Category:INTERVENTION PETITIONS
MONTHYEARML20247B3941989-07-13013 July 1989 NRC Staff Response to Rl Anthony Request for Hearing & for Intervention.* Commission Should Deny Anthony Request Due to Anthony Interest Not within Scope of Remand.W/Certificate of Svc ML20246P0581989-07-0707 July 1989 Answer by Philadelphia Electric Co to Request by Rl Anthony for Hearing & Admission as Intervenor.* Anthony Not Entitled to New Hearing on Emergency Plannning or Other Safety Issues & Request Should Be Denied.W/Certificate of Svc ML20245J3681989-06-23023 June 1989 Request by Intervenor Rl Anthony to Be Continued as Intervenor in Licensing Process for Unit 2 & for Hearing Under 42 ESC Section 2239(a) as Affected Person,Endangered by Philadelphia Electric Failure to Satisfy Plant....* ML20235B4271987-09-16016 September 1987 Response of NRC Staff to Proposed Contentions of Air & Water Pollution Patrol & Rl Anthony.* Board Should Deny Requests That Hearing Be Held in Connection W/Proposed Amend. Certificate of Svc Encl ML20238F1771987-09-11011 September 1987 Licensee Answer to Contentions Proposed by Intervenors Air & Water Pollution Patrol & Rl Anthony.* Air & Water Pollution Patrol & Rl Anthony Failed to Plead Single Admissible Contention.W/Certificate of Svc ML20214N1231987-05-22022 May 1987 Licensee Answer in Opposition to Petition by Rl Anthony for Leave to Intervene and for Hearing.* Petition Deficient Under Rules for Intervention.Certificate of Svc Encl ML20214N2251987-05-20020 May 1987 Licensee Answer in Opposition to Request for Hearing & Leave to Intervene by Air & Water Pollution Patrol.* Supporting Info Encl.Certificate of Svc & Notices of Appearance Encl ML20214A9301987-05-14014 May 1987 Licensee Opposition to Petition by Graterford Inmates for Review of ALAB-863.* Review Opposed on Grounds That Inmate Petition Failed to Show ALAB-863 Erroneous or Justify Claims of Prejudice.Certificate of Svc Encl ML20214M7331986-09-0404 September 1986 Petition of Air & Water Pollution Patrol for Leave to Intervene Opposing Applicant 860819 Application for Amend to License NPF-39.NRC Address List Encl ML20212N2871986-08-25025 August 1986 Petition of Rl Anthony for Leave to Intervene & Request for Hearing ML20210N4841986-04-29029 April 1986 Petition for Reconsideration of 860227 Petition to Suspend License NPF-39 Due to Faulty Referral to Director of NRR, Inappropriate Response & Restating of Petition Under 10CFR50.100 & 10CFR2.201(c) ML20154R5151986-03-26026 March 1986 Answer Opposing Rl Anthony 860226 Contention Suppls on Amends 1 & 2 to License NPF-39 Due to Failure to Satisfy or Discuss Lateness Criteria & Lack of Standing ML20154R5261986-03-26026 March 1986 Answer Opposing Fr Romano 860319 Late Filed Suppl in Response to Notice of Opportunity to Request Hearing on Proposed Amend 1 to License NPF-39.Romano Failed to Plead Admissible Contention.Certificate of Svc Encl ML20210E1911986-03-19019 March 1986 Suppl to 860215 Petition for Leave to Intervene on 860130 & 0205 Requests & Provides List of Contentions Vs Amend to License NPF-39 ML20138A8931986-03-17017 March 1986 Response Opposing Petition of Air & Water Pollution Patrol for Leave to Intervene & Request for Hearing Re Amend 1 to License NPF-39.W/Certificate of Svc ML20138A9081986-03-17017 March 1986 Response Opposing Rl Anthony 860215 Contentions Re Util Request for Amend 1 to License NPF-39,extending 18-month Surveillance Interval by 14 Wks Beyond Max 25% Extension Allowed by Tech Specs.W/Certificate of Svc ML20138A9511986-03-17017 March 1986 Response Opposing Rl Anthony Contentions Re OL Amend. Contentions Lack Requisite Specificity & Bases Under 10CFR2.714(b).Notice of Appearance & Certificate of Svc Encl ML20138A8851986-03-13013 March 1986 Petition of Rl Anthony & Friends of the Earth for Leave to Intervene & Request for Hearing ML20141N1611986-02-26026 February 1986 Petition of Rl Anthony & Friends of the Earth for Leave to Intervene & Request for Hearing in Opposition to Util Request to Amend Tech Specs 4.6.1.2.d & 4.6.1.2.g to License NPF-39 ML20205K5471986-02-25025 February 1986 Response Opposing Rl Anthony/Friends of the Earth 860205 Petition to Intervene & Request for Hearing Re 851218 Proposed Schedular Amend from Testing Certain Excess Flow Check Valves for 14-wk Period.Certificate of Svc Encl ML20141N1371986-02-24024 February 1986 Petition of Air & Water Pollution Patrol for Leave to Intervene & Request for Hearing ML20214C9141986-02-19019 February 1986 Answer Opposing 860130 late-filed Petition for Leave to Intervene & Request for Hearing by Rl Anthony.Certificate of Svc Encl ML20154D5771986-02-15015 February 1986 Petition of Rl Anthony & Friends of the Earth for Leave to Intervene & Request for Hearing ML20141M8271986-02-12012 February 1986 Petition of Rl Anthony & Friends of the Earth for Hearing & Immediate Stay on Effectiveness & Implementation of Amend 1 to License NPF-39.Util Should Be Required to Suspend Operations on Deadline Until Tests Performed ML20151Y7851986-02-10010 February 1986 Opposition to 860126 Petition by Friends of the Earth for Review of ALAB-828.Intervenor Has Shown No Issue of Fact,Law or Policy Which NRC Should Review.Certificate of Svc Encl ML20151T9881986-02-0505 February 1986 Amend to 860130 Petition of Rl Anthony & Friends of the Earth for Leave to Intervene & Request for Hearing.Extension of 96 Days for Testing Instrumentation Lines Vital to Safe Operation & Shutdown Requested.W/Certificate of Svc ML20094A2831984-11-0202 November 1984 Answer to Intervenor Del-Aware Unlimited,Inc,Revised