Forwards North Anna Power Station Unit 2 Inservice Insp Program for Second Insp Interval,Vol 1,Inservice Insp Program for Components & Component Supports,Rev 0
ML20058G049
Person / Time
Site: North Anna Dominion icon.png
Issue date: 11/01/1990
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20058G052 List:
References
90-662, NUDOCS 9011090318
Download: ML20058G049 (2)


Text

- _- . .- . - -. . . . . _ - - . . ~ . _ . . . .

Ig. i l

s.

{

~ .

, , j Y1HOIN1A E1.ECTNIC AND POWEH COMPANY  !

N!CitMONU.YIMOINIA 200 61 s

November 1,1990

.U.S. Nuclear Regulatory Commission Serial No. 90 662

. Attention: Document Control Desk NES/ISI/EWT:Jbl Washington, D.C. 20555 Docket Nos. 50 339 License Nos. NPF-7 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY 1 NORTH ANNA POWER STATION UNIT 2 1 SECOND TEN-YEAR INTERVAL l INSERVICE INSPECTION PROGRAM FOR COMPONENTS.. AND COMPONENT SUPPORTS j

.In accordance with 10 CFR 50.55a(g), Virginia Electric and Power Company. submits .

.the inservice Inspection Program for the second ten ysar Inservice inspection interval .:

for North Anna Unit 2. The enclosed document addresses the programmatic aspects.

of inservice examinations of components and component supports and system  !

pressure tests. 'i The program has been written in accordance with the requirements of the 1986 Edition of Section XI of the ASME Boller and Pressure Vessel Code. However, because the .

unit was not designed to completely meet the detailed -inservice inspection requirements of Section XI, we are requesting relief from certain inspection and testing i requirements which have.been determined to be impractical, in accordance with 10 - 1 CFR 50.55a(g)(5), our requests for specific relief from the Code requirements are ,

included in the enclosed program.

The North Anna Unit 2 inservice inspection program plan (as required by IWA 2420)  ;

Identifying the specific components and component supports selected for examination  ;

during the second interval will be provided by December 14,1990. )

. The second ten year inspection interval for North Anna Unit 2 begins on December 14, *

1990, it is'our intent to implement this revised inspection program at that. time.

Therefore, to facilitate your review of our program,'we will provide one set of reference'  !

drawings under separate cover to the NRC Project Manager. We will also provide one .

~

copy of the program and one set of drawings to the NRC's reviewers at EG&G in Idaho.  !

The enclosed North Anna Unit 2 second intervalinservice inspection program and the d'

. . relief requests ~ contained therein have been reviewed and approved by_the Station Nuclear Safety and Operating Committee. ,

.k D(S T.

901109031e 9o11o1 W.M j fe~d i gDR ADOCK05oog9 y7 ll 9 - .. .'

6 Should you have any questions or require additionalinformation, please contact us.

ery truly yours, Y .Lc')o (

. \3M0 W. L. Stewart Senior Vice President - Nuclear Enclosures

1. North Anna Unit 2 Second Interval inservice inspection Program for Components f and Component Supports, Revision 0, October,1990. (9 Copies) cc: U.S. Nuclear Regulatory Commission Region 11 101 Marietta Street, N.W.

Suite 2900 Atlanta, Georgia 30323 I Mr. M. S. Lesser NRC Senior Resident inspector North Anna Power Station

+

M