Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217N4261999-10-25025 October 1999 Forwards Amend 17 to License DPR-9 & Safety Evaluation. Amend Revises TS by Deleting SR D.3.c,which Required Weekly Observation of Nitrogen Cover Gas Pressure within Sodium Storage Tanks Located in Sodium Building NRC-99-0085, Forwards Rev 15 to Fermi 2 Security Personnel Training & Qualification Plan, IAW 10CFR50.54(p)(2).Without Encl1999-10-22022 October 1999 Forwards Rev 15 to Fermi 2 Security Personnel Training & Qualification Plan, IAW 10CFR50.54(p)(2).Without Encl NRC-99-0094, Forwards Safeguards Event Rept 99-S01-00 for Reportable Event That Occurred on 990922.Commitments Made by Util Listed1999-10-22022 October 1999 Forwards Safeguards Event Rept 99-S01-00 for Reportable Event That Occurred on 990922.Commitments Made by Util Listed ML20217P1661999-10-21021 October 1999 Forwards Insp Rept 50-341/99-17 on 990927-1005.No Violations Noted ML20217M0771999-10-19019 October 1999 Confirms Discussion Between GL Shear,M Mitchell,E Kosky, D Williams,B Rumins,D Harmon & W Rutenberg in Public Meeting on 990923.Purpose of Meeting Was to Discuss Current Status RP Program at Enrico Fermi 2 ML20217N9231999-10-15015 October 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 40 ML20217E5671999-10-14014 October 1999 First Partial Response to FOIA Request for Documents.Records in App a Already Available in Pdr.App B Records Encl & Being Released in Entirety NRC-99-0087, Responds to NRC Re Violations Noted in Insp Rept 50-341/99-10.Licensee Contests Subject Violation,Due to Listed Reasons1999-10-12012 October 1999 Responds to NRC Re Violations Noted in Insp Rept 50-341/99-10.Licensee Contests Subject Violation,Due to Listed Reasons NRC-99-0083, Submits Requested Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal1999-10-0707 October 1999 Submits Requested Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal ML20217D5331999-10-0707 October 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 39 ML20217F5931999-10-0707 October 1999 Forwards Insp Rept 50-341/99-11 on 990724-0908.Two Violations Re Failure to Follow Procedures While Sampling Standby Liquid Control Tank & Wear Dosimetry Properly Being Treated as Noncited Violations ML20217B8261999-10-0404 October 1999 Forwards Summary of Decommissioning Insp Plan for Fy 2000. Plan Will Be Updated Annually & May Be Revised at Any Time Based Upon Future Insp Findings,Events & Resource Availability ML20212J8121999-10-0101 October 1999 Discusses Plant,Unit 2 Completion of Licensing Action for GL 98-01 & Suppl 1, Y2K Readiness of Computer Sys at Npps. Ack Efforts That Licensee Have Completed to Date in Preparing Plant for Y2K Transition ML20212K8881999-09-30030 September 1999 Refers to 990928 Meeting Conducted at Fermi Unit 2 to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PSA Staff ML20217A3261999-09-30030 September 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 38 NRC-99-0091, Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations1999-09-27027 September 1999 Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations ML20212J8331999-09-27027 September 1999 Responds to Licensee 990924 Request That NRC Exercise Discretion Not to Enforce Compliance with Actions Required in TS 3/4.6.1.8.Ltr Documents 990923 Telcon with Util in Which NRC Orally Issued NOED ML20216G9791999-09-24024 September 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 37 NRC-99-0092, Documents Util Request for Enforcement Discretion with Respect to Requirements of TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys1999-09-24024 September 1999 Documents Util Request for Enforcement Discretion with Respect to Requirements of TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys ML20216H3561999-09-23023 September 1999 Informs That During 990914 Telcon,L Sanders & M Bielby Made Arrangements with NRC to Inspect Licensed Operator Requalification Program at Fermi Nuclear Station for Week of 991129 Which Coincides with Util Regularly Scheduled Exam ML20216H4541999-09-23023 September 1999 Informs That During 990914 Telcon L Sanders & M Bielby Made Arrangements for Administration of Licensing Exams at Fermi Nuclear Station for Week of Jan 31,2000.NRC Will Make Exam Validation Visit to Facility During Week of Jan 10,2000 ML20212F3241999-09-20020 September 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 36 NRC-99-0081, Submits Eight Relief Requests Associated with Containment Inservice Exam Program for Fermi 2 Plant,Per Provisions of 10CFR50.55a(g)(5)(iv).Requested Relief Does Not Adversely Affect Health & Safety of Public1999-09-17017 September 1999 Submits Eight Relief Requests Associated with Containment Inservice Exam Program for Fermi 2 Plant,Per Provisions of 10CFR50.55a(g)(5)(iv).Requested Relief Does Not Adversely Affect Health & Safety of Public ML20217A9421999-09-0909 September 1999 Informs That NRC Plan to Conduct Addl Resident Insps Beyond Core Insp Program Over Next 6 Months to Assess Improvements in Areas of Procedural Compliance & Quality of Work. Historical Listing of Plant Issues Encl NRC-99-0079, Forwards Rev 15 to Fermi 2 ITS Submittal,Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev1999-09-0808 September 1999 Forwards Rev 15 to Fermi 2 ITS Submittal,Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev ML20211Q0991999-09-0303 September 1999 Forwards Rev 35 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section) NRC-99-0090, Forwards Proprietary Operator License Renewal Application, NRC Forms 398 & 396 for SW Burt,License SOP-30199-3. Proprietary Encls Withheld1999-09-0303 September 1999 Forwards Proprietary Operator License Renewal Application, NRC Forms 398 & 396 for SW Burt,License SOP-30199-3. Proprietary Encls Withheld NRC-99-0066, Forwards semi-annual fitness-for-duty Rept for Fermi 2 for Period of 990101-0630,IAW 10CFR26.71(d)1999-08-30030 August 1999 Forwards semi-annual fitness-for-duty Rept for Fermi 2 for Period of 990101-0630,IAW 10CFR26.71(d) ML20211G4951999-08-24024 August 1999 Forwards Rev 34 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section) NRC-99-0055, Forwards Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval, Per Provisions of 10CFR50.55a(f)(5)(iv).Rev Includes Four Pump Relief Requests & Ten Valve Relief Requests Requiring NRC Approval1999-08-19019 August 1999 Forwards Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval, Per Provisions of 10CFR50.55a(f)(5)(iv).Rev Includes Four Pump Relief Requests & Ten Valve Relief Requests Requiring NRC Approval IR 05000341/19990131999-08-19019 August 1999 Discusses Insp Rept 50-341/99-13 & OI Rept 3-98-039 Conducted Into Potential Misconduct of Operator Formerly Employed by De.Nrc Determined That Violation of NRC Regulations Occurred.Synopsis of IO Rept Encl NRC-99-0056, Forwards Rev 2,change 0 to ISI-Nondestructive Exam (ISI-NDE) Program (Plan) for Piping,Components & Integral Attachments, for Second ten-year Interval of Fermi 2 Plant Operation1999-08-19019 August 1999 Forwards Rev 2,change 0 to ISI-Nondestructive Exam (ISI-NDE) Program (Plan) for Piping,Components & Integral Attachments, for Second ten-year Interval of Fermi 2 Plant Operation ML20211C0521999-08-17017 August 1999 Forwards Tables for Sections 3.6 & 3.7 of Draft Safety Evaluation of Proposed Conversion of Current TS to Improved Standard TS NRC-99-0089, Forwards Rev 13 to Fermi 2 ITS