Contentions V-14 & V-16.Proposed Contentions Should Be Denied & Del-Aware Dismissed as Party.Certificate of Svc Encl ML20094A8691984-10-23023 October 1984 Appeal from Second Partial Initial decision,LPB-84-31 & ASLB 840901 Motion to Set Aside & Reopen Contentions V-3a & 3B & Petition for Stay ML20106C5081984-10-19019 October 1984 Revised Contentions 14 & 16 Re Destruction of Eligible Natl Historic District of Point Pleasant & Adverse Effect on Salinity Levels & Water Quality in Delaware River, Respectively.Certificate of Svc Encl ML20093F0851984-10-0909 October 1984 Response to Limerick Ecology Action Refiled Deferred Offsite Emergency Planning Contentions.Certificate of Svc Encl ML20093D6331984-10-0909 October 1984 Answer Opposing Limerick Ecology Action (Lea) Deferred Offsite Emergency Planning Contentions.Lea Respecified Contentions Should Be Denied.Certificate of Svc Encl ML20093C0991984-10-0101 October 1984 Respec of Offsite Emergency Planning Contentions.Certificate of Svc Encl ML20097C5551984-09-13013 September 1984 Answer Opposing Limerick Ecology Action (Lea) 840906 Respecification of Offsite Emergency Planning Contentions. ASLB Should Dismiss Any Contentions for Which Lea Fails to Proffer Direct Testimony.Certificate of Svc Encl ML20096A7221984-08-29029 August 1984 Response Opposing Air & Water Pollution Patrol 840814 Pleading on Reopening Contention VI-1 Re Welding & Welding Insp Infractions.Certificate of Svc Encl ML20095E4271984-08-21021 August 1984 Answer Opposing late-filed Air & Water Pollution Patrol 840808 New Contention Re Evacuation.Contention Lacks Basis & Specificity & Fails to Show Good Cause for Late Filing. Certificate of Svc Encl ML20095E4401984-08-20020 August 1984 Provides Addendum to Air & Water Pollution Patrol 840816 New Info Contention Re Polyvinyl Chloride.Fifth Criterion Re Breakdown of Polyvinyl Chloride Inadvertantly Omitted.Small Delay in Proceedings Ack for Large Public Good ML20095C0251984-08-16016 August 1984 New Info Contention Re Health Hazard Via Polyvinyl Chloride Fill Used in Reactor Cooling Towers.W/Svc List ML20094K0871984-08-0909 August 1984 Reply to Applicant & Staff Answers to Cepa Safety Contentions.Contentions Should Be Admitted.Certificate of Svc Encl ML20094J7761984-08-0808 August 1984 New Contention That Applicant Must Provide Fully Testable & Capable Emergency Evacuation Plan Prior to Receipt of OL ML20093N2651984-07-27027 July 1984 Answer to Consumer Educ & Protective Assoc 840717 Safety Contentions.Contentions Lack Basis,Concern Ratemaking Matters Outside NRC Jurisdiction & Should Be Denied. Certificate of Svc Encl ML20093E4241984-07-16016 July 1984 Safety Contentions Re Util Inability to Conduct Full & Safe Test Procedures.Certificate of Svc Encl ML20090A6751984-07-10010 July 1984 Answer to New Proposed Contention by Air & Water Pollution Patrol Re Gross Alpha.Certificate of Svc Encl ML20092N1501984-06-26026 June 1984 New Contention That EPA Max Containment Levels for Gross alpha,Ra-226 & Ra-228 Inadequately Verified by Applicant & Nrc.W/Svc List ML20092P7701984-06-19019 June 1984 Motion Opposing Util 840509 Motion for Expedited Partial Decision & Low Power License.Util & NRC Should Certify That All Nonconformance Items & Open Insp Items Corrected & Complete Before Nuclear Fuel Moved Onsite ML20092P7721984-06-18018 June 1984 Motion for Admission of Contentions Based on JW Gallagher & Js Kemper Requesting Remaining Portion of License to Move Fuel to Refueling Floor,Insp & Storage of Fuel & Petition for Stay ML20091R4601984-06-13013 June 1984 Answer Opposing Friends of the Earth 840518 Supplemental Motion for Admission of New,Late Contentions Re Applicant Motion for Expedited Partial Initial Decision & Issuance of Low Power License.Certificate of Svc Encl ML20091C9221984-05-29029 May 1984 Response Opposing Petition by Citizen Action in the Northeast for Late Intervention & Admission of Financial Qualifications Contention.Contentions Lack Requisite Bases & Specificity.Certificate of Svc Encl ML20087M8061984-03-30030 March 1984 New Addition to Contention Re Asbestos Fiber Discharges Into Schuylkill River & Air.Discharge Not Identified Nor Included in Plant Operation Discharge Descriptions.W/Svc List ML20087M6381984-03-28028 March 1984 Response Opposing M Lewis 840314 Motion for New Contention Based on IE Info Notice 84-17 Cooling of Vital Components by Liquid Nitrogen.Certificate of Svc Encl ML20087K8651984-03-23023 March 1984 Motion to Dismiss Particular Onsite Emergency Planning Contentions for Which Discovery Not Provided or No Litigable Basis Shown.Certificate of Svc Encl 1989-07-07
[Table view] Category:RESPONSES & CONTENTIONS
MONTHYEARML20247B3941989-07-13013 July 1989 NRC Staff Response to Rl Anthony Request for Hearing & for Intervention.* Commission Should Deny Anthony Request Due to Anthony Interest Not within Scope of Remand.W/Certificate of Svc ML20246P0581989-07-0707 July 1989 Answer by Philadelphia Electric Co to Request by Rl Anthony for Hearing & Admission as Intervenor.* Anthony Not Entitled to New Hearing on Emergency Plannning or Other Safety Issues & Request Should Be Denied.W/Certificate of Svc ML20245J3681989-06-23023 June 1989 Request by Intervenor Rl Anthony to Be Continued as Intervenor in Licensing Process for Unit 2 & for Hearing Under 42 ESC Section 2239(a) as Affected Person,Endangered by Philadelphia Electric Failure to Satisfy Plant....* ML20235B4271987-09-16016 September 1987 Response of NRC Staff to Proposed Contentions of Air & Water Pollution Patrol & Rl Anthony.