ML20070R896

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Arc Strikes on Primary Containment Pipe Penetration Bellows.Initially Reported on 821123.Full Scale Facsimile Bellows Scheduled for Onsite Repair.Next Rept Will Be Sent by 830422
ML20070R896
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 12/23/1982
From: Wells D
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, EF2-61207, NUDOCS 8302040074
Download: ML20070R896 (2)


Text

.

r Donald A. Wells Manager Ouanty Assurance (313) 237 9657 2000 Second Avenue f3 3-Decmber 23, 1982 EF2-61207 Mr. James G. Keppler, Regional Adninistrator Region III U.S. Nuclear Regulatory Ccmnission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Subject:

Interim Report of Potential 10CFR50.55(e) Its on Arc Strike on Primary Containment Pipe Penetration Bellows (#81)

Dear Mr. Keppler:

On Nov mber 23, 1982, Detroit Edison's Mr. D. Ferencz, Acting Supervisor -

Construction Quality Assurance, telephoned Mr. H. Wescott of NRC Region III, to report on a potential problem with arc strikes on the prizrary containment pipe penetration bellows at the Fermi 2 site.

The arc strikes are between 1/8" and 3/16" in diameter on the outer ply.

The bellows consists of two (2) plys, each with a wall thickness of.031",

and are separated with a stainless steel mesh approxirrately 1/16" thick. A visr:1 examination established that the outer ply is perforated in one instance without damage to the steel mesh. The inner ply is not damaged, but will be checked by means of a boroscope to verify that there is no dis-coloration of the internal surface.

A full-scale facsimile bellows is scheduled to be on site soon so that the repair, in accordance with code case N-315, can begin.

Another report on this itm, either interim or final, is scheduled to be sent on or before April 22, 1983. If you have questions concerning this matter, please contact Mr. G.M. Trahey, Assistant Director - Project Quality Assurance.

Very truly yours, b

W j

l DAW /DF/WRW/pn 83020400/4 821223 PDR ADOCK 05000341 JAN 31 1983 S

PDR f/.

4')

Mr. James G. Keppler, Regional Mninistrator Decenber 23, 1982 EF2-61207 Page M cc: Mr. Richard DeYoung, Director Office of Inspection and Erforcement U.S. Nuclear Regulatory Comission Washington, D.C.

20555 Mr. Bruce Little, Senior Resident Inspector U.S. Nuclear Regulatory Comnission 6450 North Dixie Highway Newport, Michigan 48166 r

I I

  • - =