Submittal Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev1999-08-17017 August 1999 Forwards Rev 13 to Fermi 2 ITS Submittal Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev ML20217E6181999-08-13013 August 1999 FOIA Request for Documents Re Implementing Regulations in 10CFR & Requesting That Region III Task Interface Agreement (TIA) Related to Fermi 2 Plant Be Made Available IR 05000341/19990011999-08-10010 August 1999 Forwards Insp Rept 50-341/99-01 on 990619-0723 & Nov. Violation of Concern Because Operators Did Not Understand License Requirements & Placed Plant in Configuration Where EDG 11 Was Removed from Service IR 05000341/19990121999-08-0606 August 1999 Forwards Insp Rept 50-341/99-12 on 990712-0716.No Violations Noted.Insp Focused on Implementation of Plant Chemistry & Radiological Environ Monitoring Programs & Operation of post-accident Sampling Sys ML20211C4761999-08-0606 August 1999 Forwards Draft Safety Evaluation Re Proposed Conversion of Current TS to Improved Standard TS NRC-99-0057, Forwards Rev 12 to ITS 980403 Submittal,Providing Update to Submittal for ITS Section 3.3,including Changes Associated with NRC Review of Rev 6 ITS1999-08-0404 August 1999 Forwards Rev 12 to ITS 980403 Submittal,Providing Update to Submittal for ITS Section 3.3,including Changes Associated with NRC Review of Rev 6 ITS ML20210N5451999-08-0303 August 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 33 NRC-99-0077, Forwards Rev 11 to Fermi ITS Submittal,Dtd 980403,providing Update to Submittal for ITS Sections 3.5,3.6 & 3.8.Update Includes Changes Associated with NRC Review of Util Transmittals of Revs 5,5a & 7 to ITS1999-07-26026 July 1999 Forwards Rev 11 to Fermi ITS Submittal,Dtd 980403,providing Update to Submittal for ITS Sections 3.5,3.6 & 3.8.Update Includes Changes Associated with NRC Review of Util Transmittals of Revs 5,5a & 7 to ITS ML20210J2121999-07-23023 July 1999 Discusses NRC OI Investigation Rept 3-98-039 Completed on 990524 & Forwards Notice of Violation NRC-99-0053, Forwards Rev 14 to Fermi 2 Security Personnel Training & Qualification Plan, Per 10CFR50.54(p)(2).Changes Do Not Decrease Effectiveness of Plan.Summary of Changes Also Encl1999-07-15015 July 1999 Forwards Rev 14 to Fermi 2 Security Personnel Training & Qualification Plan, Per 10CFR50.54(p)(2).Changes Do Not Decrease Effectiveness of Plan.Summary of Changes Also Encl ML20209H7211999-07-14014 July 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 32 NRC-99-0054, Forwards Rev 10 to Fermi 2 ITS Submittal, , Providing Update to Submittal for ITS Section 3.4,RCS.Update Includes Changes Associated with NRC Review of Util Transmittal of Rev 4 to ITS Submittal1999-07-13013 July 1999 Forwards Rev 10 to Fermi 2 ITS Submittal, , Providing Update to Submittal for ITS Section 3.4,RCS.Update Includes Changes Associated with NRC Review of Util Transmittal of Rev 4 to ITS Submittal ML20209F6571999-07-12012 July 1999 Forwards Insp Rept 50-341/99-09 on 990516-0618.No Violations Noted.Weak Procedural Guidance,Communications Issues & Configuration Control Weaknessess Were Evident NRC-99-0052, Forwards Rev 9 to Fermi 2 ITS Submittal,Dtd 980403. Attachment 1 Contains Brief Abstract of Changes Included in Rev.Attachment 2 Contains Revised Pages for Submittal Along with Rev Instructions1999-07-0707 July 1999 Forwards Rev 9 to Fermi 2 ITS Submittal,Dtd 980403. Attachment 1 Contains Brief Abstract of Changes Included in Rev.Attachment 2 Contains Revised Pages for Submittal Along with Rev Instructions ML20196J5511999-07-0202 July 1999 Discusses GL 92-01,Rev 1,Supp 1, Rv Integrity, Issued by NRC on 950519 & DE Responses & 980729 for Fermi 2.Informs That Staff Revised Info in Rvid & Released Info as Rvid Version 2 as Result of Review of Responses ML20209C6141999-07-0101 July 1999 Rev 31 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section) NRC-99-0076, Forwards Rev 8 to ITS Submittal to Provide Update to ITS Submittal for ITS Section 3.7.Brief Abstract of Changes Included1999-06-30030 June 1999 Forwards Rev 8 to ITS Submittal to Provide Update to ITS Submittal for ITS Section 3.7.Brief Abstract of Changes Included 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARNRC-99-0094, Forwards Safeguards Event Rept 99-S01-00 for Reportable Event That Occurred on 990922.Commitments Made by Util Listed1999-10-22022 October 1999 Forwards Safeguards Event Rept 99-S01-00 for Reportable Event That Occurred on 990922.Commitments Made by Util Listed NRC-99-0085, Forwards Rev 15 to Fermi 2 Security Personnel Training & Qualification Plan, IAW 10CFR50.54(p)(2).Without Encl1999-10-22022 October 1999 Forwards Rev 15 to Fermi 2 Security Personnel Training & Qualification Plan, IAW 10CFR50.54(p)(2).Without Encl ML20217N9231999-10-15015 October 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 40 NRC-99-0087, Responds to NRC Re Violations Noted in Insp Rept 50-341/99-10.Licensee Contests Subject Violation,Due to Listed Reasons1999-10-12012 October 1999 Responds to NRC Re Violations Noted in Insp Rept 50-341/99-10.Licensee Contests Subject Violation,Due to Listed Reasons NRC-99-0083, Submits Requested Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal1999-10-0707 October 1999 Submits Requested Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal ML20217D5331999-10-0707 October 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 39 ML20217A3261999-09-30030 September 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 38 NRC-99-0091, Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations1999-09-27027 September 1999 Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations ML20216G9791999-09-24024 September 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 37 NRC-99-0092, Documents Util Request for Enforcement Discretion with Respect to Requirements of TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys1999-09-24024 September 1999 Documents Util Request for Enforcement Discretion with Respect to Requirements of TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys ML20212F3241999-09-20020 September 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 36 NRC-99-0081, Submits Eight Relief Requests Associated with Containment Inservice Exam Program for Fermi 2 Plant,Per Provisions of 10CFR50.55a(g)(5)(iv).Requested Relief Does Not Adversely Affect Health & Safety of Public1999-09-17017 September 1999 Submits Eight Relief Requests Associated with Containment Inservice Exam Program for Fermi 2 Plant,Per Provisions of 10CFR50.55a(g)(5)(iv).Requested Relief Does Not Adversely Affect Health & Safety of Public NRC-99-0079, Forwards Rev 15 to Fermi 2 ITS Submittal,Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev1999-09-0808 September 1999 Forwards Rev 15 to Fermi 2 ITS Submittal,Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev NRC-99-0090, Forwards Proprietary Operator License Renewal Application, NRC Forms 398 & 396 for SW Burt,License SOP-30199-3. Proprietary Encls Withheld1999-09-0303 September 1999 Forwards Proprietary Operator License Renewal Application, NRC Forms 398 & 396 for SW Burt,License SOP-30199-3. Proprietary Encls Withheld ML20211Q0991999-09-0303 September 1999 Forwards Rev 35 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section) NRC-99-0066, Forwards semi-annual fitness-for-duty Rept for Fermi 2 for Period of 990101-0630,IAW 10CFR26.71(d)1999-08-30030 August 1999 Forwards semi-annual fitness-for-duty Rept for Fermi 2 for Period of 