* Board Should Deny Requests That Hearing Be Held in Connection W/Proposed Amend. Certificate of Svc Encl ML20238F1771987-09-11011 September 1987 Licensee Answer to Contentions Proposed by Intervenors Air & Water Pollution Patrol & Rl Anthony.* Air & Water Pollution Patrol & Rl Anthony Failed to Plead Single Admissible Contention.W/Certificate of Svc ML20214N1231987-05-22022 May 1987 Licensee Answer in Opposition to Petition by Rl Anthony for Leave to Intervene and for Hearing.* Petition Deficient Under Rules for Intervention.Certificate of Svc Encl ML20214N2251987-05-20020 May 1987 Licensee Answer in Opposition to Request for Hearing & Leave to Intervene by Air & Water Pollution Patrol.* Supporting Info Encl.Certificate of Svc & Notices of Appearance Encl ML20214A9301987-05-14014 May 1987 Licensee Opposition to Petition by Graterford Inmates for Review of ALAB-863.* Review Opposed on Grounds That Inmate Petition Failed to Show ALAB-863 Erroneous or Justify Claims of Prejudice.Certificate of Svc Encl ML20214M7331986-09-0404 September 1986 Petition of Air & Water Pollution Patrol for Leave to Intervene Opposing Applicant 860819 Application for Amend to License NPF-39.NRC Address List Encl ML20212N2871986-08-25025 August 1986 Petition of Rl Anthony for Leave to Intervene & Request for Hearing ML20210N4841986-04-29029 April 1986 Petition for Reconsideration of 860227 Petition to Suspend License NPF-39 Due to Faulty Referral to Director of NRR, Inappropriate Response & Restating of Petition Under 10CFR50.100 & 10CFR2.201(c) ML20154R5151986-03-26026 March 1986 Answer Opposing Rl Anthony 860226 Contention Suppls on Amends 1 & 2 to License NPF-39 Due to Failure to Satisfy or Discuss Lateness Criteria & Lack of Standing ML20154R5261986-03-26026 March 1986 Answer Opposing Fr Romano 860319 Late Filed Suppl in Response to Notice of Opportunity to Request Hearing on Proposed Amend 1 to License NPF-39.Romano Failed to Plead Admissible Contention.Certificate of Svc Encl ML20210E1911986-03-19019 March 1986 Suppl to 860215 Petition for Leave to Intervene on 860130 & 0205 Requests & Provides List of Contentions Vs Amend to License NPF-39 ML20138A8931986-03-17017 March 1986 Response Opposing Petition of Air & Water Pollution Patrol for Leave to Intervene & Request for Hearing Re Amend 1 to License NPF-39.W/Certificate of Svc ML20138A9081986-03-17017 March 1986 Response Opposing Rl Anthony 860215 Contentions Re Util Request for Amend 1 to License NPF-39,extending 18-month Surveillance Interval by 14 Wks Beyond Max 25% Extension Allowed by Tech Specs.W/Certificate of Svc ML20138A9511986-03-17017 March 1986 Response Opposing Rl Anthony Contentions Re OL Amend. Contentions Lack Requisite Specificity & Bases Under 10CFR2.714(b).Notice of Appearance & Certificate of Svc Encl ML20138A8851986-03-13013 March 1986 Petition of Rl Anthony & Friends of the Earth for Leave to Intervene & Request for Hearing ML20141N1611986-02-26026 February 1986 Petition of Rl Anthony & Friends of the Earth for Leave to Intervene & Request for Hearing in Opposition to Util Request to Amend Tech Specs 4.6.1.2.d & 4.6.1.2.g to License NPF-39 ML20205K5471986-02-25025 February 1986 Response Opposing Rl Anthony/Friends of the Earth 860205 Petition to Intervene & Request for Hearing Re 851218 Proposed Schedular Amend from Testing Certain Excess Flow Check Valves for 14-wk Period.Certificate of Svc Encl ML20141N1371986-02-24024 February 1986 Petition of Air & Water Pollution Patrol for Leave to Intervene & Request for Hearing ML20214C9141986-02-19019 February 1986 Answer Opposing 860130 late-filed Petition for Leave to Intervene & Request for Hearing by Rl Anthony.Certificate of Svc Encl ML20154D5771986-02-15015 February 1986 Petition of Rl Anthony & Friends of the Earth for Leave to Intervene & Request for Hearing ML20141M8271986-02-12012 February 1986 Petition of Rl Anthony & Friends of the Earth for Hearing & Immediate Stay on Effectiveness & Implementation of Amend 1 to License NPF-39.Util Should Be Required to Suspend Operations on Deadline Until Tests Performed ML20151Y7851986-02-10010 February 1986 Opposition to 860126 Petition by Friends of the Earth for Review of ALAB-828.Intervenor Has Shown No Issue of Fact,Law or Policy Which NRC Should Review.Certificate of Svc Encl ML20151T9881986-02-0505 February 1986 Amend to 860130 Petition of Rl Anthony & Friends of the Earth for Leave to Intervene & Request for Hearing.Extension of 96 Days for Testing Instrumentation Lines Vital to Safe Operation & Shutdown Requested.W/Certificate of Svc ML20094A2831984-11-0202 November 1984 Answer to Intervenor Del-Aware Unlimited,Inc,Revised Contentions V-14 & V-16.Proposed Contentions Should Be Denied & Del-Aware Dismissed as Party.Certificate of Svc Encl ML20094A8691984-10-23023 October 1984 Appeal from Second Partial Initial decision,LPB-84-31 & ASLB 840901 Motion to Set Aside & Reopen Contentions V-3a & 3B & Petition for Stay ML20106C5081984-10-19019 October 1984 Revised Contentions 14 & 16 Re Destruction of Eligible Natl Historic District of Point Pleasant & Adverse Effect on Salinity Levels & Water Quality in Delaware River, Respectively.Certificate of Svc Encl ML20093F0851984-10-0909 October 1984 Response to Limerick Ecology Action Refiled Deferred Offsite Emergency Planning Contentions.Certificate of Svc Encl ML20093D6331984-10-0909 October 1984 Answer Opposing Limerick Ecology Action (Lea) Deferred Offsite Emergency Planning Contentions.Lea Respecified Contentions Should Be Denied.Certificate of Svc Encl ML20093C0991984-10-0101 October 1984 Respec