er polar Greased m:all book bearir g crane 175h3 10/16/78 3emove =issile shields C:=pleted per precedure 1800h 10/19/78 Re=0ve equip =ent hatch Cc=pleted per procedure 20!-k 10/25/78 EMO 50/51 change set points Returned to Contain=ent setpoints 20' ,
10/16/78 Repair seals on PAL decr Flu' fed inner door seal 18002 10/16/78 Annual pre-operations check en Polar Co=pleted per procedure crane 2C288 10/16/78 Magnaflux hocks en pclar crane C0=pleted 20367 10/18/78 PAL door repair inner locks Freed interlocks 197h9 8/29/78 Relocate fire hose cabinet Cenpleted 20522 11/1/78 C/122 H-1 Zero pot =alfunction Installed te=p. transmitter & cal.
20383 11/1/78 HCV 1388A,3 leaking Beverked valves and retested sat.
20053 11/1/78 D/112H reading full scale Installed new ETD 20h37 10/30/78 HCV-1108A repair and repack Repaired and repacked.
200ho 11/3/78 FIC-2890 and FIC-2891 Rav Water header Flev no::les cleaned and channels flov indicaters giving spurecus alar = recalibrated
"-4-- A 20372 10/21/78 C/ PIA-102X out of spec. ater span & checked.
20390 10/25/78 12-105 Signas stuck at 2h5 Calibrated locP & refilled ref les 20323 10/21/78 HCV-326 valve vill ne cperate via Cleaned crifice centroller 20' 10/23/78 CC 123 Wide Range Te=perature Calibrat ed indicater indic at es 100.0 degrees high 20273 10/18/78 Perfer: SF-CPTP-12 Cc=pleted 199h6 10/22/78 Security :ene d26 deer =alfunctiening Docr adjusted and inspected.
203hh 10/19/78 Weather Tower 110 meter 4T check and Checked and fcund ne proble=s.
calibrat e 20h0h 10/27/78 RMD-ci filter advance solencid broke Replaced solenoid advance =echanis:
20hh0 10/25/78 EMO-60 gas =eter inoperable Replace flev =eter & cleaned filters 18512 9/2'9/78 Fire Protection-jockey pu=p packing Installed ring of packing.
leak 20162 9/29/78 PAL Decr-failed leak test Fluffed seal A retested sat. ..
18578 10/2/78 Fire ?rctection-diesel fire pu=p hose Replaced gaskets leading fr== eil filter to bottc=
casing leaking.
20379 10/2h/78 FW-163 - Inspection only. Correct crientatien.
20378 10/2k/78 FW-16h - Inspection only. Wrong orientatics - MO 20h29 vritter to change crientation.
l t