Interim Deficiency Rept Re Calibr of Torque Wrenches, Initially Reported on 810303.Deviation Disposition Requests Issued to Resolve Hardware Problems & Procedures Revised. Next Rept to Be Provided by 820723
ML20050B130
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 03/25/1982
From: Wells D
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, EF2-57155, NUDOCS 8204050027
Download: ML20050B130 (2)


Text

_

Donald A. Wells j

uawecoy Assu<ance g.

013123r %st

/

e 2000 Second Avenue b

l owoa, u.cmaan 4822s (313) 23 T-8000 I

\\\\ f f

e\\

March 25, 1982

'g y

EF2-57155 g

4 q

4 2'E9'

.h

~D an Mr. James C. Keppler, Director k) g-Region III

.A U. S. Nuclear Regulatory Commission 799 Roosevelt Road D

D Glen Ellyn, IL 60137

'g g/

r0

Dear Mr. Keppler:

Subject:

Interim Report of 10CFR50.55(e) Item on Calibration of Torque Wrenches (#40)

This additional interim report on the Calibration of Torque Wrench problem has been prepared to provide you with the curr.:nt status of this problem.

The problem was originally reported to Mr. J. E. Konklin of NRC Region III by Detroit Edison's Mr. H. A. Walker, Supervisor-Construction Quality Assurance, on March 3, 1981.

Programs of all site contractors performing QA Level I torquing have been reviewed.

Deviation Disposition Requests (DDR's) were issued where hard-ware problems were found. Procedures were revised where needed, and purchase orders changed to provide the required control. DDR's which were written have been dispositioned to provide a 20% sampling of questionable torqued items to verify accuracy.

Calibration frequencies used by the various contractors were reviewed, and in one case, t'ne calibration interval wac shortened. Work is continuing on this problem.

Another report on this item, either interim or final, is scheduled to be sent to you on nr hefore July 23, 1982.

If you have questions con-cerning this matter, please call Mr. H. A. Walker, Supervisor-Construction Quality Assurance.

Very truly yours, n

{ !

Ap

\\

b P

HAW:mb 8204050027 820325 PDR ADOCK 05000341 MAR 2 6 882 S

PDR S rfo EM

1 l

1 Mr. Jancs G. Keppler, Director March 25, 1982 Page TWo EF2-57155 l

cc:

Mr. Richard DeYoung Office of Inspection and Enforcanent Division of Reactor Inspection Programs U.S. Nuclear Regulatory Comtission Washington, D.C.

20555 Mr. Bruce Little, Resident Inspector U.S. Nuclear Regulatory Camlission 6450 harth Dixie Highway Newport, Michigan 48166