Forwards Corrected Pages to Rev 31 & 32 to Sequoyah Nuclear Plant Physical Security/Contingency Plan & 0607. Plan Withheld,Per 10CFR73.21
ML20056D842
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 08/11/1993
From: Schofield B
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9308180130
Download: ML20056D842 (2)


Text

-

SAFEGUARDS INFORMATLO.

1 A

w.etsm, w w.e s,er m , x ,essee e rc:

August 11, 1993 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Gentlemen:

In the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 SEQUOYAH NUCLEAR PLANT (SQN) - PHYSICAL SECURITY / CONTINGENCY PLAN (PSP /CP) - REVISION 31, DATED APRIL 5, 1993 AND 32 DATED JUNE 7, 1993 Enclosed you will find corrected pages for the subject items and instructions for updating Nuclear Regulatory Commission (NRC) copies 6 through 11. The corrected pages being submitted are a result of teleconferences and subsequent agreements between NRC Region II and SQN Site Security personnel on July 7 and August 2. These corrected pages for Revisions 31 and 32 provide clarification of the commitments as requested by NRC Region II. The clarification does not change the commitment originally submitted in Revisions 31 and 32 respectfully.

This letter and the enclosed information are being sent by registered mail. The signed receipt will signify that you have received this j information and acknowledge that it contains safeguards material and shculd be withheld from public disclosure as defined by 10 CFR 73.21. ,

This receipt provides verification to TVA that NRC's copies of the plan I have been updated and the superseded material has been destroyed.

If you have any questions, please telephone Percy Hammons at (615) 751-2736.

Sincerely, t > 4 n r.t un is k[s SD7 8JPD if)T ra J ALI wyr ed y ra p4 7pps F7DM A TTArMU NT e

Bruce S. Scho ld Manager \

Nuclear Licensing and Regulatory AfIairs

Enclosure:

Copies 6-9, Revision 31 and 32 cc: See page P I

n

~

'f' 1 9308160130 930911 PDR ADDCK 05000327 ,

/ ' i SA,rEGUADS V:0RMA" 0' [g f 1n, t &. M

SA:EGUARJS N 20RVA 0\'

U.S. Nuclear Regulatory Commission Paqe 2 August 11, 1993 cc: Mr. Dave LaBarge, Project Chief U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, Maryland 20852 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379 U.S. Nuclear Regulatory Commission (Copies 10-11, Rev. 31 and 32) ,

Region II P.O. Box 2257 Atlanta, Georgia 30301 E. S. Christenbury, ET 11H-K W. R. Cobean, Jr., LP 3B-C Lillian M. Cuoco, LP SB-C R. M. Eytchison, LP 3B-C R. A. Fenech, OPS 4A-SQN R. E. Garrison, CST 7C-C R. W. Huston, Rockville Licensing Office T. J. McGrath, LP 3B-C D. E. Nunn, LP 3B-C RIMS, MR 2F-C (Re: L92 930803 800)

File: SGDSECPL.SQN i