Interim Deficiency Rept Re Cracking of Diesel Generator Fuel Oil Storage Tank Foundation,Initially Reported 820222. Caused by Overheated Cleaning Solution in Tank.Investigation Underway.Final Rept to Be Sent 820722
ML20050B428
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 03/23/1982
From: Wells D
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, EF2-57156, NUDOCS 8204050320
Download: ML20050B428 (2)


Text

..

m.u....

v,<.

w A -.-*

m Edison ~=e,..-

March 23, 1982

' [ ' ff('.

EF2-57156

/ %.-

.T T>

~

/p.,

4 Mr. Jancs G. Ecppler, Director

,.p ly.

Region III i

  • n, *4 6.g '

'., D 7"/. ' i./

U.S. Nuclear Regulatory Ormissi

~

799 Roosevelt Road

/

Glen Ellyn, Illinois 60137 N. '. -

...\\9 N.f

Subject:

Interim Report of 10Cm50.551df'.Ttits.'a(Cracking of Dicsc1 Ccncrator Fuc1011 Storage Tank Foundacion (458)

Dear Mr. Ecpplers On February 22, 1982, Detroit Edison's Mr. H.A. Kalker, Supervisor-Construction Cuality Assurance, telephoned Mr. P. Pelke of NRC-Region III, to report on a probim with Cracking of Diesel Generator Fuel Oil Storage Tank Foundation at the Fermi 2 site.

21s item deals with the cracking of the foundation of the fuel oil storage tank for emergency dicsol generator number twelve. 2c Detroit Edison Start-Up organization was conducting a chemical c1 caning of the tank.

During the cicaning operation, the cicaning solution reached tenperatures of approximately 140 F.

his apparently caused thermal expansion of the fuel oil storage tank, creating cxcessive strusses on the foundation and resulting in the cracking of the West foundation podestal. Engineering 0

had specified that the maximum tmperature should not exceed 150 F.

Investigation is continuing into the probicm to determine the cause of the failure, and the action taken to repair the foundation.

Anotter report on this itm, either interim or final, is scheduled to ba sent to you on or beforu July 22, 1982. If you have questions concerning this matter, please contact Mr. H.A. Walker, Supervisor-Construction Quality Assurance.

Very truly yours, f5

\\j ij

' LW.C DAW / HAW /cp B204050320 e20323

% R 2 6 Jgg2 h6 gDRADOCK 05000341

.:CK.2 7

e James G. Kcppler, Director March 23,1982 Page h o EF2-57156 cc: Mr. Richard DcYoung, Director Office of Inspection and Enforecment Division of Reactor Inspection Programs U.S. Nuclear Regulatory Cmmission Washington, D.C. 20555 Mr. Dnsco Littic, Resident Inspector U.S. Nuclear Regulatory Camission 6450 North Dixie Highway Newport, Michigan 48166