|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217L7681999-10-19019 October 1999 Forwards Insp Rept 50-458/99-12 on 990822-1002.Four Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy RBG-45125, Forwards Voluntary Response to Administrative Ltr 99-03, Preparation & Scheduling of Operating Licensing Exams1999-10-18018 October 1999 Forwards Voluntary Response to Administrative Ltr 99-03, Preparation & Scheduling of Operating Licensing Exams ML20217J3751999-10-15015 October 1999 Informs That Applicable Portions of NEDC-32778P, Safety Analysis Rept for River Bend 5% Power Uprate, Marked as Proprietary Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) IR 05000458/19990071999-10-0505 October 1999 Refers to Util Ltr Re Apparent Violations Described in Insp Rept 50-458/99-07 Issued on 990804 & Forwards Nov.Insp Described Two Apparent Violations Related to River Bend Station Division I EDG RBG-45123, Informs That Error Reported to NRC by GE on 990630 Resulted from Changes to SAFER Code Models Counter Current Flow Limiting (Ccfl) in Upper Part of Fuel Bundle at Upper Tie Plate (Utp).No Changes in SAR or COLR Required1999-09-30030 September 1999 Informs That Error Reported to NRC by GE on 990630 Resulted from Changes to SAFER Code Models Counter Current Flow Limiting (Ccfl) in Upper Part of Fuel Bundle at Upper Tie Plate (Utp).No Changes in SAR or COLR Required RBG-45124, Suppl to 990907 Response to Violations Noted in Insp Rept 50-458/99-07.Info to Address Specific Requests in 990920 Conference Call Re DG Assessment Completion Dates for Corrective Actions & DG Maint Rule (a)(1) Status,Encl1999-09-24024 September 1999 Suppl to 990907 Response to Violations Noted in Insp Rept 50-458/99-07.Info to Address Specific Requests in 990920 Conference Call Re DG Assessment Completion Dates for Corrective Actions & DG Maint Rule (a)(1) Status,Encl RBG-45122, Forwards Rev 3 to RBS COLR for Ninth Fuel Cycle, IAW TS 5.6.5 of App a of FOL NPF-471999-09-23023 September 1999 Forwards Rev 3 to RBS COLR for Ninth Fuel Cycle, IAW TS 5.6.5 of App a of FOL NPF-47 RBG-45113, Clarifies Statement Contained in NRC SER for Licensing RBS, Per Error That Became Evident During Plant Fire Protection Functional Insp1999-09-21021 September 1999 Clarifies Statement Contained in NRC SER for Licensing RBS, Per Error That Became Evident During Plant Fire Protection Functional Insp ML20212D8901999-09-16016 September 1999 Discusses 6 Month Review of Plant Midcycle Ppr.Advises of Plans for Future Insp Activities.Forwards Historical Listing of Plant Issues,Referred to as PIM ML20216F7881999-09-15015 September 1999 Forwards Insp Rept 50-458/99-10 on 990830-990903.No Violations Noted.Insp Covered Licensed Operators Requalification Training Program & Observation of Requalification Activities 05000458/LER-1998-003, Forwards LER 98-003-02,revising Previous Rept Dtd 981005, Submitted to Clarify Reported Condition & to Incorporate Final Root Cause Analysis & Corrective Action Plan for Event.Complete Rev & No Change Bars Used in Documents1999-09-0909 September 1999 Forwards LER 98-003-02,revising Previous Rept Dtd 981005, Submitted to Clarify Reported Condition & to Incorporate Final Root Cause Analysis & Corrective Action Plan for Event.Complete Rev & No Change Bars Used in Documents ML20211Q7721999-09-0909 September 1999 Expresses Appreciation for ,In Response to NRC 990702 Re Denial of Notice of Violation Cited in Concerning Insp Rept 50-458/98-16.Reply Found to Be Responsive to Concerns Raised in NOV RBG-45109, Provides Comments on Reactor Vessel Integrity Database. Requests That Data Be Corrected as Noted1999-09-0808 September 1999 Provides Comments on Reactor Vessel Integrity Database. Requests That Data Be Corrected as Noted ML20211Q3921999-09-0808 September 1999 Forwards Insp Rept 50-458/99-08 on 990711-0821.One Violation Being Treated as Noncited Violation ML20211Q5541999-09-0808 September 1999 Discusses Meeting Conducted on 990830 in St Francisville,La Re Overall Performance Issues During 990403-0703 Refueling/ Maintenance Outage.Due to Proprietary Nature of Some Subject Matters,Meeting Closed to Public.Attendance List Encl ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) RBG-45095, Responds to NRC Re Violations Noted in Insp Rept 50-458/99-07.Corrective Actions:Fuel Pump Coupling Was Reworked Using Loctite & Division I DG Was Returned to Operable Status1999-09-0707 September 1999 Responds to NRC Re Violations Noted in Insp Rept 50-458/99-07.Corrective Actions:Fuel Pump Coupling Was Reworked Using Loctite & Division I DG Was Returned to Operable Status RBG-45097, Requests Approval of Proposed Alternative to Second Interval Inservice Testing Program,Allowing One Time Extension of Test Interval for 20% of Full Set Main Steam Line Safety Relief Valves1999-08-31031 August 1999 Requests Approval of Proposed Alternative to Second Interval Inservice Testing Program,Allowing One Time Extension of Test Interval for 20% of Full Set Main Steam Line Safety Relief Valves RBG-45094, Responds to NRC Re Violations Noted in Insp Rept 50-458/98-16 Between 990720 & 0807.Corrective Actions:River Bend Will Submit Changes Associated with Lcn 15.06-006 & Accompanying Evaluation1999-08-25025 August 1999 Responds to NRC Re Violations Noted in Insp Rept 50-458/98-16 Between 990720 & 0807.Corrective Actions:River Bend Will Submit Changes Associated with Lcn 15.06-006 & Accompanying Evaluation ML20211E2071999-08-23023 August 1999 Discusses Insp Rept 50-458/99-07 in Which 2 Violations Were Identified & Being Considered for Escalated Enforcement Action.Response Should Be Submitted Under Oath or Affirmation ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 RBG-45093, Forwards FFD six-month Program Performance Data Rept for Rept Period 990101 Through 990630,containing Statistical Data & Trend Analysis Compiled by FFD Dept1999-08-17017 August 1999 Forwards FFD six-month Program Performance Data