of Offsite Emergency Planning Contentions.Certificate of Svc Encl ML20097C5551984-09-13013 September 1984 Answer Opposing Limerick Ecology Action (Lea) 840906 Respecification of Offsite Emergency Planning Contentions. ASLB Should Dismiss Any Contentions for Which Lea Fails to Proffer Direct Testimony.Certificate of Svc Encl ML20096A7221984-08-29029 August 1984 Response Opposing Air & Water Pollution Patrol 840814 Pleading on Reopening Contention VI-1 Re Welding & Welding Insp Infractions.Certificate of Svc Encl ML20095E4271984-08-21021 August 1984 Answer Opposing late-filed Air & Water Pollution Patrol 840808 New Contention Re Evacuation.Contention Lacks Basis & Specificity & Fails to Show Good Cause for Late Filing. Certificate of Svc Encl ML20095E4401984-08-20020 August 1984 Provides Addendum to Air & Water Pollution Patrol 840816 New Info Contention Re Polyvinyl Chloride.Fifth Criterion Re Breakdown of Polyvinyl Chloride Inadvertantly Omitted.Small Delay in Proceedings Ack for Large Public Good ML20095C0251984-08-16016 August 1984 New Info Contention Re Health Hazard Via Polyvinyl Chloride Fill Used in Reactor Cooling Towers.W/Svc List ML20094K0871984-08-0909 August 1984 Reply to Applicant & Staff Answers to Cepa Safety Contentions.Contentions Should Be Admitted.Certificate of Svc Encl ML20094J7761984-08-0808 August 1984 New Contention That Applicant Must Provide Fully Testable & Capable Emergency Evacuation Plan Prior to Receipt of OL ML20093N2651984-07-27027 July 1984 Answer to Consumer Educ & Protective Assoc 840717 Safety Contentions.Contentions Lack Basis,Concern Ratemaking Matters Outside NRC Jurisdiction & Should Be Denied. Certificate of Svc Encl ML20093E4241984-07-16016 July 1984 Safety Contentions Re Util Inability to Conduct Full & Safe Test Procedures.Certificate of Svc Encl ML20090A6751984-07-10010 July 1984 Answer to New Proposed Contention by Air & Water Pollution Patrol Re Gross Alpha.Certificate of Svc Encl ML20092N1501984-06-26026 June 1984 New Contention That EPA Max Containment Levels for Gross alpha,Ra-226 & Ra-228 Inadequately Verified by Applicant & Nrc.W/Svc List ML20092P7701984-06-19019 June 1984 Motion Opposing Util 840509 Motion for Expedited Partial Decision & Low Power License.Util & NRC Should Certify That All Nonconformance Items & Open Insp Items Corrected & Complete Before Nuclear Fuel Moved Onsite ML20092P7721984-06-18018 June 1984 Motion for Admission of Contentions Based on JW Gallagher & Js Kemper Requesting Remaining Portion of License to Move Fuel to Refueling Floor,Insp & Storage of Fuel & Petition for Stay ML20091R4601984-06-13013 June 1984 Answer Opposing Friends of the Earth 840518 Supplemental Motion for Admission of New,Late Contentions Re Applicant Motion for Expedited Partial Initial Decision & Issuance of Low Power License.Certificate of Svc Encl ML20091C9221984-05-29029 May 1984 Response Opposing Petition by Citizen Action in the Northeast for Late Intervention & Admission of Financial Qualifications Contention.Contentions Lack Requisite Bases & Specificity.Certificate of Svc Encl ML20087M8061984-03-30030 March 1984 New Addition to Contention Re Asbestos Fiber Discharges Into Schuylkill River & Air.Discharge Not Identified Nor Included in Plant Operation Discharge Descriptions.W/Svc List ML20087M6381984-03-28028 March 1984 Response Opposing M Lewis 840314 Motion for New Contention Based on IE Info Notice 84-17 Cooling of Vital Components by Liquid Nitrogen.Certificate of Svc Encl ML20087K8651984-03-23023 March 1984 Motion to Dismiss Particular Onsite Emergency Planning Contentions for Which Discovery Not Provided or No Litigable Basis Shown.Certificate of Svc Encl 1989-07-07
[Table view] Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20247L8591998-05-19019 May 1998 Confirmatory Order Modifying Licenses Effective Immediately Re Thermo-Lag 330-1 Fire Barrier Sys ML20203A1701998-01-30030 January 1998 Exemption from Requirements of 10CFR70.24 for Limerick Generating Station,Unit 1 ML20151L3671997-08-0505 August 1997 Order Prohibiting Involvement in NRC Licensed Activities (Effective Immediately).Orders That SA Blacklock Prohibited from Engaging in Activities Licensed by NRC for 5 Yrs from Date of Order ML20151L5181997-08-0505 August 1997 Order Prohibiting Involvement in NRC Licensed Activities (Effective Immediately) Re SL Nevin Deliberately Falsifying Records of RECW Sample Documentation on 960207 ML20203H6891997-06-0202 June 1997 Transcript of 970602 Enforcement Conference in King of Prussia,Pa ML20083N3971995-04-26026 April 1995 Comment Supporting Proposed GL, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20081B3811995-03-0101 March 1995 Comment Supporting Proposed Suppl 5 to GL 88-20, IPEEE for Severe Accident Vulnerabilities ML20080D8351994-12-22022 December 1994 Exemption from Certain Requirements of 10CFR50,App J Primary Reactor Containment Leakage Testing for Water Cooled Power Reactors Allowing Continuation of Plant Operation within 24 Month Cycle ML20078K1441994-11-0909 November 1994 Exemtion Granted from Requirements of 10CFR73.55(d)(5) Re Returning of Picture Badges Upon Exit from Protected Area Such That Individuals Authorized Unescorted Access Into Protected Area Can Take Badges Offsite ML20058K7381993-12-0303 December 1993 Memorandum & Order CLI-93-25.* Commission Denies State of Nj Petition for Leave to Intervene & Request for Adjudicatory Hearing Filed on 931008.W/Certificate of Svc.Served on 931203 ML20059B0301993-10-22022 October 1993 NRC Staff Response to Commission Questions Posed W/Respect to State of New Jersey Petition for Leave to Intervene & Request for Hearing.