990101-0630,IAW 10CFR26.71(d) ML20211G4951999-08-24024 August 1999 Forwards Rev 34 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section) NRC-99-0056, Forwards Rev 2,change 0 to ISI-Nondestructive Exam (ISI-NDE) Program (Plan) for Piping,Components & Integral Attachments, for Second ten-year Interval of Fermi 2 Plant Operation1999-08-19019 August 1999 Forwards Rev 2,change 0 to ISI-Nondestructive Exam (ISI-NDE) Program (Plan) for Piping,Components & Integral Attachments, for Second ten-year Interval of Fermi 2 Plant Operation NRC-99-0055, Forwards Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval, Per Provisions of 10CFR50.55a(f)(5)(iv).Rev Includes Four Pump Relief Requests & Ten Valve Relief Requests Requiring NRC Approval1999-08-19019 August 1999 Forwards Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval, Per Provisions of 10CFR50.55a(f)(5)(iv).Rev Includes Four Pump Relief Requests & Ten Valve Relief Requests Requiring NRC Approval NRC-99-0089, Forwards Rev 13 to Fermi 2 ITS Submittal Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev1999-08-17017 August 1999 Forwards Rev 13 to Fermi 2 ITS Submittal Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev ML20217E6181999-08-13013 August 1999 FOIA Request for Documents Re Implementing Regulations in 10CFR & Requesting That Region III Task Interface Agreement (TIA) Related to Fermi 2 Plant Be Made Available NRC-99-0057, Forwards Rev 12 to ITS 980403 Submittal,Providing Update to Submittal for ITS Section 3.3,including Changes Associated with NRC Review of Rev 6 ITS1999-08-0404 August 1999 Forwards Rev 12 to ITS 980403 Submittal,Providing Update to Submittal for ITS Section 3.3,including Changes Associated with NRC Review of Rev 6 ITS ML20210N5451999-08-0303 August 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 33 NRC-99-0077, Forwards Rev 11 to Fermi ITS Submittal,Dtd 980403,providing Update to Submittal for ITS Sections 3.5,3.6 & 3.8.Update Includes Changes Associated with NRC Review of Util Transmittals of Revs 5,5a & 7 to ITS1999-07-26026 July 1999 Forwards Rev 11 to Fermi ITS Submittal,Dtd 980403,providing Update to Submittal for ITS Sections 3.5,3.6 & 3.8.Update Includes Changes Associated with NRC Review of Util Transmittals of Revs 5,5a & 7 to ITS NRC-99-0053, Forwards Rev 14 to Fermi 2 Security Personnel Training & Qualification Plan, Per 10CFR50.54(p)(2).Changes Do Not Decrease Effectiveness of Plan.Summary of Changes Also Encl1999-07-15015 July 1999 Forwards Rev 14 to Fermi 2 Security Personnel Training & Qualification Plan, Per 10CFR50.54(p)(2).Changes Do Not Decrease Effectiveness of Plan.Summary of Changes Also Encl ML20209H7211999-07-14014 July 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 32 NRC-99-0054, Forwards Rev 10 to Fermi 2 ITS Submittal, , Providing Update to Submittal for ITS Section 3.4,RCS.Update Includes Changes Associated with NRC Review of Util Transmittal of Rev 4 to ITS Submittal1999-07-13013 July 1999 Forwards Rev 10 to Fermi 2 ITS Submittal, , Providing Update to Submittal for ITS Section 3.4,RCS.Update Includes Changes Associated with NRC Review of Util Transmittal of Rev 4 to ITS Submittal NRC-99-0052, Forwards Rev 9 to Fermi 2 ITS Submittal,Dtd 980403. Attachment 1 Contains Brief Abstract of Changes Included in Rev.Attachment 2 Contains Revised Pages for Submittal Along with Rev Instructions1999-07-0707 July 1999 Forwards Rev 9 to Fermi 2 ITS Submittal,Dtd 980403. Attachment 1 Contains Brief Abstract of Changes Included in Rev.Attachment 2 Contains Revised Pages for Submittal Along with Rev Instructions ML20209C6141999-07-0101 July 1999 Rev 31 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section) NRC-99-0049, Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Disclosure Encl1999-06-30030 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Disclosure Encl NRC-99-0076, Forwards Rev 8 to ITS Submittal to Provide Update to ITS Submittal for ITS Section 3.7.Brief Abstract of Changes Included1999-06-30030 June 1999 Forwards Rev 8 to ITS Submittal to Provide Update to ITS Submittal for ITS Section 3.7.Brief Abstract of Changes Included ML20209C1081999-06-29029 June 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 30 NRC-99-0050, Forwards Rev 7 to ITS Submittal of 980403,to Provide Remaining Responses to NRC RAIs Re ITS Sections 3.5 & 3.8. Revision Instructions Included1999-06-24024 June 1999 Forwards Rev 7 to ITS Submittal of 980403,to Provide Remaining Responses to NRC RAIs Re ITS Sections 3.5 & 3.8. Revision Instructions Included NRC-99-0075, Forwards Operator License Renewal Application,Nrc Forms 398 & 396 for CR Effan,License SOP-30186-3.Encl Withheld1999-06-22022 June 1999 Forwards Operator License Renewal Application,Nrc Forms 398 & 396 for CR Effan,License SOP-30186-3.Encl Withheld ML20212J3861999-06-18018 June 1999 Forwards Rev 29 to Approved UFSAR LCR That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section) NRC-99-0047, Responds to NRC 990513 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions. Revised Design Calculation DC-5957, GL 96-06 Calculations, Encl1999-06-0909 June 1999 Responds to NRC 990513 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions. Revised Design Calculation DC-5957, GL 96-06 Calculations, Encl ML20195G2001999-06-0808 June 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy & Approved TRM Lcrs (Sorted by Section), Rev 28 ML20195E7391999-06-0303 June 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy & Approved TRM Lcrs (Sorted by Section), Rev 27 NRC-99-0046, Forwards Rev 6 to Fermi 2 ITS Submittal ,to Provide Remaining Responses to NRC RAI Re ITS Section 3.3, & Update ITS Submittal to Reflect Responses.Brief Abstract of Changes Contained in Attachment 11999-06-0202 June 1999 Forwards Rev 6 to Fermi 2 ITS Submittal ,to Provide Remaining Responses to NRC RAI Re ITS Section 3.3, & Update ITS Submittal to Reflect Responses.Brief Abstract of Changes Contained in Attachment 1 ML20207D9631999-05-26026 May 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy & Approved TRM Lcrs (Sorted by Section) ML20195B3381999-05-19019 May 1999 Forwards Rev 25 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy & Approved TRM Lcrs (Sorted by Section) NRC-99-0040, Requests NRC Approval of Revs to Weld Tables of Encl Relief Requests RR-A21,rev 1 & RR-A22,rev 1.Revs Do Not Impact Basis for Original Requests for Relief Because There Is No Change to Technical Basis or Proposed Alternative1999-05-14014 May 1999 Requests NRC Approval of Revs to Weld Tables of Encl Relief Requests RR-A21,rev 1 & RR-A22,rev 1.Revs Do Not Impact Basis for Original Requests for Relief Because There Is No Change to Technical Basis or Proposed Alternative NRC-99-0039, Requests Relief from ASME Section XI Requirement to Examine Essentially 100% of Selected Category B-J Pipe Welds,Per 10CFR50.55a(g)(5)(iii).Relief Request RR-A23,encl1999-05-14014 May 1999 Requests Relief from ASME Section XI Requirement to Examine Essentially 100% of Selected Category B-J Pipe Welds,Per 10CFR50.55a(g)(5)(iii).Relief Request RR-A23,encl NRC-99-0041, Requests Relief from ASME Section XI Requirements to Examine Essentially 100% of Accessible Category B-D Nozzle Welds,Per 10CFR50.55a(g)(5)(iii).Rev 1 to Relief Request RR-A6,encl1999-05-14014 May 1999 Requests Relief from ASME Section XI Requirements to Examine Essentially 100% of Accessible Category B-D Nozzle Welds,Per 10CFR50.55a(g)(5)(iii).Rev 