Rept for Rept Period 990101 Through 990630,containing Statistical Data & Trend Analysis Compiled by FFD Dept ML20211A9291999-08-17017 August 1999 Forwards Insp Rept 50-458/99-11 on 990719-23.Areas Examined Included Portions of Licensee Physical Security Program. No Violations Noted ML20210T8881999-08-16016 August 1999 Forwards Replacement Pages 9-18 for Insp Rept 50-458/99-09, Issued on 990730 IR 05000458/19980101999-08-13013 August 1999 Forwards Summary of 990805 Mgt Meeting with Licensee in Arlington,Tx Re Radiological Control Problems Noted in Insp Repts 50-458/98-10 & 50-458/99-04.With Attendance List & Licensee Presentation ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210U3751999-08-12012 August 1999 Informs That Info Contained in Presentation, River Bend Station Fuel Recovery Project,Dtd 990622, Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20210Q7691999-08-11011 August 1999 Forwards Request for Addl Info Re Licensee River Bend Individual Plant Exam External Events,Under GL 88-20,suppl 4,dtd 910628 ML20210R4591999-08-10010 August 1999 Ack Receipt of Which Transmitted Plant Emergency Plan,Rev 20 Under Provisions of 10CFR50,App E,Section V.Nrc Approval Not Required,Based on Determination That Changes Does Not Decrease Effectiveness of EP ML20210N1641999-08-0404 August 1999 Forwards Insp Rept 50-458/99-07 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20210K4641999-08-0303 August 1999 Forwards SE Accepting Licensee 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Power-Operated Gate Valves, Issued on 950817 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210K1351999-07-30030 July 1999 Forwards Insp Rept 50-458/99-09 on 990510-28 with in-office Insp Until 990701.Three Violations Being Treated as Noncited Violations ML20210J9691999-07-30030 July 1999 Discusses 990719 Meeting with Util in Arlington,Tx Re Region IV Staff Findings of Root Cause Investigation Into Fuel Cladding Failures That Occurred During Recent Cycle 8 Operation.List of Attendees & Organization Chart Encl RBG-45072, Submits Final Response to GL 94-02, Long-Term Solution & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Bwrs. Ltr Documents Completion of Reporting Requirements Contained in Subject GL1999-07-23023 July 1999 Submits Final Response to GL 94-02, Long-Term Solution & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Bwrs. Ltr Documents Completion of Reporting Requirements Contained in Subject GL ML20210E9001999-07-23023 July 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev 1,Suppl 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 RBG-45073, Requests Withholding of Info Presented in 990719 Meeting of EOI & NRC Region IV Re Recent Anomalous Conditions Found During Insp of Fuel Bundles During 1999 RFO at Rbs.Affidavit Executed IAW Provisions of 10CFR2.790(b)(1),encl1999-07-20020 July 1999 Requests Withholding of Info Presented in 990719 Meeting of EOI & NRC Region IV Re Recent Anomalous Conditions Found During Insp of Fuel Bundles During 1999 RFO at Rbs.Affidavit Executed IAW Provisions of 10CFR2.790(b)(1),encl RBG-45071, Forwards Rev 2 to River Bend COLR for Ninth Fuel Cycle,Iaw TS 5.6.5 of App A.Affected Pages of GE Suppl Reload Licensing Rept, May 1999 Submittal & List of Effective Pages,Encl1999-07-19019 July 1999 Forwards Rev 2 to River Bend COLR for Ninth Fuel Cycle,Iaw TS 5.6.5 of App A.Affected Pages of GE Suppl Reload Licensing Rept, May 1999 Submittal & List of Effective Pages,Encl 05000458/LER-1999-002, Forwards LER 99-002-01,IAW 10CFR50.73.Supplemental Rept Details Root Cause Analysis for Reported Condition. Commitments in Document Annotated on Commitment Identifier Form,Attachment 11999-07-15015 July 1999 Forwards LER 99-002-01,IAW 10CFR50.73.Supplemental Rept Details Root Cause Analysis for Reported Condition. Commitments in Document Annotated on Commitment Identifier Form,Attachment 1 ML20196L0501999-07-0606 July 1999 Informs That NRC Insp Rept 50-458/99-03 Issued on 990519 with Errors in Tracking Numbers Assigned to Seven Noncited Violations & Error Re Actual Location of SRO During Refueling Activities.Revised Pages 2 & 4 Encl ML20209B6081999-06-30030 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl ML20196K6851999-06-30030 June 1999 Ack Receipt of & Denial of NOV in Response to Transmitting NOV & Insp Rept 50-458/98-16.Listed Info Documents Results of Review of Response to Violation Re fire-induced Circuit Faults ML20196K0671999-06-30030 June 1999 Forwards Insp Rept 50-458/99-04 on 990412-16 & 28-29.Five Violations of NRC Requirements Occurred & Being Treated as Noncited Violations,Consistent with App C of Enforcement Policy.Meeting Scheduled for 990726 RBG-45048, Forwards Rev 1 to Rbs,Cycle 9 COLR, IAW TS 5.6.5 of License NPF-47.GE Suppl Reload Licensing Rept,Dtd May 1999, Is Included.Without GE Rept1999-06-29029 June 1999 Forwards Rev 1 to Rbs,Cycle 9 COLR, IAW TS 5.6.5 of License NPF-47.GE Suppl Reload Licensing Rept,Dtd May 1999, Is Included.Without GE Rept RBG-45047, Informs of Util Expectation to Complete Review of Final Rept Supporting Power Uprate & Submits TS Changes in Jul 1999,per Licensee to NRC Re Increasing Power Output1999-06-29029 June 1999 Informs of Util Expectation to Complete Review of Final Rept Supporting Power Uprate & Submits TS Changes in Jul 1999,per Licensee to NRC Re Increasing Power Output ML20196H5171999-06-21021 June 1999 Requests Withholding of Info Being Presented in Meeting of Entergy,General Electric & NRC Staff.Licensee Requested Meeting with NRC to Present Info on Recent Anomalous Conditions Found During Insp of Fuel Bundles.W/Affidavit 05000458/LER-1999-012, Forwards LER 99-012-00,IAW 10CFR73.Commitments Contained in Document Identified on Commitment Identification Form1999-06-21021 June 1999 Forwards LER 99-012-00,IAW 10CFR73.Commitments Contained in Document Identified on Commitment Identification Form RBG-45035, Requests That Encl RBS Fuel Recovery Info Be Withheld from Public Disclosure,Per Provisions of 10CFR2.790(a)(4).Info Is Being Presented at Meeting to Discuss Recent Anomalous Conditions Found.Proprietary Info Withheld1999-06-21021 June 1999 Requests That Encl RBS Fuel Recovery Info Be Withheld from Public Disclosure,Per Provisions of 10CFR2.790(a)(4).Info Is Being Presented at Meeting to Discuss Recent Anomalous Conditions Found.Proprietary Info Withheld ML20196E0601999-06-18018 June 1999 Forwards Insp Rept 50-458/99-05 on 990418-29.Four Violations Identified & Being Treated as Noncited Violations 05000458/LER-1999-011, Forwards LER 99-011-00 for River Bend Station,Unit 1,IAW 10CFR50.73.Commitments Identified in Rept,Encl1999-06-0909 June 1999 Forwards LER 99-011-00 for River Bend Station,Unit 1,IAW 10CFR50.73.Commitments Identified in Rept,Encl 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARRBG-45125, Forwards Voluntary Response to Administrative Ltr 99-03, Preparation & Scheduling of Operating Licensing Exams1999-10-18018 October 1999 Forwards Voluntary Response to Administrative Ltr 99-03, Preparation & Scheduling of Operating Licensing Exams RBG-45123, Informs That Error Reported to NRC by GE on 990630 Resulted from Changes to SAFER Code Models Counter Current Flow Limiting (Ccfl) in Upper Part of Fuel Bundle at Upper Tie Plate (Utp).No Changes in SAR or COLR Required1999-09-30030 September 1999 Informs That Error Reported to NRC by GE on 990630 Resulted from Changes to SAFER Code Models Counter Current Flow Limiting (Ccfl) in Upper Part of Fuel Bundle at Upper Tie Plate (Utp).No Changes in SAR or COLR Required RBG-45124, Suppl to 990907 Response to Violations Noted in Insp Rept 50-458/99-07.Info to Address Specific Requests in 990920 Conference Call Re DG Assessment Completion Dates for Corrective Actions & DG Maint Rule (a)(1) Status,Encl1999-09-24024 September 1999 Suppl to 990907 Response to Violations Noted in Insp Rept 50-458/99-07.Info to Address Specific Requests in 990920 Conference Call Re DG Assessment Completion Dates for Corrective Actions & DG Maint Rule (a)(1) Status,Encl RBG-45122, Forwards Rev 3 to RBS COLR for Ninth Fuel Cycle, IAW TS 5.6.5 of App a of FOL NPF-471999-09-23023 September 1999 Forwards Rev 3 to RBS COLR for Ninth Fuel Cycle, IAW TS 5.6.5 of App a of FOL NPF-47 RBG-45113, Clarifies Statement Contained in NRC SER for Licensing RBS, Per Error That Became Evident During Plant Fire Protection Functional Insp1999-09-21021 September 1999 Clarifies Statement Contained in NRC SER for Licensing RBS, Per Error That Became Evident During Plant Fire Protection Functional Insp 05000458/LER-1998-003, Forwards LER 98-003-02,revising Previous Rept Dtd 981005, Submitted to Clarify Reported Condition & to Incorporate Final Root Cause Analysis & Corrective Action Plan for Event.Complete Rev & No Change Bars Used in Documents1999-09-0909 September 1999 Forwards LER 98-003-02,revising Previous Rept Dtd 981005, Submitted to Clarify Reported Condition & to Incorporate Final Root Cause Analysis & Corrective Action Plan for Event.Complete Rev & No Change Bars Used in Documents RBG-45109, Provides Comments on Reactor Vessel Integrity Database. Requests That Data Be Corrected as Noted1999-09-0808 September 1999 Provides Comments on Reactor Vessel Integrity Database. Requests That Data Be Corrected as Noted RBG-45095, Responds to NRC Re Violations Noted in Insp Rept 50-458/99-07.Corrective Actions:Fuel Pump Coupling Was Reworked Using Loctite & Division I DG Was Returned to Operable Status1999-09-0707 September 1999 Responds to NRC Re Violations Noted in Insp Rept 50-458/99-07.Corrective Actions:Fuel Pump Coupling Was Reworked Using Loctite & Division I DG Was Returned to Operable Status ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) RBG-45097, Requests Approval of Proposed Alternative to Second Interval Inservice Testing Program,Allowing One Time Extension of Test Interval for 20% of Full Set Main Steam Line Safety Relief Valves1999-08-31031 August 1999 Requests Approval of Proposed Alternative to Second Interval Inservice Testing Program,Allowing One Time Extension of Test Interval for 20% of Full Set Main Steam Line Safety Relief Valves RBG-45094, Responds to NRC Re Violations Noted in Insp Rept 50-458/98-16 Between 990720 & 0807.Corrective Actions:River Bend Will Submit Changes Associated with Lcn 15.06-006 & Accompanying Evaluation1999-08-25025 August 1999 Responds to NRC Re Violations Noted in Insp Rept 50-458/98-16 Between 990720 & 0807.Corrective Actions:River Bend Will Submit Changes Associated with Lcn 15.06-006 & Accompanying Evaluation ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 RBG-45093, Forwards FFD six-month Program Performance Data Rept for Rept Period 990101 Through 990630,containing Statistical Data & Trend Analysis Compiled by FFD Dept1999-08-17017 August 1999 Forwards FFD six-month Program Performance Data Rept for Rept Period 990101 Through 990630,containing Statistical Data & Trend Analysis Compiled by FFD Dept RBG-45072, Submits Final Response to GL 94-02, Long-Term Solution & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Bwrs. Ltr Documents Completion of Reporting Requirements Contained in Subject GL1999-07-23023 July 1999 Submits Final Response to GL 94-02, Long-Term Solution & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Bwrs. Ltr Documents Completion of Reporting Requirements Contained in Subject GL RBG-45073, Requests Withholding of Info Presented in 990719 Meeting of EOI & NRC Region IV Re Recent Anomalous Conditions Found During Insp of Fuel Bundles During 1999 RFO at Rbs.Affidavit Executed IAW Provisions of 10CFR2.790(b)(1),encl1999-07-20020 July 1999 Requests Withholding of Info Presented in 990719 Meeting of EOI & NRC Region IV Re Recent Anomalous Conditions Found During Insp of Fuel Bundles During 1999 RFO at Rbs.Affidavit Executed IAW Provisions of 10CFR2.790(b)(1),encl RBG-45071, Forwards Rev 2 to River Bend COLR for Ninth Fuel Cycle,Iaw TS 5.6.5 of App A.Affected Pages of GE Suppl Reload Licensing Rept, May 1999 Submittal & List of Effective Pages,Encl1999-07-19019 July 1999 Forwards Rev 2 to River Bend COLR for Ninth Fuel Cycle,Iaw TS 5.6.5 of App A.Affected Pages of GE Suppl Reload Licensing Rept, May 1999 Submittal & List of Effective Pages,Encl 05000458/LER-1999-002, Forwards LER 99-002-01,IAW 10CFR50.73.Supplemental Rept Details Root Cause Analysis for Reported Condition. Commitments in Document Annotated on Commitment Identifier Form,Attachment 11999-07-15015 July 1999 Forwards LER 99-002-01,IAW 10CFR50.73.Supplemental Rept Details Root Cause Analysis for Reported Condition. Commitments in Document Annotated on Commitment Identifier Form,Attachment 1 ML20209B6081999-06-30030 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl RBG-45047, Informs of Util Expectation to Complete Review of Final Rept Supporting Power Uprate & Submits TS Changes in Jul 1999,per Licensee to NRC Re Increasing Power Output1999-06-29029 June 1999 Informs of Util Expectation to Complete Review of Final Rept Supporting Power Uprate & Submits TS Changes in Jul 1999,per Licensee to NRC Re Increasing Power Output RBG-45048, Forwards Rev 1 to Rbs,Cycle 9 COLR, IAW TS 5.6.5 of License NPF-47.GE Suppl Reload Licensing Rept,Dtd May 1999, Is Included.Without GE Rept1999-06-29029 June 1999 Forwards Rev 1 to Rbs,Cycle 9 COLR, IAW TS 5.6.5 of License NPF-47.GE Suppl Reload Licensing Rept,Dtd May 1999, Is Included.Without GE Rept ML20196H5171999-06-21021 June 1999 Requests Withholding of Info Being Presented in Meeting of Entergy,General Electric & NRC Staff.Licensee Requested Meeting with NRC to Present Info on Recent Anomalous Conditions Found During Insp of Fuel Bundles.W/Affidavit RBG-45035, Requests That Encl RBS Fuel Recovery Info Be Withheld from Public Disclosure,Per Provisions of 10CFR2.790(a)(4).Info Is Being Presented at Meeting to Discuss Recent Anomalous Conditions Found.Proprietary Info Withheld1999-06-21021 June 1999 Requests That Encl RBS Fuel Recovery Info Be Withheld from Public Disclosure,Per Provisions of 10CFR2.790(a)(4).Info Is Being Presented at Meeting to Discuss Recent Anomalous Conditions Found.Proprietary Info Withheld 05000458/LER-1999-012, Forwards LER 99-012-00,IAW 10CFR73.Commitments Contained in Document Identified on Commitment Identification Form1999-06-21021 June 1999 Forwards LER 99-012-00,IAW 10CFR73.Commitments Contained in Document Identified on Commitment Identification Form 05000458/LER-1999-011, Forwards LER 99-011-00 for River Bend Station,Unit 1,IAW 10CFR50.73.Commitments Identified in Rept,Encl1999-06-0909 June 1999 Forwards LER 99-011-00 for River Bend Station,Unit 1,IAW 10CFR50.73.Commitments Identified in Rept,Encl 05000458/LER-1999-010, Forwards LER 99-010-00 for River Bend Station,Unit 1 IAW 10CFR50.73.Commitments Identified in Rept,Encl1999-05-28028 May 1999 Forwards LER 99-010-00 for River Bend Station,Unit 1 IAW 10CFR50.73.Commitments Identified in Rept,Encl RBG-45021, Informs That Cycle 9 Operation Will Remain within MCPR Safety Limits Approved in Amend 105 to TS Issued by NRC in1999-05-26026 May 1999 Informs That Cycle 9 Operation Will Remain within MCPR Safety Limits Approved in Amend 105 to TS Issued by NRC in 05000458/LER-1999-009, Forwards LER 99-009-00 IAW 10CFR50.73.Commitments Contained in Ltr Are Identified on Commitment Identification Form1999-05-24024 May 1999 Forwards LER 99-009-00 IAW 10CFR50.73.Commitments Contained in Ltr Are Identified on Commitment Identification Form RBG-45017, Informs NRC of Addition of ASME Boiler & Pressure Vessel Code,Section Xi,Code Case N-496-1 to RBS Inservice Insp Program.Commitment Made by Util,Encl1999-05-14014 May 1999 Informs NRC of Addition of ASME Boiler & Pressure Vessel Code,Section Xi,Code Case N-496-1 to RBS Inservice Insp Program.Commitment Made by Util,Encl ML20206N1921999-05-10010 May 1999 Provides Revised Attachment 2 for Alternative Request IWE-02,originally Submitted 990429 Re Bolt Torque or Tension Testing of Class Mc pressure-retaining Bolting as Specified in Item 8.20 of Article IWE-2500,Table IWE-2500-1 05000458/LER-1999-007, Forwards LER 99-007-00 IAW 10CFR50.73.Commitments Identified in LER Are Noted in Attachment 11999-05-10010 May 1999 Forwards LER 99-007-00 IAW 10CFR50.73.Commitments Identified in LER Are Noted in Attachment 1 05000458/LER-1999-006, Forwards LER 99-006-00 Re Unplanned Automatic Standby Svc Water Initiation,Due to Procedure Inadequacy.Commitments Identified in Rept Noted in Attachment 11999-05-0606 May 1999 Forwards LER 99-006-00 Re Unplanned Automatic Standby Svc Water Initiation,Due to Procedure Inadequacy.Commitments Identified in Rept Noted in Attachment 1 05000458/LER-1999-005, Forwards LER 99-005-00 IAW 10CFR50.73(a)(2)(i).Commitments Identified in LER Are Noted in Attachment 11999-05-0303 May 1999 Forwards LER 99-005-00 IAW 10CFR50.73(a)(2)(i).Commitments Identified in LER Are Noted in Attachment 1 RBG-44993, Forwards RBS Annual Individual Monitoring Rept for Jan-Dec 1998,per Requirements of 10CFR20.2206(b).File Info Listed. Without Encl1999-04-30030 April 1999 Forwards RBS Annual Individual Monitoring Rept for Jan-Dec 1998,per Requirements of 10CFR20.2206(b).File Info Listed. Without Encl RBG-44998, Informs of Missing Documentation Re Examination Results Reported in RBS Owners Activity Report Forms Submitted to NRC on 9802241999-04-30030 April 1999 Informs of Missing Documentation Re Examination Results Reported in RBS Owners Activity Report Forms Submitted to NRC on 980224 ML20206E7811999-04-29029 April 1999 Proposes Alternatives to Requirements of ASME B&PV Code Section XI,1992 Edition,1992 Addenda,As Listed.Approval of Alternative Request on or Before 990915,requested 05000458/LER-1999-003, Forwards LER 99-003-00,per 10CFR50.73.Commitments Identified in Rept Are Noted in Attachment 11999-04-23023 April 1999 Forwards LER 99-003-00,per 10CFR50.73.Commitments Identified in Rept Are Noted in Attachment 1 RBG-44968, Submits Addl Info Re 981008 LAR 1998-02 Re Implementation of Bwrog/Ge Enhanced Option I-A (EI-A) Reactor Stability long- Term Solution.Clarifies Certain Aspects of Proposed Ts,Per 990406 Telcon with NRC1999-04-15015 April 1999 Submits Addl Info Re 981008 LAR 1998-02 Re Implementation of Bwrog/Ge Enhanced Option I-A (EI-A) Reactor Stability long- Term Solution.Clarifies Certain Aspects of Proposed Ts,Per 990406 Telcon with NRC RBG-44965, Responds to 990324 Telcon RAI Re SLMCPR Calculation Method for RBS Cycle 9 Slmcpr,Per LAR 1998-15 Re Change to TS 2.1.1.2, Reactor Core Safety Limits. Proposed TS Pages, Encl1999-04-0808 April 1999 Responds to 990324 Telcon RAI Re SLMCPR Calculation Method for RBS Cycle 9 Slmcpr,Per LAR 1998-15 Re Change to TS 2.1.1.2, Reactor Core Safety Limits. Proposed TS Pages, Encl RBG-44959, Withdraws 981120 LAR 1998-20,allowing Adjusting Control Pattern for Plant Startup If Outage Had Occurred Before Planned Refueling Outage.No Plant Outage Was Conducted & Plant Is Now in Eighth Refueling Outage1999-04-0808 April 1999 Withdraws 981120 LAR 1998-20,allowing Adjusting Control Pattern for Plant Startup If Outage Had Occurred Before Planned Refueling Outage.No Plant Outage Was Conducted & Plant Is Now in Eighth Refueling Outage ML20205F1781999-03-31031 March 1999 Forwards Consolidated Entergy Submittal to Document Primary & Excess Property Damage Insurance Coverage for Nuclear Sites of Entergy Operations,Inc,Per 10CFR50.54(w)(3) RBG-44939, Forwards Rbs,Unit 1 Annual Occupational Radiation Exposure Rept for 1998, Per TS 5.6.1.Rept Consists of Tabulation of Exposure for Personnel Receiving Exposures Greater than 100 Mrem Per Yr1999-03-31031 March 1999 Forwards Rbs,Unit 1 Annual Occupational Radiation Exposure Rept for 1998, Per TS 5.6.1.Rept Consists of Tabulation of Exposure for Personnel Receiving Exposures Greater than 100 Mrem Per Yr ML20196K7101999-03-26026 March 1999 Submits Reporting & Recordkeeping for Decommissioning Planning,Per 10CFR50.75(f)(1) RBG-44899, Provides Notification of Termination of Licensed Operator, AA Rouchon,License OP-42416-1,due to Resignation.Reactor Operator License Data,Listed1999-03-25025 March 1999 Provides Notification of Termination of Licensed Operator, AA Rouchon,License OP-42416-1,due to Resignation.Reactor Operator License Data,Listed ML20204G8701999-03-15015 March 1999 Responds to NOV Described in NRC Correspondance to Util ,expressing Disappointment in NRC Determination That AD Wells Deliberately Provided Incomplete & Inaccurate Info to NRC During Meeting on 971015 RBG-44925, Responds to NRC Re Violations Noted in Investigation Rept 4-97-059.Corrective Actions: Mgt Expectations for Communicating with NRC Issued to Site Personnel on 980212,by RBS Vice President,Operations1999-03-15015 March 1999 Responds to NRC Re Violations Noted in Investigation Rept 4-97-059.Corrective Actions: Mgt Expectations for Communicating with NRC Issued to Site Personnel on 980212,by RBS Vice President,Operations RBG-44924, Informs That Util Response to NOV Re Investigation Rept 4-97-059,will Be Issued by 990315,as Extended by NRC Ltr .Encl Check for $55,000 Is for Payment of Civil Penalty IAW Instructions in .Without Check1999-03-0505 March 1999 Informs That Util Response to NOV Re Investigation Rept 4-97-059,will Be Issued by 990315,as Extended by NRC Ltr .Encl Check for $55,000 Is for Payment of Civil Penalty IAW Instructions in .Without Check RBG-44912, Responds to Violations Noted in Insp Rept 50-458/98-13. Corrective Actions:Matls & Training Were Provided to Expedite Implementation of Existing Procedural Guidance to Supply Compressed Air1999-03-0303 March 1999 Responds to Violations Noted in Insp Rept 50-458/98-13. Corrective Actions:Matls & Training Were Provided to Expedite Implementation of Existing Procedural Guidance to Supply Compressed Air RBG-44904, Informs NRC of Date Change Re Commitment Made in Response to NOV 50-458/98-05-01.New Commitment Date 9912161999-02-25025 February 1999 Informs NRC of Date Change Re Commitment Made in Response to NOV 50-458/98-05-01.New Commitment Date 991216 RBG-44384, Submits Response to Fuel Cladding Defect Issues Raised in 10CFR2.206 Petition.Clear Technical Basis Exists in Info Provided by River Bend Station to Deny Petition1999-02-11011 February 1999 Submits Response to Fuel Cladding Defect Issues Raised in 10CFR2.206 Petition.Clear Technical Basis Exists in Info Provided by River Bend Station to Deny Petition ML20203C4201999-01-25025 January 1999 Submits Denial of NRC Request for Advance Info Re Concerns Raised by Ucs in 10CFR2.206 Petitions on River Bend & Perry Plants.Petitioners Were Not Required to Provide NRC with Info in Advance of Informal Public Hearings 1999-09-09
[Table view] |
Text
, ,
S PI E G E L & McD I A lt M II) DAVID MOLKER GEER 4E BPIEGE.L PC ROBLRT C M<- A lo 1350 NEW YORM AVE NUE NW LISA G WLEN RoegMy A JAstog W ASHi% TON D C 20005-4798 pgTgR j HopntNg JAMES N HORwoOD RU6 SELL F. SMITH, til RANCES RANCIS ELE E8 4000 E M PE DANIEL 1. david 6ON TELECOF'EW i2O2 p 393-2860 TERESA A. FERRANTE DANIE'L J GUTTM AN M ATTHEW F. UNTNER PETER K MATT MARK S HEGEDUS BC it s e R OF COUN5EL THOMA%C TRAUGER ROBEP .' A. SALTZSTEfN JOHN J CORSETT BRADLEY S WEISS CYNTHIA S DOGORAD GUY MARTIN GARYJ N E WE LL RENA4 ST EINZOR P DANIEL BRUNE R SCOTT H B1HAUSS UEd.'EU REMAN August 2, 1993 MARGARET A McGOLDRICK PHILIP E CLAPP QOVEWNMENT AFF A8R5 D4WECTOR Mr. Geoffrey Grant, Acting Chief Inspection and Licensing Policy Branch Program Management, Policy Development and Analysis Staff Nuclear Regulatory Commission Washington, D.C. 20555 Re: NRC Docket No. 50-458
Dear Mr. Grant:
This will respond to your letter of inquiry dated July 7, 1993 with respect to the proposed transfer of the control of ownership of the River Bend Station from Gulf States Utilities Company ("GSU") to EntercJy Corporation