* Denies Petition to Intervene & Request for Hearing.W/Certificate of Svc & Notice of Appearance ML20059B1111993-10-20020 October 1993 Philadelphia Electric Co Response to NRC 931014 Order.* State Failed to Demonstrate Entitlement to Hearing to Challenge Util Amend to Permit Util to Receive Shoreham Fuel ML20059A4581993-10-14014 October 1993 Order Requesting Answers to Two Questions Re State of Nj Request for Immediate Action by NRC or Alternatively, Petition for Leave to Intervene & Request for Hearing. Operations Plans for Marine Transportation Withheld ML20057G2141993-10-14014 October 1993 Order.* Requests for Simultaneous Responses,Not to Exceed 10 Pages to Be Filed by State,Peco & Lipa & Served on Other Specified Responders by 931020.NRC May File by 931022. W/Certificate of Svc.Served on 931014 ML20059B1291993-09-14014 September 1993 Affidavit of Jh Freeman.* Discusses Transfer of Slightly Used Nuclear Fuel from Shoreham Nuclear Power Station to Limerick Generating Station.W/Certificate of Svc & Notice of Appearance ML20045D8121993-06-14014 June 1993 Comment Supporting Proposed Rules 10CFR50 & 54 Re FSAR Update Submittals ML20126F2721992-12-21021 December 1992 Comment Endorsing Positions & Comments of NUMARC & BWROG Re Draft GL, Augmented Inservice Insp Requirments for Mark I & Mark II Steel Containments,Refueling Cavities & Associated Drainage Sys ML20062C6561990-10-22022 October 1990 Affidavit Requesting Withholding of Summary Rept on Evaluation of Recirculation Nozzle to Safe End Weld Indication & Proposed Disposition to Permit Unit 1 Cycle 4 Operation, from Public Disclosure,Per 10CFR2.790 ML20006D3821990-02-0606 February 1990 Comment on Proposed Rule 10CFR2 Re Policy & Procedures for Enforcement Actions;Policy Statement.Util Uncertain as to Whether Changes Necessary ML20246J4521989-08-30030 August 1989 Memorandum & Order (Terminating Proceeding).* Terminates Proceeding Per Settlement Agreement Between Limerick Ecology Action,Inc & Licensee.W/Certificate of Svc.Served on 890831 ML20246F1011989-08-25025 August 1989 Joint Motion for Termination of Proceedings.* Board Moved to Accept Encl Settlement Agreement,Dismiss Limerick Ecology Action,Inc (Lea) Contention W/Prejudice,Dismiss Lea as Party to Proceeding & Terminate Proceeding ML20246F0121989-08-25025 August 1989 Memorandum & Order CLI-89-17.* Staff Authorizes Issuance of Full Power License to Licensee to Operate Unit 2 After Requisite Safety Findings Under 10CFR50.57 Completed. W/Certificate of Svc ML20246F1471989-08-25025 August 1989 Settlement Agreement.* Certificate of Svc Encl ML20246E8351989-08-24024 August 1989 Second Supplemental Response of Intervenor Limerick Ecology Action,Inc to Memorandum & Order of Commission & Memorandum & Order of 890807.* W/Certificate of Svc ML20246E3431989-08-22022 August 1989 Opposition of Intervenor Limerick Ecology Action,Inc to Motion by Licensee Philadelphia Electric Co to Set Schedule for Discovery & Hearing.* Requests That Schedule Be Replaced W/More Reasonable Schedule,As Proposed.W/Certificate of Svc ML20246C0271989-08-18018 August 1989 Notice of Appointment of Adjudicatory Employee.* Informs That D Nash Appointed as Commission Adjudicatory Employee to Advise Commission on Issues in Proceeding.W/Certificate of Svc.Served on 890818 ML20246B7721989-08-17017 August 1989 Correction of Memorandum & Order of 890815.* Advises That Refs to 49CFR2.730(c) on Page 1 & 49CFR2.710 & 49CFR2.711 on Page 2 Should Be Corrected to Read as 10CFR2.730(c),2.710 & 2.711,respectively.W/Certificate of Svc.Served on 890818 ML20246D7411989-08-17017 August 1989 Transcript of 890817 Meeting in Rockville,Md Re Discussion of Full Power OL for Facility.Pp 1-58.Supporting Documentation Encl ML20246B7751989-08-16016 August 1989 Memorandum & Order.* Denies Rl Anthony 890623 Request for Hearing for Intervention in Remand Proceeding & for Stay of Low Power Authorization.W/Certificate of Svc.Served on 890816 ML20246B7571989-08-16016 August 1989 Order Responding to Limerick Ecology Action Motion for Reconsideration.* Denies Motion to Reconsider,Stay,Suspend or Revoke 890707 Order on Basis That Order Appropriate.W/ Certificate of Svc.Served on 890816.Re-served on 890818 ML20246B7931989-08-15015 August 1989 Memorandum & Order (Request for Expedited Answer).* Denies Licensee 890811 Request for Expedited Answer from NRC & Limerick Ecology Action on Basis That Request Lacks Good Cause.W/Certificate of Svc.Served on 890816 ML20245H8491989-08-14014 August 1989 Notice of Change of Address.* Advises of Council Change of Address for Svc of Documents ML20245H8061989-08-14014 August 1989 Supplemental Response of Intervenor Limerick Ecology Action, Inc to Memorandum & Order of Commission & to Memorandum & Order of 890807.* Requests Further Extension of Time in Which to Reply.Certificate of Svc Encl ML20245H5991989-08-11011 August 1989 Memorandum & Order (Terminating Proceeding).* Dismisses Graterford Inmates Contention Re Adequacy of Training for Drivers Responsible for Evacuating Graterford & Terminates Proceeding.Certificate of Svc Encl.Served on 890814 ML20245H7341989-08-10010 August 1989 Motion by Licensee Philadelphia Electric Co to Set Schedule for Discovery & Hearing & Request for Expedited Answer to This Motion.* Divergence in Positions of Respective Parties Emphasizes Need to Conclude Proceeding.W/Certificate of Svc ML20245F7161989-08-0909 August 1989 Reply by Licensee Philadelphia Electric Co to Response of Intervenor Limerick Ecology Action,Inc to Memorandum & Order of Commission Dtd 890726.