1 to Relief Request RR-A6,encl NRC-99-0038, Requests Relief from ASME Section XI 1980 Requirement to Examine Essentially 100% If Category B-A RPV Shell Weld Lengths,Per 10CFR50.55a(g)(5)(iii)1999-05-14014 May 1999 Requests Relief from ASME Section XI 1980 Requirement to Examine Essentially 100% If Category B-A RPV Shell Weld Lengths,Per 10CFR50.55a(g)(5)(iii) NRC-99-0045, Forwards Rev 5a to Fermi 980403 Submittal,Converting TS to Its.Encl Rev Provides Remaining Responses to NRC RAIs Re ITS Section 3.6 Contained in NRC 990211 Rai.Brief Abstract of Changes & Responses to Rai,Encl1999-05-0707 May 1999 Forwards Rev 5a to Fermi 980403 Submittal,Converting TS to Its.Encl Rev Provides Remaining Responses to NRC RAIs Re ITS Section 3.6 Contained in NRC 990211 Rai.Brief Abstract of Changes & Responses to Rai,Encl NRC-99-0044, Forwards Rev 5 to ITS to Provide Responses to RAI Re ITS Section 3.6 (Except ITS Section 3.6.1.3) Contained in & Update in ITS Submittal to Reflect Responses1999-04-30030 April 1999 Forwards Rev 5 to ITS to Provide Responses to RAI Re ITS Section 3.6 (Except ITS Section 3.6.1.3) Contained in & Update in ITS Submittal to Reflect Responses NRC-99-0059, Provides Notification Required by 10CFR50.82(a)(7) of Changes to Fermi 1 Decommissioning Cost Estimate1999-04-29029 April 1999 Provides Notification Required by 10CFR50.82(a)(7) of Changes to Fermi 1 Decommissioning Cost Estimate ML20206E2941999-04-28028 April 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy & Approved TRM Lcrs (Sorted by Section), Rev 24 NRC-99-0037, Forwards Rev 9 to Fermi 2 Ufsar,Per 10CFR50.71(e) & 10CFR50.4(b)(6).Summary of Changes to QA Program & Vol 1 of Technical Requirements Manual,Encl1999-04-26026 April 1999 Forwards Rev 9 to Fermi 2 Ufsar,Per 10CFR50.71(e) & 10CFR50.4(b)(6).Summary of Changes to QA Program & Vol 1 of Technical Requirements Manual,Encl 1999-09-08
[Table view] Category:UTILITY TO NRC
MONTHYEARNRC-90-0142, Forwards Revised Semiannual Fitness for Duty Rept,Consisting of Statement Re Percentage of Individuals Tested & Revised Graph,Per G Pirtle Request1990-09-0707 September 1990 Forwards Revised Semiannual Fitness for Duty Rept,Consisting of Statement Re Percentage of Individuals Tested & Revised Graph,Per G Pirtle Request NRC-90-0152, Forwards Rev 3 to Radiological Emergency Response Preparedness Plan.W/O Encl1990-09-0505 September 1990 Forwards Rev 3 to Radiological Emergency Response Preparedness Plan.W/O Encl NRC-90-0139, Responds to NRC Re Memorization of Immediate Operator Actions in Abnormal Operating Procedures (Aop). Definition of Immediate Action Under Review to Provide Mechanism for Consistent Application to All AOPs1990-08-31031 August 1990 Responds to NRC Re Memorization of Immediate Operator Actions in Abnormal Operating Procedures (Aop). Definition of Immediate Action Under Review to Provide Mechanism for Consistent Application to All AOPs NRC-90-0116, Forwards Semiannual Fitness for Duty Rept1990-08-29029 August 1990 Forwards Semiannual Fitness for Duty Rept NRC-90-0117, Forwards, Fermi 2 Nuclear Power Plant Semiannual Radioactive Effluent Release Rept for Jan-June 1990. No Releases Occurred1990-08-28028 August 1990 Forwards, Fermi 2 Nuclear Power Plant Semiannual Radioactive Effluent Release Rept for Jan-June 1990. No Releases Occurred NRC-90-0118, Forwards Endorsement 35 to Maelu Policy MF-120 & Endorsement 139 to Nelia Policy NF-921990-08-24024 August 1990 Forwards Endorsement 35 to Maelu Policy MF-120 & Endorsement 139 to Nelia Policy NF-92 NRC-90-0135, Affirms That Util Intends to Conduct Insp of Low Pressure Turbine Rotor Disks During Upcoming Refueling Outage.Insp of Low Pressure Turbine 2 Carried Out During First Refueling Outage.No Evidence of Stress Corrosion Found1990-08-17017 August 1990 Affirms That Util Intends to Conduct Insp of Low Pressure Turbine Rotor Disks During Upcoming Refueling Outage.Insp of Low Pressure Turbine 2 Carried Out During First Refueling Outage.No Evidence of Stress Corrosion Found NRC-90-0137, Forwards NPDES Permit MI0037028 for Plant,Approved by State of Mi Water Resources Commission During 900719 Meeting1990-08-17017 August 1990 Forwards NPDES Permit MI0037028 for Plant,Approved by State of Mi Water Resources Commission During 900719 Meeting NRC-90-0136, Requests That NRC Administer Operator Licensing Exam in Dec 1990 & Postpone Operator Requalification Exam1990-08-17017 August 1990 Requests That NRC Administer Operator Licensing Exam in Dec 1990 & Postpone Operator Requalification Exam NRC-90-0133, Forwards Rev 5 to Security Personnel Training & Qualification Plan.Rev Establishes App D & Records Retention Matrix to Provide Central Location in Plan for Info on Records Retention Pages 3-4,3-8 & 3-9.Rev Withheld1990-08-0909 August 1990 Forwards Rev 5 to Security Personnel Training & Qualification Plan.Rev Establishes App D & Records Retention Matrix to Provide Central Location in Plan for Info on Records Retention Pages 3-4,3-8 & 3-9.Rev Withheld NRC-90-0112, Responds to NRC Re Violations Noted in Insp Rept 50-341/90-07.Corrective Actions:Review of RF01 Turbine Work Packages to Identify Where Addl Controls Should Be Placed in Similar Future RF02 Packages Conducted1990-08-0303 August 1990 Responds to NRC Re Violations Noted in Insp Rept 50-341/90-07.Corrective Actions:Review of RF01 Turbine Work Packages to Identify Where Addl Controls Should Be Placed in Similar Future RF02 Packages Conducted NRC-90-0111, Responds to Concerns Re Open Item 90-007-04,per NRC 900627 Request.Potential Enhancements to Drawings Being Reviewed & to Be Resolved by Dec 19901990-08-0303 August 1990 Responds to Concerns Re Open Item 90-007-04,per NRC 900627 Request.Potential Enhancements to Drawings Being Reviewed & to Be Resolved by Dec 1990 ML20055H8921990-07-26026 July 1990 Forwards Certification of Financial Assurance for Decommissioning of Facility,Per 10CFR50.33(k) & 50.75. Util Intends to Retain Unit 1 in Safe Storage Status Until Unit 2 Shut Down & Decommissioned NRC-90-0131, Forwards Rev 15 to Physical Security Plan.Rev Withheld1990-07-24024 July 1990 Forwards Rev 15 to Physical Security Plan.Rev Withheld NRC-90-0108, Discusses Deletion of Commitment for Temporary Mod Program, Per Insp Rept 50-341/84-25.Requirement for Operations Engineer to Approve Extensions of Temporary Mods Beyond 30 Days Being Deleted from Procedure FIP-OP1-021990-07-18018 July 1990 Discusses Deletion of Commitment for Temporary Mod Program, Per Insp Rept 50-341/84-25.Requirement for Operations Engineer to Approve Extensions of Temporary Mods Beyond 30 Days Being Deleted from Procedure FIP-OP1-02 NRC-90-0093, Submits Clarification of Design for Plant Suppression Pool Temp Monitoring Sys.Design Adequate to Ensure Suppression Pool Water Temp within Allowable Tech Spec Limits1990-07-18018 July 1990 Submits Clarification of Design for Plant Suppression Pool Temp Monitoring Sys.Design Adequate to Ensure Suppression Pool Water Temp within Allowable Tech Spec Limits NRC-90-0091, Requests Relief from Commitment to Perform 100% Audits of Tech Spec Line Items.Tech Spec Improvement Program Has Been Completed Which Provides Extensive Review of Tech Spec Line Items1990-07-0202 July 1990 Requests Relief from Commitment to Perform 100% Audits of Tech Spec Line Items.Tech Spec Improvement Program Has Been Completed Which Provides Extensive Review of Tech Spec Line Items NRC-90-0101, Responds to Generic Ltr 