("Entergy") now pending in the above-captioned docket. You have asked that the Municipal Ene.m Agency of Mississippi
("MEAM") respond to certain questions. We address each of these questions below. For ease in response we set out your question first, then our response.
Question 1 In the FERC " Order Accepting Rate Sched-ules, Accepting Amendment-to Power Agreement, Conditionally Accepting Transmission Tariff With Modifications, Conditionally Accepting Service Agreements, Granting Waiver of Notice, and Denying Motion to Update Market Power Analysis," dated April 5, 1993, 63 F.E.R.C. Paragraph 61,025, the FERC urged the Entergy customers.(and the NRC staff presumes GsU's customers as well subsequent to the merger) who are eligible for certain benefits perceived to be broader than what is termed " point-to-point" transmission service over the EntercJy system, to cpproach the FERC with specific objec- )
tions in the context of a repest to amend or i approve a service contract with Entergy Corporation. J Would MEAM explain to the staff why this proposal R/ l
}
9308060016 930802 g f b
Ap/: )
PDR ADOCK 05000458 4 g fl l] p( J.)
M PDR h ,y
)
- Nr. Geoffrey Grant August 2, 1993 Page 2.
would not be an acceptable option in resolving its transmission access dispute with GBU/Entergy?
A.1. We have been unable to determine what the FERC had in mind that might resolve the problems which are now manifest. The proposal as you state it -- that MEAM and others who believe themselves entitled to rights under the NRC license conditions " approach the FERC with specific objections-in the context of a request to amend or approve a service contract with Entergy Corporation" -- does not appear to work from a practical point of view, as we explain below.
The specific passage in the April 5 FERC order to which you refer is presumably that somewhat enigma- i tic paragraph which appears at Enterav Services.
Inc., 63 FERC 161,025, at p.61,147 (1993):
With respect to NRC license conditions, any customer that is eligible for differ-ent terms and conditions due to an NRC license condition may be separately accounted for in a service agreement. If the customer alleges that the terms and conditions contained in the service agree-ment do not conform to applicable requirements, the Commission will address the issue at that time based on the spe- ,
cific facts presented by the customer and Entergy.
We refer to this provision hereafter as the FERC 3
" invitation." This invitation provision seems to ,
say that if there is a clear NRC license condition l of which Entergy is in violation, and 11 the service ]
agreement is inconsistent with that NRC condition '
[the " applicable requirements") the FERC will en- -i tertain a complaint proceeding to remedy the matter if Entergy will not voluntarily modify the service agreement. In substance, this suggests that we talk to Entergy and, if that does not work, complain to ;
the FERC. ,
l This suggestion has not been ignored. MEAM and )
others approached Entergy about a year ago, in.the '
context of a request to amend service agreements.
In that context, MEAM and others have in fact made i the same argument that they have made here -- that l the changes to the operation of the Entergy system I I
and the changes in the operation of the electrical industry which have occurred _since the license conditions justified the expansion of the license 1
i 1
- Mr. Geoffrey Grant !
August 2, 1993 ;
I Page 3.
obligations to the Entergy system (including GSU, when and if the merger is approved). While this was done in the context of a settlement discussion, and it would not be appropriate to provide a detailed description of that process, there is no such amend- ,
I ment now in place, nor is it clear that such an amendment is even close to fruition. While there has been no overt refusal to negotiate further by any party, it is not at all apparent that a satisfactory resolution is nigh. 1/ :
The fact that negotiations with Entergy do not seem i very likely to rcach satisfactory resolution leaves the second half of the FERC invitation -- to apply to the FERC to remedy a violation of the license conditions. On the one hand, this is precisely what MEAM and others have sought to do in their pleadings at FERC so far in the merger proceeding; FERC has expressly declined to respond to our requests, other than to invite us to think of coming back again with the same contention. On the other hand, this is not as simple an effort as might appear, since, as we have noted to this Commission, the license conditions requiring network access were drafted initially in a much different environment and legal ;
conditions. l Entergy has argued that the licenses apply only to the subsidiary which technically holds the NRC license, regardless of the fact that MP&L (for example) scarcely exists any longer as anything more than a corporate shell, and that the planning and i operating functions for all Entergy subsidiaries are !
now centralized for the entire system, as is the ;
generation function for the entire system. Entergy apparently takes the position that the substitution -
of a separate common operator (Entergy Operations, Inc, or "EOI") for all of the Entergy nuclear units (and proposed to be added to the River Bend unit) >
changes nothing and that this commission should continue to assume that each of the Entergy franchised subsidiaries (MP&L, NOPSI, AP&L and LP&L) operate as separate entities, even though that is no ;
longer so. As we note-below, in response to your fourth inquiry, those changes by Entergy, undertaken to respond to the changes in the regulatory structure imposed by FERC and by Congress, mean that MEAM can no longer deal with MP&L in any meaningful :
1/ MEAM does note that it is still engaged in discussions with Entergy on these matters, and retains some hope that there is a resolution which could be reached.