* Environ Benefits for Operating Unit 2 Outweigh Small Risk of Severe Accident ML20245F7511989-08-0909 August 1989 Reply by Licensee Philadelphia Electric Co to NRC Staff Response to Commission Questions.* Commission Should Rely on Licensee Cost Analysis in Response to Question 5 & Rc Williams Affidavit.W/Certificate of Svc ML20245F7341989-08-0909 August 1989 NRC Staff Response to Commission Memorandum & Order of 890807.* Advises That NRC Will Provide Comments on Limerick Ecology Action 890814 Filing Prior to Commission Meeting Scheduled for 890817.W/Certificate of Svc ML20245F7291989-08-0808 August 1989 Affidavit.* Discusses Costs Incurred While Plant Inoperable. Allowance for Funds Used During Const,Security,Maint & Operational Costs Considered Proper for Calculating Costs for Delay ML20248D9241989-08-0707 August 1989 Memorandum & Order.* Extends Limerick Ecology Action Response Deadline to 890814 to Respond to Five Questions Re Severe Accident Mitigation Design Alternatives.W/Certificate of Svc.Served on 890807 ML20248D7871989-08-0303 August 1989 Correction for NRC Staff Response to Commission Questions.* Forwards Corrected Page 5 to NRC Response to Questions Filed on 890802,deleting Phrase by Nearly Factor 2.5 in Next to Last Line.W/Certificate of Svc ML20248D5671989-08-0202 August 1989 Affidavit of SE Feld.* Advises That Author Prepared Response to Question 5.W/Certificate of Svc ML20248D5981989-08-0202 August 1989 Response by Licensee Philadelphia Electric Co to Commission Request for Comments by Memorandum & Order Dtd 890726.* Licensee Requests Commission Issue Full Power OL for Unit 2 Conditioned Upon Outcome of Pending Litigation ML20248D7111989-08-0202 August 1989 Response of Intervenor Limerick Ecology Action,Inc to Memorandum & Order of Commission Dtd 890726.* Commission Order Fails to Provide Intervenor Adequate Time for Response & Should Therefore Be Revoked.W/Certificate of Svc ML20248D5391989-08-0202 August 1989 Affidavit of MT Masnik.* Advises That Author Prepared Response to Question 3 ML20248D5311989-08-0202 August 1989 Affidavit of Rj Barrett.* Advises That Author Prepared Response to Question 2 ML20248D4971989-08-0202 August 1989 Joint Affidavit of Gy Suh & CS Hinson.* Advises That Authors Prepared Responses to Questions 1 & 4 ML20248D4721989-08-0202 August 1989 NRC Staff Response to Commission Questions.* Provides Info for Use in Commission Effectiveness Review of Plant Full Power Operation,Per Commission 890726 Memorandum & Order. Supporting Affidavits Encl ML20248D6451989-08-0202 August 1989 Affidavit.* Advises That Author Read Responses to Request for Comments by NRC & Knows Contents.W/Certificate of Svc ML20245J1321989-07-27027 July 1989 Transcript of 890727 Meeting in Rockville,Md Re Facility Severe Accident Mitigation Issues.Pp 1-130.Supporting Info Encl 1998-05-19
[Table view] |
Text
_
n
- '.! ',Id
~
M-nOf.KETED usunc UNITEE STATES OF AMERICA 82 ED 10 PS:56 L NUCLEAR REGULATORY COMMISSION
~
OFFICE OF SECRETAfit' Before the Atomic Sar ty and Licensing BoarctKETlHG A SERVN.
e BRANCH In the Matter of
)
)
Philadelphia Electric Company
)
Docket Nos. 50-352
)
5 0 - 3.5.3.,
(Limerick Generating Station,
)
Units 1 and 2)
)
APPLICANT'S ANSWER TO RESPONSE OF FRIENDS OF THE EARTH PROPOSING TEN NEW CONTENTIONS l
l Preliminary Statement On July 7,
1982, Friends of the Earth in the Delaware Valley
(" FOE") filed a pleading which proposes the admission of ten new contentions relating to the analysis in the Limerick Generating Station Final Safety Analysis Report
("FSAR") of potential hazards from offsite explosions and releases of toxic fumes.
The pleading purports to respond to a portion of the Special Prehearing Conference Order
("SPCO")
dated June 1,
1982 by the Atomic Safety and Licensing Board
(" Licensing Board" or " Board") in which the Board initially rejected Contention V-3 for lack of specificity.
The Board permitted FOE to amend this I
contention by filing within 30 days
" contentions which i
allege specific deficiencies which FOE believes exist in the FSAR analysis" of offsite fires and explosions. 1/
1/
SPCO at 146 (emphasis added).
8208120121 820809 PDR ADOCK 05000352 G
PDR
~.
2-t i
In Applicant's
- view, several of the new proposed i
contentions filed by FOE widely exceed the scope of the j
original contention which the Board rejected but permitted l
FOE to replead with greater specificity.
Thus, nothing in
{
this most recent filing indicates why particular contentions relating to the alleged potential for toxic releases from f
industrial accidents are deemed to fall within the scope of i
the original contention.
In any event, all of the proposed contentions still fail to meet the requirements under the I
Commission's Rules of Practice for adequate
" bases" and
" reasonable specificity" inasmuch as no explanation is given as to why the analysis of the particular matters they 3
i address in the FSAR is inadequate or incorrect.
Argument Each of the proposed contentions will be discussed seriatim below.
Initially, however, it should be noted that FOE has improperly expanded the limited opportunity granted by the Board to provide bases and reasonable specificity for
]
proposed Contention V-3, which alleged possible hazards from 1
fire and explosion resulting from a rupture of gas and liquid refined petroleum pipelines and also alleged the
)
potential for fire and explosion from certain hazardous i
materials stored at two particular industrial plants or 1
l transported by railroad.