90-04, Request for Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions. Table Listing Status for Each Issue Encl1990-06-29029 June 1990 Responds to Generic Ltr 90-04, Request for Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions. Table Listing Status for Each Issue Encl NRC-90-0100, Discusses Installation of Motor Operated Valve Limiter Plates,Per IE Bulletin 85-003.Commitment to Install Limiter Plates Deferred Until Time When Valve or Valve Operator Would Be Disassembled for Another Reason1990-06-27027 June 1990 Discusses Installation of Motor Operated Valve Limiter Plates,Per IE Bulletin 85-003.Commitment to Install Limiter Plates Deferred Until Time When Valve or Valve Operator Would Be Disassembled for Another Reason NRC-90-0088, Discusses Changes Made to Commitment Addressing Calibr Frequency for Inservice Test Instrumentation,Per Violation 87009-03.Nine-month Calibr Frequency for Subj Instrumentation No Longer Appropriate or in Use1990-06-14014 June 1990 Discusses Changes Made to Commitment Addressing Calibr Frequency for Inservice Test Instrumentation,Per Violation 87009-03.Nine-month Calibr Frequency for Subj Instrumentation No Longer Appropriate or in Use NRC-90-0095, Provides Schedule for Implementation of Mods Re Compliance W/Reg Guide 1.97,Rev 2,per 900502 Request1990-06-0606 June 1990 Provides Schedule for Implementation of Mods Re Compliance W/Reg Guide 1.97,Rev 2,per 900502 Request NRC-90-0089, Submits Supplemental Response to NRC Concerns on RHR Operability from Insp Rept 50-341/89-17.Util Faced W/ Decision to Provide Addl Overheating Protection to RHR Sys Pump Vs Maintaining Necessary Water Coverage of Fuel1990-06-0404 June 1990 Submits Supplemental Response to NRC Concerns on RHR Operability from Insp Rept 50-341/89-17.Util Faced W/ Decision to Provide Addl Overheating Protection to RHR Sys Pump Vs Maintaining Necessary Water Coverage of Fuel NRC-90-0085, Provides Plans for Eliminating Temporaary Mods at Plant,Per Insp Rept 50-341/90-051990-05-29029 May 1990 Provides Plans for Eliminating Temporaary Mods at Plant,Per Insp Rept 50-341/90-05 NRC-90-0074, Discusses Insp of Flash Tanks & Reactor Feed Pump Strainers. No Further Evidence of Moisture Separator Reheater Debris Discovered in Strainers,Stub Tubes,Wire Mesh or Structural Members1990-05-18018 May 1990 Discusses Insp of Flash Tanks & Reactor Feed Pump Strainers. No Further Evidence of Moisture Separator Reheater Debris Discovered in Strainers,Stub Tubes,Wire Mesh or Structural Members NRC-90-0083, Discusses Action Plan to Review Socket Weld Failures at Plant.Failure History of Socket Welds Will Be Investigated to Determine Whether or Not Significant Common Mode Failure Mechanism Evident.Plan Expected to Be Completed by 9005251990-05-18018 May 1990 Discusses Action Plan to Review Socket Weld Failures at Plant.Failure History of Socket Welds Will Be Investigated to Determine Whether or Not Significant Common Mode Failure Mechanism Evident.Plan Expected to Be Completed by 900525 NRC-90-0082, Documents Commitments Made During Recent Meetings & Telcon on RHR Sys Small Bore Connections1990-05-11011 May 1990 Documents Commitments Made During Recent Meetings & Telcon on RHR Sys Small Bore Connections NRC-90-0068, Forwards 1989 Annual Financial Repts for Detroit Edison Co & Wolverine Power Supply Cooperative,Inc1990-05-0101 May 1990 Forwards 1989 Annual Financial Repts for Detroit Edison Co & Wolverine Power Supply Cooperative,Inc NRC-90-0071, Responds to NRC 900316 Ltr Re Violations Noted in Insp Rept 50-341/90-03 Re Emergency Preparedness Exercise Weaknesses. Corrective Actions:Case Studies Will Be Developed & Presented in Licensed Operator Requalification Training1990-04-30030 April 1990 Responds to NRC 900316 Ltr Re Violations Noted in Insp Rept 50-341/90-03 Re Emergency Preparedness Exercise Weaknesses. Corrective Actions:Case Studies Will Be Developed & Presented in Licensed Operator Requalification Training NRC-90-0078, Responds to NRC Bulletin 90-002, Loss of Thermal Margin Caused by Channel Bow. Util Has Decided That Fuel Channel Boxes Will Not Be Used After First Bundle Lifetime1990-04-25025 April 1990 Responds to NRC Bulletin 90-002, Loss of Thermal Margin Caused by Channel Bow. Util Has Decided That Fuel Channel Boxes Will Not Be Used After First Bundle Lifetime NRC-90-0051, Responds to SALP 11 Board Rept 50-341/90-01.Outage Critique Action Plan Issued for First Refueling Outage Identifying Lessons Learned & Areas Needing Improvement1990-04-12012 April 1990 Responds to SALP 11 Board Rept 50-341/90-01.Outage Critique Action Plan Issued for First Refueling Outage Identifying Lessons Learned & Areas Needing Improvement NRC-90-0060, Responds to 900104 Request for Supplemental Station Blackout Submittal1990-03-29029 March 1990 Responds to 900104 Request for Supplemental Station Blackout Submittal NRC-90-0061, Forwards Addl Info Re Proposed Drywell Level Instrument Line Configuration,As Followup to 890927 Tech Spec Change Request.Rept Provides Info Re Reasons for Designating Primary Containment Isolation Valve Normally Opened1990-03-27027 March 1990 Forwards Addl Info Re Proposed Drywell Level Instrument Line Configuration,As Followup to 890927 Tech Spec Change Request.Rept Provides Info Re Reasons for Designating Primary Containment Isolation Valve Normally Opened NRC-90-0055, Responds to Generic Ltr 89-19, Request for Action Re Resolution of USI A-47 - Safety Implications of Control Sys in Lwrs. Overfill Protection Sys Adequately Separated from Main Feedwater Control Sys1990-03-19019 March 1990 Responds to Generic Ltr 89-19, Request for Action Re Resolution of USI A-47 - Safety Implications of Control Sys in Lwrs. Overfill Protection Sys Adequately Separated from Main Feedwater Control Sys NRC-90-0024, Suppls Response to Violations Noted in Insp Rept 50-341/85-47 Re Security Records.Util Intends to Rely Solely on Historical Tapes to Retrieve Records Required by Physical Security Plan.Hard Copy Computer Logs Will Be Discarded1990-03-16016 March 1990 Suppls Response to Violations Noted in Insp Rept 50-341/85-47 Re Security Records.Util Intends to Rely Solely on Historical Tapes to Retrieve Records Required by Physical Security Plan.Hard Copy Computer Logs Will Be Discarded NRC-90-0045, Forwards Inservice Insp Summary Rept of 1989 Inservice Insp at Fermi 2 Nuclear Power Plant.1990-03-13013 March 1990 Forwards Inservice Insp Summary Rept of 1989 Inservice Insp at Fermi 2 Nuclear Power Plant. NRC-90-0054, Responds to NRC 900212 Order Modifying License & Notice of Violation.Corrective Actions:Former Director of Nuclear Security No Longer Works for Util & Extensive Actions Taken to Improve Communications W/Nrc1990-03-0909 March 1990 Responds to NRC 900212 Order Modifying License & Notice of Violation.Corrective Actions:Former Director of Nuclear Security No Longer Works for Util & Extensive Actions Taken to Improve Communications W/Nrc NRC-90-0043, Responds to NRC 900224 Ltr Re Weaknesses & Violations Noted in Insp Rept 50-341/89-24.Corrective Actions:Nuclear Fire Protection Specialist Provided Training to Appropriate Personnel on 9002021990-03-0909 March 1990 Responds to NRC 900224 Ltr Re Weaknesses & Violations Noted in Insp Rept 50-341/89-24.Corrective Actions:Nuclear Fire Protection Specialist Provided Training to Appropriate Personnel on 900202 NRC-90-0037, Forwards Completed Questionnaires for Types of Insps,Audits & Evaluations,In