Mr. Geoffrey Grant August 2, 1993 i Page 4. l way, since all MP&L functions of interest to MEAM which used to exist are now in reality Entergy J functions instead. Since MP&L has functionally ceded all functions and rights in dealing with MEAM to Entergy, it is not unreasonable for MEAM and others to expect that the obligations similarly be undertaken by Entergy. l As the FERC order to which you have referred shows, however, Entergy has taken the position even before the FERC that the license conditions need be given ;
only the most narrow, cramped interpretation, and i that a license condition for Grand Gulf, for j example, applies only to the activities of Mississippi Power & Light Co. As that order also !
demonstrates, at p. 61,147, Entergy argues that only the NRC should enforce NRC license conditions, and that in any event disputes should be dealt with in NRC enforcement proceedings. So far as the likely effectiveness of the FERC " invitation" is concerned, we note that, in response to MEAM and others pointing out that the NRC license conditions were expressly crafted to preclude the separate double charge for point to point service from A to B when a charge is also levied for service from B to A (in the course of the Licensing Board ruling in the Waterford 3 proceeding), the FERC went so far as express 1v to permit the double charge, saying only
-- in the invitation clause -- that if MEAM or others had a separate NRC right and that if Entergy tried to override that right, MEAM could come back to FERC to complain. l l
The problem with the invitation clause as a solution to the problem faced by MEAM and other TDUs is that it is hollow and inconsistent on its face. MEAM and other TDUs were faced with the operation of the Entergy tariff filed and accepted for operation in l FERC Docket No. ER91-569-000. That tariff (sup-posedly an "open access" tariff, which Enterg had filed to be applicable to its entire system) is intended'to be used by MEAM and other TDUs to accomplish sales to and purchases from others who could not now be reached through the interconnection agreements which these entities had with the his-toric Middle South (now Enterg) operating companies. MEAM and others pointed out that this j very tariff, which Enterav filed 19 acolv 12 them and intended 12 acolv 12 them, violated the NRC license conditions in several ways. It was this l effort which led the FERC to issue its invitation to i come back if Entergy intended to apply provisions to l them in a way which violated the license conditions.
i l
l
~
l Mr. Geoffrey Grant August 2, 1993 l Page 5. j i
It may be, of course, that those responsible for the application of FERC policy at the time of the fil-ings in question did not read the comments of MEAM and others. It might also be that the filings of MEAM and the other TDUs were unclear, although we do not think that to have been the case. But unless the FERC was suggesting that Entergy should and must deviate in dealing with MEAM and other TDUs from the very tariff which the FERC was approving (which would ordinarily be thought to be in violation of usually accepted principles dealing with filed rates and the non-discrimination provisions of Sec-tions 205 and 206 of the Federal Power Act) it seems clear that FERC was simply rejecting our contention as to NRC license conditions out of hand, although sub silentio.
MEAM and others had pointed out that the application of the "open access" tariff to them would violate :
several provisions of the NRC licenses at issue.
These violations included:
the violation of the "between and among" clause -- charging multiple times for a use which did not exceed a fixed amount of power, 2/ and ,
the violation of the provision which pre -
cludes charging transmission customers for loss of revenues from sales of power displaced over the transmission provided which is temporarily idled by changes in contract. 2/ ;
Entergy, on the other hand, had argued, and the FERC has now agreed, that the "open access" tariff resolved the concentration of control problems and increase in monopoly power associated with the proposed merger with GSU because the "open access" tariff could be used by MEAM and other TDUs. Between FERC and -
Entergy, the net result is that MEAM and other .
TDUs are forced to use the "open access" tariff F if they are to deal with others, whether or n21 it is inconsistent with or violates the NRC '
licenses.
I 2/ Grand Gulf condition 5, Waterford 3 condition 5. >
2/ Grand Gulf condition 1(d), Waterford 3 condition 1(b),
River Bend condition 1(c).
I
Mr. Geoffrey Grant August 2, 1993 Page 6.
MEAM and others have arp ed that, if the
- principles of the NRC licenses were applied by FERC in the merger proceeding, the open access tariff could be modified (or a network tariff created) in a manner which was consistent with the license conditions. FERC has thus had the issue placed squarely before it, and has opted to wash its hands of it, thus leaving MEAM and others to deal with a tariff which seems on its face to violate the license conditions, but which has been approved by FERC. Inviting MEAM and others similarly situated to ask Entergy to modify the tariff as to them, when they had raised the issue with FERC and been rebuffed, seems an exercise in futility. So does the invitation to return to FERC if Entergy does not modify the tariff which FERC has just approved, over MEAM's objection.
If the corporate shell shuffling associated with the merger had resulted in MP&L being the name of the combined companies there would be no real question that the Grand Gulf license obligations would apply within the expanded system. The fact that the name is somehow different should not change the fact that the functional obligations should follow the operational changes which Entergy has imposed.
The NRC has not permitted health, safety or funding obligations to be avoided by corporate shell shuffling; nor should it permit the antitrust obligations to be avoided by the same arid legalisms. FF.RC has found in the '
i ER91-569-000 proceeding that Entergy is now operated as a single entity:
Entergy operates its system on an inte-grated basis and will be making sales ...
at market-based rates on a system basis.
Moreover, the Entergy pool agreement ...
recognizes that the transmission system is planned and operated on a single system basis.... Given this, there is no reason to require customers to negotiate sepa-rately with up to four separate operating companies.... Entergy shall, therefore, consolidate its tariffs into one and adopt a single rate reflect ;ng the equalized costs under its pool agreements.
Enterav Services. Inc., 58 FERC T 61,234, at
- p. 61,769 (1992). It' appears inconsistent for FERC tc recognize that Entergy is now operated as a l
l
Mr. Geoffrey Grant August 2, 1993 Page 7.
single unitary entity and to direct that it price its services on that basis, and at the same time to refuse to recognize that the principles behind this Commission's license conditions need be applied in a method which recognizes this change in operation.
