ML20057B547
| ML20057B547 | |
| Person / Time | |
|---|---|
| Site: | Columbia, Washington Public Power Supply System |
| Issue date: | 09/30/1982 |
| From: | Malsch M NRC OFFICE OF THE GENERAL COUNSEL (OGC) |
| To: | |
| Shared Package | |
| ML20049A457 | List:
|
| References | |
| FOIA-92-436 SECY-82-377A, NUDOCS 9309220218 | |
| Download: ML20057B547 (2) | |
Text
r.igg t-
..;.,s
- l' L
h s*# ~'%
g f.
p September 30, 1982 SE Y-82-377A
- a.e*
ADJUDICATORY ISSUE (Affirmation)
For:
The Commission From:
Martin G. Malsch, Deputy General Counsel
Subject:
REVISION Discussion:
desire that OGC redraft
_ _. We had previously discussed this matter Xttached hereto are revised pM5s Underlined portions indicated suggF5ted additions to the order, while bracketed material would be deleted.
Contact:
Paul Bollwerk, GC X-43224 h'N'"'U:'n in this 'CC0id r/S$ dt>Wd D Ptenivte wlth the pgDIU d IMDim on ACf. Ex e.n-/!;.33__f 7m 9309220210 930428 b
c%
' > db
)
2 Recommendation:
r - -- ~ _ _ _
Martin G. Malsch Deputy General Counsel
Attachment:
Revised pp. 15-18 Commissioners' comments should be provided directly to the Office of the Secretary ASAP, or with your vote on SECY-82-377.
I This paper is tentatively scheduled for affirmation at an Open Meeting on October 7, 1982.
I DISTRIBUTION:
~
Commissioners OGC I
OPE OIA SECY l
.