Response to Generic Ltr 90-01, Voluntary Participation in NRC Regulatory Impact Survey.1990-03-0505 March 1990 Forwards Completed Questionnaires for Types of Insps,Audits & Evaluations,In Response to Generic Ltr 90-01, Voluntary Participation in NRC Regulatory Impact Survey. NRC-90-0029, Responds to Violations Noted in Insp Rept 50-341/89-36. Corrective Action:All Personnel in Operations & I&C Viewed Professionalism Video Which Included Presentation of Facts Concerning Event1990-03-0505 March 1990 Responds to Violations Noted in Insp Rept 50-341/89-36. Corrective Action:All Personnel in Operations & I&C Viewed Professionalism Video Which Included Presentation of Facts Concerning Event NRC-90-0028, Forwards Semiannual Radioactive Effluent Release Rept for Jul-Dec 1989 & Revised Pages of Rept for Jul-Dec 1988, Containing Recalculated Noble Gas Releases & Doses1990-03-0101 March 1990 Forwards Semiannual Radioactive Effluent Release Rept for Jul-Dec 1989 & Revised Pages of Rept for Jul-Dec 1988, Containing Recalculated Noble Gas Releases & Doses NRC-90-0034, Forwards, 1989 Annual Operating Rept for Fermi 2 & Main Steam Piping Dynamic Response Test Results1990-02-26026 February 1990 Forwards, 1989 Annual Operating Rept for Fermi 2 & Main Steam Piping Dynamic Response Test Results NRC-90-0036, Forwards Response to NRC Survey on Nuclear Fuel Cycle Industry Future Activity,Per 900122 Request1990-02-26026 February 1990 Forwards Response to NRC Survey on Nuclear Fuel Cycle Industry Future Activity,Per 900122 Request NRC-90-0026, Forwards Monthly Operating Rept for Jan 1990 for Fermi Unit 2 & Revised Rept for Dec 1989,correcting Error in Net Electrical Generation Figure1990-02-15015 February 1990 Forwards Monthly Operating Rept for Jan 1990 for Fermi Unit 2 & Revised Rept for Dec 1989,correcting Error in Net Electrical Generation Figure NRC-90-0020, Forwards Response to Violations Noted in Insp Rept 50-341/89-31 Re Maint Support for Security Equipment.Addl Instrumentation & Control Repairmen Hired.Encl Withheld (Ref 10CFR73.21)1990-02-12012 February 1990 Forwards Response to Violations Noted in Insp Rept 50-341/89-31 Re Maint Support for Security Equipment.Addl Instrumentation & Control Repairmen Hired.Encl Withheld (Ref 10CFR73.21) NRC-90-0010, Responds to NRC 900102 Ltr Re Violations Noted in Insp Rept 50-341/89-30.Corrective Actions:Storage Area in Machine Shop closed-out & QA1 Matl Returned to Warehouse Where Positive Controls in Effect & Shift Turnover Procedure Revised1990-02-0101 February 1990 Responds to NRC 900102 Ltr Re Violations Noted in Insp Rept 50-341/89-30.Corrective Actions:Storage Area in Machine Shop closed-out & QA1 Matl Returned to Warehouse Where Positive Controls in Effect & Shift Turnover Procedure Revised NRC-90-0012, Forwards Response to Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment. Monitoring & Treatment Programs to Reduce Incidents of Flow Blockage Due to Biofouling Will Be Implemented During Early 19911990-01-26026 January 1990 Forwards Response to Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment. Monitoring & Treatment Programs to Reduce Incidents of Flow Blockage Due to Biofouling Will Be Implemented During Early 1991 NRC-90-0016, Responds to 10CFR26 Re fitness-for-duty Programs.Util Conducting Testing for Drugs Described in 10CFR26,App a, Section 2.1(a) & at Cutoff Levels Defined in Sections 2.7(3)(1) & 2.7(f)(2) as of 9001031990-01-26026 January 1990 Responds to 10CFR26 Re fitness-for-duty Programs.Util Conducting Testing for Drugs Described in 10CFR26,App a, Section 2.1(a) & at Cutoff Levels Defined in Sections 2.7(3)(1) & 2.7(f)(2) as of 900103 NRC-90-0013, Responds to NRC Bulletin 89-002, Stress Corrosion Cracking of High Hardness Type 410 Stainless Steel Internal Preloaded Bolting in Anchor Darling Model S350W Swing Check Valves or Valves of Similar Design. Subj Valves Not Used by Util1990-01-26026 January 1990 Responds to NRC Bulletin 89-002, Stress Corrosion Cracking of High Hardness Type 410 Stainless Steel Internal Preloaded Bolting in Anchor Darling Model S350W Swing Check Valves or Valves of Similar Design. Subj Valves Not Used by Util NRC-89-0297, Forwards Supplemental Response to NRC Request for Addl Info on Generic Ltr 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping. All Welds Accessible for Ultrasonic Insp1990-01-12012 January 1990 Forwards Supplemental Response to NRC Request for Addl Info on Generic Ltr 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping. All Welds Accessible for Ultrasonic Insp NRC-89-0240, Advises That Info in NRC 891010 Ser,Section 4.13 Re Alternate Rod Insertion/Recirculation Pump Trip Initiation Installed on Divisional Basis,Per ATWS Rule,Deemed Correct. Addl Alarm Also Provided for Arm Position of Switches1990-01-11011 January 1990 Advises That Info in NRC 891010 Ser,Section 4.13 Re Alternate Rod Insertion/Recirculation Pump Trip Initiation Installed on Divisional Basis,Per ATWS Rule,Deemed Correct. Addl Alarm Also Provided for Arm Position of Switches 1990-09-07
[Table view] |
Text
-
Harry Truber Vee F4esidem
+ - En9nmeng and Construcfon k: Detroit
+
Edison RGss==
September 22, 1982 EF2-59174 Mr. L. L. Kintner U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of Licensing Washington, D. C. 20555
Dear Mr. Kintner:
References:
m (1) Enrico Fermi Atomic Power Plant, Unit 2 NRC Docket No. 50-341.
- h '
i (2) Letter from Robert L. Tedesco to H. Tauber, " Safety 7'~
f s Concerns Associated with Pipe Breaks in the BWR
.A' Scram System," dated May 5, 1981.
(3) Letter from Glenn Sherwood to Darrell Eisenhut transmitting -NEDO-24342, "GE Evaluation in Response to NRC Request Regarding BWR Scram System Pipe Breaks," dated April 30, 1981.
(4) Letter from H. Tauber to R. Tedesco, " Safety Concerns Associated with Pipe Breaks in the BWR Scram System, EF2-53,890, dated July 10, 1981.
(5) Letter from Darrell Eisenhut to all BWR Applicants for CP's, Holders of CP's, and Applicants for OL's,
" Safety Concerns Associated with Pipe Breaks in the-BWR Scram System (Generic Letter 81-35)," dated Aug. 31, 1981.
Subject:
Response to NUREG-0803 Mr. Tedesco's letter (Reference 2) requested that we submit a generic e and a plant specific response for. scram system pipe breaks. The report prepared by General Electric (Reference 3) was the basis for i our generic response (Reference 4). Reference 5 forwarded NUREG-0803 which provided further NRC definition for the plant specific response.
The Fermi 2 plant specific response to NUREG-0803 is enclosed.
T3oo /
5 i GED/106/3.0 090382 F209290120 B20922 PDR ADOCK 05000341 A PDR
Mr. L. L. Kintner Septarber 22, 1982 EF-59174 Page 2 This completes our responses to the safety concerns associated with pipe breaks in the BWR Scram System. If you have any questions regarding the above, please contact Mr. Larry E. Schuerman, (313) 649-7562.
Sincerely,
/,',Yh '
. jls Q cc: B. Little 5
g cED/106/3.1 082382
Mr. L. L. Kintner Septaber 22, 1982 EF2 - 59,174 Page 2 bec: T. A. Alessi E. L. Alexanderson H. O. Arora M. L. Batch
- 0. K. Earle L. E. Eix W. J. Fahrner J. R. Green E. P. Griffing W. H. Jens/W. R. Holland L. E. Kanous E. Lusis P. A. Marquardt J. W. Nunley L. E. Schuerman R. A. Vance A. E. Wegele Document Control C. M. Johnson (GE-San Jose)
J. E. Slider (NUS-Gaithersburg)
F. H. Sondgeroth (NUS-Troy)
T Enclosure to EF2-59,174 Response to NUREG-0803 for the Enrico Fermi Atomic Power Plant, Unit 2.
