Submits Util Position Re Tech Spec 3.0.4 & Generic Ltr 87-09 Re source-range Neutron Flux Monitors for Refueling Operations.Implementation of Tech Spec 3.0.4 Will Be Monitored Via Tech Spec Improvement Program
ML20066J667
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 02/25/1991
From: Wallace E
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-87-09, GL-87-9, TAC-77172, TAC-77173, TAC-99917S1, NUDOCS 9102260337
Download: ML20066J667 (3)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - . _ _ _ _ _ . . _ _ - . -

. s k

knnessee vacy Autwy I'm samer st<eet chanawoa. tennesse surn FEB 2 51991 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of ) Docket Nos 50-327 Tennessee Valley Authority ) 50-328 SEQUOYAH NUCLEAR PLANT (SQN) - TVA POSITION RECARDING TECHNICAL SPECIFICATION (TS) 3.0.4 AND GENERIC LETTER (CL) 87-09 (TAC NO. 99917S1)

References:

1. NRC letter to TVA dated September 21, 1990, " Provisions of 3.0.4 Deleted From LCO 3.9.2, Source Range Neutron Flux Monitors (TAC NOS. 77172/77173) (%S 90-15) -

Sequoyah Nuclear Plant, Units 1 and 2"

2. TVA letter to NRC dated November 15, 1988, "Sequoyah Nuclear Plant (SQN) - TVA Position Regarding Technical Specification (TS) 3.0.4 and Generic Letter (GL) 87-09" By Reference 1 NRC requested that TVA reconsider the position previously taken by Reference 2 with respect to implementation of the GL 87-09 version of TS 3.0.4. This request was a result of the T3 90-15 amendment to incorporate an exception to TS 3.0.4 in the Action-Statement to Limiting Conditions for Operation (LCO) 3.9.2 on source range neutron flux monitors for refueling operations. If a TS change to implement the GL 87-09 version of TS 3.0.4-had been previously processed, there would not have been a need for TS 90-15.

TVA has reevaluated its position provided in Reference 2 in review with the Operations organization and has concluded that at this time, we still do not consider the implementation of the CL 87-09 version of TS 3.0.4 a safety enhancement. While it is agreed that the GL 87-09 version of TS 3.0.4 would have negated the need to process TS 90-15, there is still a concern that in the broader sense, the GL 87-09 version of TS 3.0.4 reduces LCO clarity from a human factors standpoint when the requirement exceptions are removed from the individual specifications; this accordingly. could introduce uncertainty in interpretation and application. In conclusion, the value of the change is not currently considered to offset the drawbacks of implementation.

9102260337 910225 .

PDR ADOCK 05000327 i P

PDR Il

. 2

, .,* FCB 2 51991 U.S. Nuclear Regulatory Commission Additionally, there may be some cases where applicability may not be prudent even if allowable under the GL 87-09 requirements. An example would be the application of the guidance to LCO 3.9.8.2, which allows, with action, continued operation in the mode or condition if two residual heat removal (RHR) loops are not operable and vessel water level is less than 23 feet above the top of the reactor vessel flange. The GL 87-09 version of 3.0.4 would allow entry into Mode 6 with less than 2 RHR loops operable with vessel water level less than 23 feet above the top of the reactor vessel flange or reduction of water level to less than 23 feet while in Mode 6 without two RHR loops operable. Although allowable under the GL 87-09 requirements, these actions may not be considered to be concistent with the intent of the specification or prudent operation.

Conversely, instances may exist in the ct'rrent version of SQN's TSs where the TS 3.0.4 guidance of GL 87-09 could be prudently and clearly applied. In that regard, as a part of SQN's ongoing efforts for line I item improvements in the TSs, TVA will continue to factor in guidance of the GL 87-09, as appropriate.

It is further noted that the NRC TS Improvement Program (TSIP) may be applying TS 3.0.4 exceptions in a somewhat different method than that currently proposed by GL 87-09. This method of implementation, with its human factors considerations, may be a viable option for TVA in the future. TVA will continue to monitor implementation of TS 3.0.4 in the TSIP and evaluate this implementation for future TS improvements.

There are no commitments made in this submittal. Please direct questions concerning this issue to J.D. Smith at (615) 843-6672.

Very truly yours, TENNESSEE VALLEY AUTHORITY u IfL E . G . 'Sallac na r Nucleal: Licensing and Regulatory Affairs cc: See page 3 J

3

, . ,, JEB 2 51991 U.S. Nuclear Regulatory Commission ec: Ms. S. C. Black, Deputy Director Project Directorate 11-4 U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Mr. J. N. Donohew, Project Manager U.S. Nuclear Regulatory Connission One White Flint, North 11555 Rockville Piko Rockville, Maryland 20852 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379 Mr. B. A. Wilson, Project Chief U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 i

_