The new proposed contentions,
- however, improperly go beyond the potential for fire and explosion, the subject of the original contention, to address control room habitability issues, e.g.,
they seek to i
1
,._n w
- - - - - - - - - - - - - - - - - - - - ~ ~ - - - - ~ - - - - - ~ - - ~ ~
._ explore the effect of releases of " toxic fumes" from plastic manufacturing plant fires 2/ and possible releases of vinyl chloride.-3/
These particular contentions or portions thereof should be denied as inexcusably late and beyond the scope of the Board's authorization.
Additionally, none of the specific contentions proposed by FOE meets the standard for an acceptable contention.
FOE has failed to allege " specific deficiencies" 4/
in the FSAR analysis as required by the Board.
Inasmuch as the Board has given FOE an opportunity to provide reasonable specificity in order to cure deficiencies in its original contention, it follows that the degree of specificity required at this juncture is even greater. 5 Unlike other contentions where the record of the application may not be complete, these contentions relate to aspects covered by the FSAR long available to FOE.
See generally Cleveland Electric Illuminating Company (Perry Nuclear Power Plant, Units 1 & 2), LBP-81-24, 14 NRC 175, 182-83 (1981).
l With these principles in mind, Applicant now addresses the proposed contentions.
I I
2/
See Proposed Contention 8.
J/
See Contentions 2 and 6.
These matters are inter-spersed in a number of the other proposed contentions.
-4/
SPCO at 146.
5/
Thus, Applicant believes that the test cited by the Staff for establishing adequate bases for these contentions discussed in its Reply at page 4 should be applied to the contentions as now proposed, rather than at some later stage.
l l
?
(
_4 -
Coatention V-3.1.
This contention deals with the potential hazard to Limerick's switchyard and diesel generators resulting from missiles generated by an explosion of a propane car.
While the proposed contention asserts that a " drastic threat" exists, no basis is given for any disagreement with the specific analysis of missile generation from such an explosion as discussed in FSAR Section 3.5.1.5. or with the design of the diesel generators as related to missile protection. 6/
Thus, there has been no showing by FOE that the Limerick design is inadequate when compared to the requirements of the Commission's regulations to provide the necessary protection against external missile generation.
Contention V-3.2.
This proposed contention raises the potential for releases of chlorine and vinyl chloride fumes to the Limerick control room. 7/
Contrary to FOE's allegation, FSAR Section 6.4 specifically explains the design bases which
" preclude the effects of a chlorine 6/
FOE points to no Commission requirement that the switchyard must be protected against missiles.
To the contrary, General Design Criterion 17 does not require single failure protection for the switchyard.
Loss of offsite power is assumed for analysis of transient and accident situations.
t 7/
Initially, this contention asserts that FSAR Table 2.2-6 is flawed because it fails to indicate the frequency of propane rail shipments.
No reason for this assertion is given.
Explosion of a propane tank car is in fact a design basis event analyzed in FSAR Sections 2.2.3.1.1 and 3.5.1.5.
As its content indicates, Table 2.2-6 pertains to hazardous chemical releases, not propane or other inflammable substances.
\\
. release accident onsite or offsite from affecting the habitabili of the control room." 8/
- Moreover, as the proposed contention itself acknowledges, hazardous chemicals whica pose a potential threat to control room habitability have been identified and analyzed in FSAR Table 2.2-6.
As discussed in FSAR Section 2.2.3.1.3, the 21 chemicals listed in Table 2.2-6 constitute an inclusive list of all hazardous chemicals which, if spilled, could possibly exceed threshold limit values in the control room.
No basis is shown for any defect in this discussion and analysis in the FSAR.
Contention V-3.3.
This proposed contention deals with explosion and fire resulting from a ruptured pipeline.
FSAR Section 2.2.3.1.1 expressly states that it has considered the " worst-case pipeline accident" that could occur near Limerick and presents the results of such a postulated occurrence.
No basis is given in the proposed contention for disputing this fact, or for challenging the validity of the analysis of possible missile generation in FSAR Section 3.5.1.5.
There is no showing that there will be any multiple explosions or that any postulated combination of explosions could be worse than the occurrence analyzed in the FSAR.
While FOE states there is no consideration of the
" syphon effect," it has overlooked the specific discussion of possible siphoning in FSAR Section 2.2.3.1.1, which concludes that siphoning will not occur because air would 8/
FSAR Section 6.4.1.
See generally FSAR Sections 6.4.2.2 and 6.4.3.2.
l l
l
- i enter the pipeline and break the siphon at the high points.
FOE provides no plausible scenario to the contrary for such an occurrence.
The proposed contention is therefore totally lacking in any basis.
- Moreover, FSAR Section 2.2.3.1.4 considers potential adverse effects of radiant heat load and smoke generation resulting from the same " worst-case" event.
No facts are cited by FOE to dispute the conclusion in that section that the " radiant heat effects of such fire are negligible" and that control room ventilation design provides adequate isolation.-9/
Thus, potential impacts from such events, as l
l discussed above in answer to Contention V-3.1, have been j
fully considered.
Contention V-3.4.
This proposed contention asserts l
that petroleum fumes and natural gas in shallow strata which have leaked from pipelines have not been evaluated in the FSAR.
FOE ignores the fact, however, that the FSAR, as i
[
discussed above, has in fact considered the " worst case" gas l
pipeline rupture and explosion.
Resultant missile generation and fire have similarly been considered.
FOE has d
failed to assert any basis which would support the proposition that its theoretical hypothesis could possibly result in a situation beyond those considered in the FSAR.
-9/
See also FSAR Section 2.2.3.2, regarding radiant heat load from a propane tank car fire and smoke from a pipeline fire.
Contention V-3.5.
This contention asserts that no consideration is given in the FSAR to radiant heat from a gas and petroleum fire en
- woodland, roads, diesel generators, fuel storage and other facilities.
The proposed contention mentions worker access and safety.
Obviously, all personnel necessary to bring the Limerick plant to a safe shutdown, if necessary, are onsite at all times.
In
- fact, safe shutdown must be and is achieved from the i
continuously manned control room.10/
Contrary to FOE's assertion, radiant heat load resulting from such fires is expressly considered in FSAR Section 2.2.3.1.4, which concludes that the impact would be roughly equivalent to solar heat at midday.
No basis is given by FOE for any disagreement with this analysis, i
Contention V-3. 6.
This proposed contention deals with the discussion of chemical releases in the FSAR.
FOE refers to the evaluation of potentially hazardous releases in FSAR Table 2.2-6, but states no basis for its conclusion that control room personnel would be threatened by any such release.
As noted above in the response to proposed Contention V-3.2, no basis is stated for any disagreement with the control room habitability analysis in FSAR Section 6.4.
nor with the means Applicant, will utilize to assure l
control room habitability.
Further, nothing is stated with l
regard to '
the Hooker Chemical Company (formerly the l
M/
See 10 C.F.R.
Part 50, Appendix A,
General Design Criterion 19.
l
a Firestone plant) in particular as a basis for disputing the FSAR analysis.
/
11 J
Contention V-3.7.
This contention asserts that there is no evaluation in the FSAR u.
toxic and flammable materials at nearby industrial plants.
This assertion is simply and clearly incorrect.
FSAR Section 2.2.2.1 expressly states that all industries within five miles of the Limerick facility have been identified and analyzed.
The specific plants named by FOE are referenced in this analysis and on the related FSAR Table 2.1-17.
Only the J
Hooker Chemical Company was deemed to have significant quantities of hazardous materials stored on site such as to i
require detailed analysis.
No basis for disputing this conclusion in the FSAR has been shown.
Contention V-3.8.
This proposed contention also relates to the potential for the release of toxic fumes as a i
hazard to the Limerick plant.
As noted in the discussion above relating to proposed Contention V-3.2 and V-3. 6, all i
local industries near the Limerick facility have been identified and analyzed to determine the existence of M[ In
- fact, FSAR Section 2.2.2.1 states that all industries within five miles of Limerick have been i
evaluated and that the Hooker Chemical Company is "the l
only establishment near the Limerick Generating Station which has significant quantities of hazardous material stored onsite."
FOE may be unaware that the plant which was previously operated by the Firestone Rubber j
and Tire Company is now operated by the Hooker Chemical l
Company, whose operations are expressly considered in l
FSAR Section 2.2.3.1.3 and charted on Tables 2.2-1 and 2.2-6.
i l
hazardous materials used or stored onsite.12/
Possible exposure to hazardous chemical releases has been fully analyzed and mitigating action taken where necessary to assure control room habitability.13
Any potential releases have been anticipated and accounted for in the discussion of the safety design features necessary for control room habitability.E#
Contention V-3.9.
This proposed contention asserts the possibility of sequential explosions starting with an accidental explosion at the Pottstown Trap Rock Quarry.
FOE is simply incorrect in asserting that the FSAR does not consider the quantity of explosives on hand at the quarry or how often they are used.
FSAR Section 2.2.2.1 expressly states:
l_2_/
FSAR Section 2.2.2.1.
M/
FSAR Section 2.2.3.1.3; Table 2.2-6.
-14/
FSAR Section 6.4.
If FOE is alleging that the FSAR must consider the simultaneous occurrence of a
radiological emergency and a major industrial disaster, its contention is beyond the scope of the Commission's requirements.
Under the emergency planning provisions of 10 C.F.R.
S50.47 and Appendix E thereto or in NUREG-0654, there is no requirement for contingency plans based upon the simultaneous occurrence of a
radiological emergency and major industrial disasters.
It is unnecessary to consider the possibility of such multiple disasters, given the extreme improbability of such events.
As the Commission stated in the San Onofre proceeding, "the proximate occurrence" of a
radiological emergency and an offsite disaster that could disrupt normal emergency planning
" appears sufficiently unlikely" that it need not be considered in licensing proceedings.
Southern California Edison Company (San Onofre Nuclear Generating Station, Units 2 and 3), CLI-81-33, 14 NRC 1091, 1092 (1981).
l The industry nearest the site is the Pottstown Trap Rock
- Quarry, Inc.
Operations at the Quarry include the detonation of explosives in the process of quarrying stone.
However, the use of explosives is infrequent, and only enough explosives are brought to the quarry for one particular application.
There are no explosives stored on the quarry site.
No basis is shown in the-proposed contention for disputing this analysis nor has FOE demonstrated a mechanism for initiating the sequential accidents it has postulated in this proposed contention.
In any event, as discussed above in response to proposed Contentions V-3.1 and V-3.3, the potential for missile generation affecting the
- plant, however initiated, has been fully considered in FSAR Section 3.5.1.5 and related Table 3.5-5.
Contention V-3.10.
This proposed contention alleges that the FSAR is deficient in failing to consider the unavailability of cooling water necessary for a
safe shutdown as a result of a rupture of tunnels and pipes under railroad tracks from tank car explosions.
To the contrary, as noted above in the response to proposed Contentions V-3.1, V-3.3 and V-3.9, the FSAR has fully considered all potential impacts by missile generation upon structures and components necessary for a safe shutdown of the Limerick plant.
Since the spray pond is the ultimate heat sink for the facility 15/
and has sufficient water storage for 30 days even without makeup from the Schuylkill River, the 1_5/
See FSAR Section 2.2.2.3.1.5.
0 pipeline rupture postulated by FOE is immaterial to safe shutdown.
FOE has made no showing to the contrary.
I Conclusion For the reasons discussed
- above, several of the contentions proposed by FOE are new and are therefore I
inexcusably late.
They are clearly beyond the scope of its original contention which the Licensing Board permitted FOE to amend in order to provide adequate bases and reasonable specificity.
In any event, all of the proposed contentions fall far short of providing the requisite bases and specificity, particularly where a party has been given an opportunity to amend its proposed contentions to provide sucn specificity.
Each of the ten proposed contentions should therefore be denied.
Respectfully submitted, CONNER & WETTERHAHN, P.C.
/
i Troy B. Conner, Jr.
i Mark J. Wetterhahn l
Robert M.
Rader Counsel for the Applicant August 9, 1982 t
i
.