I.
SUMMARY
Detroit Edison has reviewed NUREG-0803 and generally agrees with the generic conclusions enntained therein. The Detroit Edison Fermi 2 specific positions with respect tc the generic conclusions in Section 5 of NUREG-0803 are contained in Section III of this enclosure. The positions show that Fermi 2 is in essential compliance with the pertinent parts of the guidance. Detroit Edison takes exception to the NRC conclusion in NUREG-0803 that a sufficient data base does not exist to terminate the review of this issue on the basis of a quantitative risk assessment. A revised analysis performed by G.E. in behalf of the BWR Oweers' Group (and verified applicable to Fermi 2) shows that this is not the case. As a consequence, no .further action concerning this matter should be required.
CED/106/3.2 090382
r-EF-59,174 II. DISCUSSION The NRC developed a three phaso approach in NUREG-0803 for evaluating the .
safety concern associated with pipe breaks in the scram system. The first step was to determine the probability of a Scram Discharge Volume (SDV) pipe failure
. and to evaluate the contribution of such a failure to a core melt. The NRC's generic analysis resulted in a probability of 10-4 per plant year for a SDV pipe failure -and less than 10-6 per plant year as the frequency of a core
-melt given the operability of mitigation equipment. The NRC continued in their evaluation of the consequences of the postulated scenario because these generic probabilities were not sufficiently small or substantiated.
Detroit Edison supported the Boiling Water Reactor Owners' Group (BWROG) in performing a plant specific probabilistic risk assessment (FRA) since both the ,
NRC's NUREG-0803 and General Electric's (GE) NEDO-24342 generic analyses were !
overly conservative in assessing the plant specifics. A GE prepared report, i NEDO-22209, August, 1982, " Analysis of Scram Discharge Volume System Piping ,
Integrity", documents the results of this BWROG study to determine the probability of the loss of SDV piping integrity, and to evaluate the '
contribution of such a loss to a core melt. This report is attached to this submit tal.
The results of the BWROG report show that the probability of an unisolatable loss of scram system piping integrity is 3 x 10-7 per plant year. As calculated in NEDO-24342, the probability of core damage given an unisolatable SDV rupture for Mark I and II plants.is 6 x 10-5 per plant. Conse i the combined probability for core damage for this event is 2 x 10-guently,I events per reactos year. This probability is sufficiently small to preclude further efforts related to this matter for Fermi 2.
BWROG Report Methodology The BWROG report provides a more detailed analysis of the failure probability of the SDV piping, takes into account plant specific data, and evaluates the f ailure of valves as a loss of SDV integrity.
Three different approaches were used to evaluate the SDV pipe break probability: the first approach (based on NED0-24342) used the assessed probability for a LOCA per Wash-1400 and modified the probabilities by the ratio of SDV piping length to LOCA sensitive piping length; the second approach (based on NUREG-0803) estimated the SDV piping length and multiplied it by a failure rate of 3 x 10-7 per foot per year to obtain a break probability; the third approach, fracture mechanics, evaluated break probabilities by analyzing the mechanism of crack growth while under repeated stress.
r
'GED/106/3.3 090382
EF2-59,174 II. DISCUSSION (Cont'd)
BWROG Report Methodology (Cont'd)
The first two experience approaches yielded a break probability of 1 x 10-7 per plant year. The fracture mechanics approach supported this low probability in that no failures for the cyclic stress for scram cases were predicted since the stresses were insufficient to increase cracks to a critical size.
A loss of SDV piping integricy is also evaluated in the BWROG report. This analysis includes the previously discussed SDV pipe break as well as the failure of a pressure relief valve or the failure of two (2) drain or two (2) vent valves. The evaluation is based upon pinat specific data from 14 utilities with MK I or MK II containments. The plant specific data used in the.PRA includes scrams per year, scram reset times, welded joint information, and piping diameters and lengths for the SDV configuration including post-Browns Ferry 3 modifications.
Applicability to Fermi 2 A study of a breach of SDV integrity for an " average" plant and a " limiting" plant is included in the BWROG report. The average plant refers to a plant
- having the average pipe lengths, number of scrams and scram duration of the plant specific data. Since Ferti 2 is not yet operating, the application of data from the operating plants 2c appropriate for the number and duration of scrams. The average plant data are also representative of Fermi 2. Thus , for Fermi 2 the probability for a loss of SDV integrity is 1 x 10-7 per reactor year as calculated in the BWROG PRA using plant specific data and the approach of NUREG-0803. Similarly the probability of a SDV break leading to a core melt is approximately 2 x 10 1I per plant year.
The NRC, in NUREG-0803, stated that "it was agreed that if the probability of core damage from the postulated scenario was shown to be sufficiently small, no further review, beyond verification of plant-specific response applicability, would be necessary." They further noted that "as the review progressed, it
. became evident that a sufficient data base did not exist to conservatively terminate the generic review on the basis of a quantitative risk assessment."
The BWROG analysis uses plant specific data and shows that the probability of core damage is suf ficiently small.
It is thus concluded that the probability of core damage initiated by a failure of the SDV piping integrity is sufficiently low so as to preclude the necessity of qualification or design modification for equipment required to detect and/or mitigate the consequences of such an integrity loss.
GED/106/3.4 090382
EF2-S9,174 III. DETROIT EDISON POSITIONS RELATIVE to SECTION 5 of NUREG-0803 Table 5.1 of NUREG-0803 summarizes NRC staff's guidance for an acceptable plant-specific resolution of the concerns with regards to the SDV pipe break.
The Fermi 2 specific responses listed belcw demonstrate that the mechanical quality, maintenance procedures, operator actions and existing system performance are adequate to resolve these concerns. Information given in these responses includes data on SDV piping integrity but for which no credit was taken in the risk analysis previously done. This information plus using the existing provisions of NRC Standard Review Plan (SRP) 3.6.1 for moderate -
energy fluid systems and 3.6.2 for flow from a crack demonstrate the conservatism of the NRC analysis.
The plant specific assuranca of mechanical quality is in agreement wth the original NRC guidance of NUREG-0785, Safety Concerns Associated with Pipe Breaks in the BWR Scram System. This AEOD report states that, "If from these convolutions one were to conclude that t' e SDV pipe break is a significant contributor to BWR core uncovery risk, it is believed that the risk can best be reduced by decreasing the likelihoed of a break in the SDV system piping by an appropriate upgrading of the SDV mechanical integrity assurance basis." Since by the G.E. study the SDV pipe break has been shown to be an insignificant contributor to core uncovery risk, Detroit Edison strongly believes in line with the above recommendation that further efforts should be in the area of insuring SDV system piping integrity. This is the fundamental basis for the Detroit Edison positions discussed below. For convenience, the Fermi 2 positions are listed in the same sequence as on Table 5.1 of NUREG-0803.
- 1. PERIODIC IN SERVICE INSPECTION The SDV system is included in the Fermi 2 In-Service Inspection Program in conformance with the requirements of Class 2 piping under Section XI of the Boiler and Pressure Vessel Code" of the American Society of Mechanical Engineers (ASME Code). The pre-service inspection is based on the 1977 Edition of Section XI Code up to 1979, Summer Addenda. The in-service inspection is presently based on the 1980 Edition of Section XI Code up to 1980 Winter Addenda. The In-service and Inspection Testing Program has been previously submitted to the NRC.
- 2. THREADED JOINT INTEGRITY Welded joints are utilized in the SDV system piping. A review of design and as-built drawings and a site inspection were conducted to verify the exclusion of threaded joints in the SDV system piping. The SDV system piping is designed, fab icated and installed to the requirements of the ASME Code, Sectior. III 3 Nr Class 2 components.
