Interim Deficiency Rept Re Inadequate Seismic Design Spec for Fisher Control Valve Actuators.Initially Reported on 811231.New Actuators Ordered to Assure That Valve Seismic Design Accounts for Peak Response Frequency
ML20063L476
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 08/27/1982
From: Wells D
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, EF2-59387, NUDOCS 8209090120
Download: ML20063L476 (3)


Text

_1_.

_. -._~..__._==-_

Donald A. Wells

'i veaw 0%,my Aw v.r e Detroit Edison EME "

August 27, 1982 EF2-59387 i

kh Mr. James G. Keppler, Regional Administrator 3

1 Region III fY I

U.S. Nuclear Regulatory Cmmission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Subject:

Interim Report of 10CFR50.55(e) Item on Fisher Control Valves (#37) i

Dear Mr. Keppler:

i This additional interim report on the Fisher Control Valve problem has been prepared to provide you with the current status of this problem.

This item was originally reported to Mr. R. Knop of NRC Region III by Detroit Edison's Mr. H. A. Walker, Supervisor-Construction Quality Assurance, on Decem-ber 31,1982. At that tine, it had been determined that there was a problem i

with Fisher Control Valves at tle Fermi 2 site.

Control valves were purchased frcm Fisher Controls per Detroit Edison specifi-cations. Later, Detroit Edison Engineering determined that cut-off frequencies had not been adequately specified to assure that seismic design of the valves j

accounted for the Fermi 2 peak response frequency. An investigation by the manufacturer revealed that the original valve actuators did not meet the neces-1 sary seismic requirements.

t New valve actuators have been ordered via revised purchase order and are ex-1 pected to arrive May, 1983. These new actuators, when installed, will nect I

seismic requirenents. The engineering specification for Class 3 valves will be revised for future purchases.

Another report on this item, either interim or final, is scheduled to be sent i

to you on or before Decerrber 17, 1982. If you have questions concerning this matter, please contact Mr. G.M. Trahey, Assistant Director-Project Ouality j

Assurance.

j very truly yours, l

&b@ll '7 L

I DAW /DF/cp

.h

~

SN"x 8209070120 820827 PDR ADOCK 05000341 S

PDR

Mr. Janes G. Keppler, Regional Administrator August 27, 1982 Page 'lwo EF2-59387 cc: Mr. Richard DeYoung, Director Office of Inspection and Enforcement Division of Reactor Inspection Programs Washington, D.C. 20555 Mr. Bruce Little, Resident Inspector U.S. Nuc1 car Regulatory Cm mission 6450 North Dixie Highway Newport, Michigan 48166

s Mr. Janos G. Keppler, Regional Administrator August 27, 1982 Page Three EF2-59387 bec:

T.A. Alessi J.C. Ard, Jr.

C.R. Bacon W.F. Colbert W.M. Everett W.J. Fahrner D. Ferencz E.P. Griffing C.M. lieldel W.lf. Jens K. Larson E. Lusis P.A. Marquardt/ Docket File (2)

E.II. Newton S.II. Noetzel J.W. Nunley J.D. Ryan L.E. Schuerman II. Tauber G.M. Trahey R.A. Vance/L.E. Eix A.E. Wegele Site Doctment Control NRC Follow-Up Book /NRC File Chron File i