MONTHYEARML20211A9981999-07-12012 July 1999 Draft,Probabilistic Safety Assessment, Risk Info Matrix, Risk Ranking of Systems by Importance Measure ML20207A7181999-05-13013 May 1999 Safety Evaluation Supporting Amends 134 & 132 to Licenses DPR-80 & DPR-82,respectively ML20206H2861999-05-0303 May 1999 Safety Evaluation Supporting Amends 133 & 131 to Licenses DPR-80 & DPR-82,respectively ML20206D5661999-04-29029 April 1999 Safety Evaluation Supporting Amends 132 & 130 to Licenses DPR-80 & DPR-82,respectively ML20205B6061999-03-26026 March 1999 Safety Evaluation Supporting Amends 131 & 129 to Licenses DPR-80 & DPR-82,respectively DCL-99-045, 1998 Annual Financial Rept for PG&E Corp. with1998-12-31031 December 1998 1998 Annual Financial Rept for PG&E Corp. with ML20249B6881998-06-11011 June 1998 Safety Evaluation Supporting Amends 128 & 126 to Licenses DPR-80 & DPR-82,respectively ML20249B5961998-06-0505 June 1998 Safety Evaluation Supporting Amends 127 & 125 to Licenses DPR-80 & 82,respectively ML20249B6041998-06-0505 June 1998 Safety Evaluation Supporting Amends 126 & 124 to Licenses DPR-80 & DPR-82,respectively ML20248D4041998-05-28028 May 1998 Safety Evaluation Supporting Amends 125 & 123 to Licenses DPR-80 & DPR-82,respectively ML20248L8761998-03-12012 March 1998 Safety Evaluation Supporting Amends 124 & 122 to Licenses DPR-80 & DPR-82,respectively ML20197B7091998-02-27027 February 1998 Safety Evaluation Supporting Amends 123 & 121 to Licenses DPR-80 & DPR-82,respectively ML20203J5141998-02-26026 February 1998 LER 98-S02-00:on 980127,following Security Sys Failure Compensatory Measures Were Not Implemented within 10 Minutes Due to Personnel Error.Caused by Failed Disk Drive. Replaced Disk Drives,Reviewed Security Computer Maint Plans ML20203L4881998-02-17017 February 1998 Safety Evaluation Supporting Amends 122 & 120 to Licenses DPR-80 & DPR-82,respectively ML20203L2981998-02-13013 February 1998 Safety Evaluation Supporting Amends 121 & 119 to Licenses DPR-80 & DPR-82,respectively ML20203M4321998-02-0303 February 1998 Safety Evaluation Supporting Amends 120 & 118 to Licenses DPR-80 & DPR-82,respectively ML20217G5151997-12-31031 December 1997 1997 PG&E Corp Annual Rept ML20205F5881997-07-24024 July 1997 Decommissioning Cost Estimate for Diablo Canyon Power Plant,Units 1 & 2 ML20149H4281997-07-17017 July 1997 Corrected SE Re Amends 119 & 117 to Licenses DPR-80 & DPR-82,respectively ML17264A9381997-07-10010 July 1997 Deficiency Rept Re Potential Safety Hazard Associated w/FM-Alco 251 Engin,High Pressure Fuel tube-catalog: 4401031-2 in Which Dual Failure Mode Exists.Caused by Incorrect Forming Process ML17083C6231997-01-31031 January 1997 Rev 4 to WCAP-13705, W Setpoint Methodology for Protection Sys Diablo Canyon Units 1 & 2,24 Month Fuel Cycle Evaluation. ML16343A4741997-01-31031 January 1997 WCAP-11595,Rev 2, W Improved Thermal Design Procedure Instrument Uncertainty Methodology Diablo Canyon Units 1 & 2 24 Month Fuel Cycle Evaluation. ML16342D5351997-01-31031 January 1997 WCAP-14826, Instrumentation Calibr & Drift Evaluation Process for Diablo Canyon Units 1 & 2,24 Month Fuel Cycle Evaluation. ML18102B6911997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Diablo Canyon Power Plant,Units 1 & 2.W/970218 Ltr ML16342D5541996-12-31031 December 1996 Non-proprietary Nrc/Util Meeting on Model 51 SG Tube Integrity & ARC Methodology. DCL-97-045, Pacific Gas & Electric Co 1996 Annual Rept1996-12-31031 December 1996 Pacific Gas & Electric Co 1996 Annual Rept ML20129G9351996-10-25025 October 1996 Safety Evaluation Supporting Amends 117 & 115 to Licenses DPR-80 & DPR-82,respectively ML20129G7771996-10-25025 October 1996 Safety Evaluation Supporting Amends 116 & 114 to Licenses DPR-80 & DPR-82,respectively ML20129J4311996-10-18018 October 1996 Safety Evaluation Approving Corporate Restructuring & Establishment of Holding Company Under Temporary Name PG&E Parent Co.,Inc of Which PG&E Would Become Wholly Owned Subsidiary ML20117E5541996-08-19019 August 1996 Safety Evaluation Supporting Amends 115 & 113 to Licenses DPR-80 & DPR-82,respectively ML20116B8491996-07-22022 July 1996 Revised Special Rept SR 95-03:on 950621,EDG 1-2 Failed to Load During Surveillance Testing.Caused by Loose Fuse Holder Contact Clip.Retensioned Loose Fuse Holder Contact Clip & Tightened Loose Wire Connection ML20116B8521996-07-22022 July 1996 Revised Special Rept SR 95-04:on 950718,EDG 1-2 Load Swings Occurred.Caused by Defective Electronic Governor Stability Potentiometer.Replaced Electronic Governor DCL-96-155, Revised Special Rept SR 95-05:on 950806,EDG 1-2 to Achieve Rated Output Frequency within TS Limits.Caused by Degraded Electronic Governor Performance.Replaced Electronic Governor Motor Operated Potentiometer & Electronic Governor1996-07-22022 July 1996 Revised Special Rept SR 95-05:on 950806,EDG 1-2 to Achieve Rated Output Frequency within TS Limits.Caused by Degraded Electronic Governor Performance.Replaced Electronic Governor Motor Operated Potentiometer & Electronic Governor ML20117K4671996-05-28028 May 1996 Safety Evaluation Supporting Amends 113 & 111 to Licenses DPR-80 & DPR-82,respectively ML20236Q2611996-04-15015 April 1996 Rev 0 to DCP M-050284, Design Change Package for Installation of CCW Surge Tank Pressurization Sys for Unit 1 ML20094M6251995-11-21021 November 1995 Final Part 21 Rept of Investigation & Analysis of Suspect Fasteners Event 29257.B&G-Cardinal Discontinued Using Heat Treatment Equipment at Cardinal Facility Until Such Time That Satisfactory Mods Made to Hardware & Procedures ML20092F3411995-08-23023 August 1995 Corrected SE Supporting Amends 107 & 106 to Licenses DPR-82 & DPR-80,respectively ML18064A8631995-08-14014 August 1995 LER 95-004-00:on 950714,determined That Redundant DG Circuits Not Separated Per App R Due to Insufficient App R Program Documentation.Hourly Fire Tour Established in EDG 1-1 Room & Review of LERs for App R Completed ML20082H9121995-04-11011 April 1995 Safety Evaluation Supporting Amends 99 & 98 to Licenses DPR-80 & DPR-82,respectively ML18100B2981994-05-24024 May 1994 LER 94-014-00:on 940426,SG 1-2 Automatically Started When Two Indicating Light Sockets Shorted Together Due to Personnel Error.Description of Event & Lessons Learned Will Be Published in Operations Incident Summary.W/940524 Ltr ML20063M1481994-03-0303 March 1994 Safety Evaluation Supporting Amends 90 & 89 to Licenses DPR-80 & DPR-82,respectively ML20063M1111994-03-0202 March 1994 Safety Evaluation Supporting Amends 89 & 88 to Licenses DPR-80 & DPR-82,respectively ML20063M0431994-02-24024 February 1994 Safety Evaluation Supporting Amends 88 & 87 to Licenses DPR-80 & DPR-82,respectively ML16342C3091993-12-31031 December 1993 Monthly Operating Repts for Dec 1993 for Dcnpp Units 1 & 2 ML16342A3691993-08-31031 August 1993 Revised MOR for Aug 1993 for Dcnpp Unit 1 ML16342A3681993-07-31031 July 1993 Revised MOR for July 1993 for Dcnpp Unit 1 ML20046A6611993-07-21021 July 1993 Cycle 6 Startup Rept. ML20059G6811993-06-30030 June 1993 Revised MOR for June 1993 for Dcnpp Unit 1 ML20045D1731993-05-31031 May 1993 Monthly Operating Repts for May 1993 for Diablo Canyon,Units 1 & 2 ML16342A3671993-05-31031 May 1993 Revised MOR for May 1993 for Dcnpp Unit 1 1999-07-12
[Table view] |
Text
.(I
~
i
September 17, 1982 Y$
SECY-82-383 s, v[f8 ADJUDICNibRY ISSUE (Affirmation)
For:
The Commissioners From:
Martin G. Malsch, Deputy General Counsel
Subject:
DIABLO CANYON PHYSICAL SECURITY -- PURGING OF CLASSIFIED MATERIAL IN ALAB-653 Discussion:
By Order dated July 29, 1982 the Commission notified the parties to the Diablo Canyon Physical Security proceeding that it was "considering expunging the classified material from ALAB-653 and the underlying record pursuant to 10 CFR 2.913."
The Commission in that Order provided the parties an opportunity to comment "on whether expunction of the classified materia would prejudice them."
No g
party commented.
We recommend that Analysis hi L
$f.
5 CONTACT:
Rick Levi, OGC 4-1465 Informatiaa in thk record was de;eted in 2CCCrj3.::0 With if ein! cf In.'ctm3 tion nCl, U :P.Stf rs _
FO A-f/fJI._ _.
9309220221 930428 L'
PDR FOIA I
GILINSK92-436 PDR V
(5
.f
[
a 2
i
^'"
awe.-..-
..,_,_s.
l' r
OGC has reviewed does not believe that k).
/
G ),i _
l i
GC 'does nbt~believe that e
it can be asstuned tha't i
i o
^
' ' ' ~ - -
h--
4 b
I l
I I
j i
e
4
.c e
3
(-
i 1
[
it is' questionable ~whether Since we do not believe that i
recommend'that..
we i
L I
ea
,'r 5
4 Recommendation:
(
p Martin G. Malsch Deputy General Counsel
Attachment:
Order Commissioners' comments or consent should be provided directly to the office of the Secretary by c.c.b. Friday, October 1, 1982.
Commission Staff Office comments, if any, should be submitted to the Commissioners NLT Friday, September 24, 1982, with an information copy to the Office of the Secretary.
If the paper is of such a nature that it requires additional time for analytical review and comment, the Commissioners and the Secretariat should be apprised of when comments may be expected.
This paper is tentatively scheduled for affirmation at an Open Meeting during the Week of October 4, 1982.
Please refer to the appropriate Weekly Commission Schedule, when published, for a specific date and time.
DISTRIBUTION:
Commissioners OGC OPE OIA SECY l}}