GED/106/3.5 090382
EF2-59,174 l 3. SEISMIC DESIGN VERIFICATION 1
The SDV piping for Fermi 2 is Quality Class I and is designed for Seismic l
Category I loadings. A reanalysis of the seismic design for the SDV piping l
has been recently completed. While the original design and seismic analysis were completed during mid 70's a large portion of the installation did not occur until 1981/82. Reasons which necessitated a reevaluation included interference problems and modified requirements for seismic analysis from the NRC such as IE Bulletins 79-02 and 79-14. The redesign and reanalysis work was followed immediately by construction. The seismic design report is updated to reflect as-built conditions as stated under Item 6.
- 4. RCU - SDV EQUIPMENT PROCEDURE REVIEW Work performed on safety related systems' equipment must be performed under the control of approved procedures and instructions. These provide assurance that the maintenance and surveillance activities are performed in a controlled and safe manner. SDV maintenance work, surveillance tests or modifications must have the approval of the Nuclear Shif t Supervisor before starting. The Shif t Supervisor evaluates the work to be performed on the equipment with regards to its potential impact on plant operations and personnel protection. Where isolation cannot be obtained, work is not permitted until proper plant conditions exist. HCU - SDV equipment maintenance affecting system integrity would require cold shutdown.
Documentation is provided to assure the Shift Supervisor that the work was completed and operationallt verified. This documentation is in accordance with General Maintenance Procedure 12.000.15, Surveillance Program Procedure 12.000.18 and Tagging and Protective Barrier System Procedure 12.000.12. The requirements of these procedures are contained in the SDV piping / equipment maintenance and surveillance procedures and instructions.
- 5. ENVIRONMENTAL QUALIFICATION OF PROMPT DEPRESSURIZATION FUNCTION The Automatic Depressurization System (ADS) accomplishes the reactor depressurization function. The equipment and instrumentation required for depressurization is located remote from the environment resulting from a SDV pipe break. The Automatic Depressurization System, as are others, is required for safe shutdown of the reactor. These systems are included for evaluation under the NUREG-0588 environmental qualification program.
Further specific evaluation is not warranted considering our established qualification program and the low probability of the event as detailed in the Discussion. ,
GED/106/3.6 090332
EF2-59,174
- 6. AS-BUILT INSPECTION The as-built conditions of the SDV piping and supports are incorporated in the design and seismic analysis for the system. The design, analysis and installation program is such that as-built drawings are completed and provided for input to an as-built revision of the stress reports. As-built drawings include small diameter piping.
The original design was performed and the start of installation was begun during the mid-70's. As stated in Item 3, the design rework occurred in 1980/81 with the installation being essentially complete as of May, 1982.
The reconciliation of as-built field conditions to the seismic analysis is scheduled for completion in late 1982. There are nearly 200 SDV piping and support drawings and 25 stress reports that will reflect as-built conditions.
The designers and constructors for the SDV system have quality assurance programs that are approved by Detroit Edison. The requirements of these internal programs, as well as the audits and surveillance performed by Detroit Edison QA of these vendors, provide verification of the quality assurance for the SDV piping and supports with regard to as-built conditions.
- 7. IMPROVEMENT OF PROCEDURES The operator actions necessary to mitigate the consequences of a potential rupture of tbc JDV are delineated in Fermi 2 Abnormal Operating Procedure 20.106.11, Scram Discharge Volume Failure. This procedure is executed concurrently with Abnormal Operating Procedure 20.106.01, Reactor Scram in the event the scram cannot be reset within five (5) minutes of initiation.
The existing indication and instrumentation provides the operator with information to detect a SDV pipe break. Information available from the Control Rod Drive System includes multiple indications and alarms for drive temperature increases , rod insert overtravel and od drift. Information La detect a leak in the Reactor Building includes sump level alarms, area radiation monitors, corner room level and temperature alarms and operator observation. If the scram cannot be reset within 25 minutes of the scram initiation signal AND the integrity of the SDV cannot be physically verified AND any of the multiple control rod indicators exist, the operator is directed to manually depressurize the reactor.
GED/106/3.7 090382
EF2-59,174
- 7. IMPROVEMENT OF PROCEDURES (Cont'd)
The Emergency Operating Procedures for Fermi 2 have not been revised for a SDV pipe break pending the activities of the BWR Owners' Group. Per its charter, the BWR Owners' Group cannot respond to NRC requests for utility action except at the discretion of its members. Neither can Detroit Edison commit the BWR Owners' Group to a specific course of -action except by its participation in Owners' Group decisions by vote. Thus, Detroit Edison can only provide a response to the Staff's guidance to the BkR Owner's Group decisions by vote. - Thus, Detroit Edison can only provide a response to the Staff's guidance to the BWR Owners' Group in NUREG 0803 as if it were addressed to Detroit Edison directly.
However, the BWR Owners' Group has discussed the guidance of NUREG-0803 regarding modifications of the Emergency Operating Procedures Guidelines and acknowledges the benefits of treating the subject generically. The BWR Owners' Group is in the process of completing an extension of the guidelines to include steps for reactivity control, and certain other modifications to the guidelines which have been discussed with your staff.
It is_ Detroit Edison's judgment that completion of these modifications outweighs, in immediate importance, the NUREG-0803 guidance for other guideline modifications. Af ter current activities of the guidelines are substantially complete, Detroit Edison will support a preliminary study by the BWR Owners' Group to determine the best approach to fulfilling the intent of the guidance provided in NUREG-0303. It is not clear that the best approach will involve modification of the guidelines. When the study is complete, the Owners' Group will determine whether to authorize specific actions to modify the Emergency Procedure Guidelines. Detroit Edf. son will advise the. NRC of the result of that decision and the Owners's Group plan at the time.
- 8. VERIFICATION GF EQUIPMENT DESIGNED FOR WATER IMPINGEMENT See Item 5 and DISCUSSION
- 9. VERIFICATION OF EQUIPMENT QUALIFIED FOR WETDOWN'BY 212'F WATER See Item 5 and DISCUSSION
- 10. FEEDWATER AND CONDENSATE SYSTEM OPERATION The feedwater system is dependent on reactor building equipment for steam to drive the reactor feed pumps via the MSIVs and for level control instrumentation. This instrumentation is at another elevation and is not GED/106/3.8 090382
)
EF2-59,174
- 10. FEEDWATER AND CONDENSATE SYSTEM OPERATION (Cont'd) within the harsh environment for this event. Even if the reactor feed pumps were unavailable, there are multiple motor driven condenser and heater feed pumps which provide suf ficient capacity to maintain reactor level without full depressurization.
I
! 11. EVALUATION OF AVAILABILITY OF llPCI-LPCI TURBINES DUE TO Il1Gli AMBIENT TEMPERATURE TRIPS Sufficient high pressure pump capacity exists for coolant inventory makeup requirements resulting from a postulated SDV pipe break. The llPCI and RCIC pumps are both turbine driven pumps with isolation of a specific pump upon detection of a local steam leak. Thermocouples sensing high ambient temperature are located in the llPCI room and the Northeast corner room (RCIC). The physical separation of these rooms and the flood control and separation within the equipment and floor drain systems limit the harsh i environment effects such that simultaneous isolation of HPCI and RCIC will l not occur. The llPCI and RCIC system equipment is being evaluated within our environmental qualification program. In addition to the HPCI and RCIC nystems two (2) Standby Feedwater System pumps are designed to provide high pressure injection. Each non-Quality Class I backup pump provides 600 GPM at reactor pressure and is located in the Turbine Building. Finally, the LPCI system is a subsystem of the RHR system and uses motor driven pumps which do not isolate for any high ambient room temperature.
- 12. VERIFICATION OF ESSENTIAL COMPONENTS QUALIFIED FOR SERVICE AT 212* AND 100% HUMIDITY See Item 5 and DISCUSSION
- 13. LIMITATION OF COOLANT IODINE CONCENTRATION TO STANDARD TECHNICAL SPECIFICATION VALUES The reactor water concentrations stated in the General Electric Standard Technical Specifications are applicable to Fermi 2. The NRC Staff concluded in NUREG-0803 that "the STS would provide a reasonably conservative upper limit of reactor water iodine concentration."
CED/106/3.9 090382
_ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _