Partially Withheld Commission Paper Re Hearing Requests on Extension of Const Completion Dates for WPPSS 1 & 2
ML20057B545
Person / Time
Site: Columbia, Washington Public Power Supply System  Energy Northwest icon.png
Issue date: 09/14/1982
From: Bickwit L
NRC OFFICE OF THE GENERAL COUNSEL (OGC)
To:
Shared Package
ML20049A457 List: ... further results
References
FOIA-92-436 SECY-82-377, NUDOCS 9309220216
Download: ML20057B545 (4)


Text

- _ _ _ _

i pm htsg, t

.5' 1

,8, SECY-82-377 September 14, 1982 ADJUDICATORY ISSUE (Affirmation)

For:

The Commission From:

Leonard Bickwit, Jr., General Counsel

Subject:

HEARING REQUESTS CONCERNING EXTENSION OF CONSTRUCTION COMPLETION DATES FOR WASHINGTON PUBLIC POWER SUPPLY SYSTEM NUCLEAR PROJECT NOS. 1& 2 Discussion:

The Commission has received two hearing requests regarding the extension of the construction completion dates for two of the units being constructed by the Washington Public Power Supply System (WPPSS) at its site in Benton County, Washington.

In a January 989 memorandum (Attach:nent I we indicated i

t r

r f;

v~

J

Contact:

Paul Bollwerk, GC X-43224 ICIO""+m in tEs aca:j '//n dMed in Ecordance v,dn thep ggom g; ggg, U"

9309220216 930428 IOW -hN$$h-

~

PDR FOIA GILINSK92-436 PDR Ls

y.

73-37 i

2 l

lJl. b(

Recommendation:

h d_.i M _f:..

cp Leonard Bickwit, Jr.

  • General Counsel Attachments:

1.

Memo, 1/6/82, Bickwit to Commission 2.

Draft Order

  • /

In its responsive filings, the permittee also questioned the standing of the intervenor and the type of hearing it should be afforded.

With regard to the former, both the staff and the permittee admit that the intervenor has made a prima facie showing of the requisite " interest," but indicate they wish to engage

_2 h very to content the validity of its affidavits.

we believe

{

>O

/

ll

/

l l

4 3

Commissioners' comments should be provided directly to the Office of the Secretary by c.o.b. Wednesday, September 29, 1982.

Commission Staff Office comments, if any, should be submitted to the Commissioners NLT Wednesday, September 22, 1982, with an information copy to the Office of the Secretary.

If the paper is of such a nature that it requires additional time for-analytical review and comment, the Commissioners and the Secretariat should be apprised of when comments may be expected.

This paper is tentatively scheduled for affirmation at an Open Meeting during the Week of October 4, 1982.

Please refer to the appropriate Weekly Commission Schedule, when published, for a specific date and time.

DISTRIBUTION:

Commissioners OGC OPE OIA SECY

m

.q-

.q

. r I

a t

I 1

1 i

3 t

i) 4

^ f t

2 e

?

]

r ATTACHMENT 1 p

e i

t i

h i.

e

?t li

.e

' 1I i

L r

i

' t) k i

b

(

t I

t a

t s'

k 6

I e

h I

t 1

l

..