Nor do we believe that it can be that FERC simply misapprehends the issues, or misunderstands that this Commission's license conditions really do apply in a manner which makes a difference. For these issues were briefed to the FERC on rehearing. 4/ On July 1, 1993, the FERC issued its Order Denying Rehearing, Granting Motions to Strike, Denying Motion to Dismiss and Denying Requests for Stay.
Perusal of that Order does not offer any suggestion that FERC is willing to consider these issues.
Question In terms of MEAM's access to the GSU/Enterg transmission grid, what is KEAM's understanding of the significance, if any, of the presence of a specific sentence requiring one trans-mission rate for a group of entities (i.e., "For each coordinating group of entities there shall be a single transmission charge.") in the waterford 3 nuclear license (antitrust license condition 5) and the 1cck of a similar sentence in the River Band and Trand Gulf licenses?
A.2. The !4 Ting of these license conditions is relevant hero Se AEC Board in the Waterford 3 proceeding expr + ,
noted that Entergy (then Middle South) had agreed su the "between and among" formulation in the MP&L Grand Gulf proceeding, and could not understand why LP&L (which then had a separable corporate identity in a meaningful uay) insisted on fighting about it. See Louisiana Power & Licht Co, (Waterford Steam Generatina Station Unit No. 3),.
LBP-74-78 (1974), 8 AEC 718, 733. The clarifying sentonce was added to make the purpose of the change ff MEAM's Request of Municipal Energy Agency of Mississippi for Rehearing and for Expedited Consideration and Motion for Stay of Procedural Schedule was filed with FERC on March 1, 1993, and was attached to the Response of Municipal Energy Agency of Mississippi to Notice of Consideration of Transfer of Control of Lic~ncem and Opportunity for Public Comment on Antitrust Issuas a V J)nditiona) Petition to Intervene filed with this Commissi: att April 26, 1993.
1 l
- Mr. Geoffrey Grant August 2, 1993 Page 8.
from "between" to "among" " free from doubt. Id at ;
737. As the Board stated, id, at 733: >
Transmission "among" simply means transmission from any member of a coordinating group to any other member of such group.
In sum, it appem a that in the days when LP&L existed as ;
a separate functioning subsidiary and had different policies than MP&L, this Commission found it to be necessag to spell out the obligation in greater detail because it expected LP&L to seek to avoid, through legalisms, the obligations which MP&L had accepted.
MP&L recognized its obligations in this regard in its negotiations for an interconnection agreement with MEAM, once this Commission issued its May 29, 1980 Notice of Violation against MP&L. It is the addition of Entergy, as owner and as operator, to the GSU license that raises the question here of the uniform application of the Entergy obligations on a basis that is consistent with ,
the operations which Entergy seeks permission to undertake.
Question 3 Are there currently any specific power transactions underway or currently being negotiated ,
which MEAM will have to forego if the GSU/Entergy merger is consummated and MEAM is not granted " net- '
work transmission" or parallel meaningful access to the newly created GBU/Entergy regional transmission network?
t A.3. MEAM has completed negotiations *or and signed contracts with Entergy Power, Inc. (EPI) and Cajun Electric Cooperative (Cajun) for the purchase from each of a long term power supply to be added to the current nix of generation from which MEAM supplies its eight member cities. It is still not clear what charges Entergy will impose for transmission from EPI's Independence Steam Electric Station (ISES).
Nor is it clear what charges Entergy will seek to impose for tha transmission of the power purchased from Cajun.
MEAM has interchange agreements with a number of other utilities within the Entergy transmission area (as it will be expanded if the permission sought here is granted). These include Cajun, Lafayette,
- r. Geoffrey Grant Au(ust 2, 1993 Page 9.
Louisiana, and the South Mississippi Electric Power Association, and each of these agreements provides for various services such as economy transactions.
The costs and conditions for transmission service by Entergy to permit the effectuation of short term or economy transactions has not been clear, and this forces MEAM to plan its operations on an assumption that only extraordinary potential savings would justify the transaction costs. Were the requested network services available, MEAM believes that there would be numerous transactions available to it and others that would be economically justified.
Question 4 The focus of MEAM's concerns appears to be Entergy's alleged failure to comply with its Waterford and Grand Gulf antitrust license condi-tions. Is this a correct assumption?
A.4. Not quite. There are three basic changes which have occurred since the original AEC license conditions involved in this proceeding, and it appears to us that FERC (and Entergy) are ignoring each of them.
These changes are:
A. the functional sea change initiated by the FERC itself in changing the electric utility industry from a regulated industry into 'ne in which the generation function is to be largely deregulated and governed by competitive market forces; l B. the epivalent change initiated by Entergy it-self in essentially eliminating the operating utility companies (MP&L, LP&L, AP&L and NOPSI) as separate functioning entities in favor of more efficient, centralized management estab-11shed on a functional basis across state i lines; and ;
1 C. the addition of GSU to the Entergy family, eliminating GSU as a competitive force, since it will now be run as one of the Entergy ;
operating companies, just as MP&L, LP&L, NOPSI !
and AP&L are -- from Entergy central manage- I ment. This also substantially increases Entergy's position in the industry to a point where it truly dominates the area.
i I . ,
- r. Geoffrey Grant August 2, 1993 Page 10.
These changes are marked formally as well as in practical effect. For example, EPI is now a participant in the market pricing of generation sales, and has a major stock of generation to sell to others, although it is apparently used by Entergy when not being sold to others. MEAM has, in fact, purchased some 20 MW of generation at ISES (in Arkansas) from EPI as a part of its future power supply mix. Moreover, all of the Entergy nuclear units are now (and will be on the addition of GSU, if the pending application at this Commission is granted) operated by a single entity (EOI), whose sole job is to serve as operator of all of these units on behalf Gf the Entergy system. MEAM no longer deals with MP&L for most transactions, but rather deals with centralized decision making for Entergy in Pine Bluff or in New Orleans. MEAM does not object to reorganitation for greater efficiencies, but does believe that it is fundamentally inconsistent of Entergy to assert that MP&L is and should be the only entity bound to I provide network transmission to MEAM because it is a separate organization on paper, when all of the decisions are made on a centralized basis by Entergy in Arkansas or Louisiana. It would also be fundamentally inconsistent for this Commission to permit the continuation of this charade.
m 7
/Very ruly yours, ,
L,e""
Robert C. McDiarmid RCMcD/kah cc: Mr. Neil Davis (MEAM)
David Hunt, Esq. (MEAM)
Mark Wetterhahn, Esq.
Robert McGehee, Esq.