Submits Antitrust License Condition Per 930113 Application for Amend to License NPF-7,in Response to 930204 Meeting W/ Nrc.Condition Approves Addition of Entergy Operations,Inc to License as Operator of Facility
ML20045G733
Person / Time
Site: River Bend Entergy icon.png
Issue date: 06/29/1993
From: Graham P
GULF STATES UTILITIES CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RBG-38-699, NUDOCS 9307150113
Download: ML20045G733 (3)


Text

., ,

GULF STATES UTILITIES COMPA1VY fi l V E Et 0 i" ' d D s TATION N405 U 2 H I Ci H W A Y G1

'()S1 O l' F t G 8: D r. ) X ?20 . S T. F M A P4 C 1 S V I L L f.. I O U l H I A *1 A 70//5 A l'4 i. A C O D l_ 15 94) 6 3 f, - 6 0 9 4 346-8051 j 'J ! l 3  ? 11 SJ a-! ? t  ?

s' vi; , n:s

[at d 's t r -+)

June 29,1993 RBG-38,699 File Nos. G9.5, G9.42 RBEXEC-93-309 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Gentlemen:

River Bend Station - Unit 1 Docket No. 50-458 In Gulf States Utilities Corporation's (GSU) application to amend the River Bend Station, Unit 1 Facility Operating License NPF-47 to request approval for Entergy Operations, Inc. (EOI) to be included as a licensee of River Bend with authority to operate the facility on behalf of its owners (RBG-37,989), dated January 13, 1993, we stated:

EOl will do no more than operate River Bend. It will not be involved in the marketing or brokering of power or energy from the facility. (Application at Page 14 of 16)

During the February 4,1993, meeting with the NRC Staff, we s'.ated, in answer to a Staff question, that GSU and EOI would accept a license condition, similar to those recently imposed by the NRC Staffin similar situations, confirming what we stated in the application in regard to the non-involvement of EOI in the marketing or brokering of power or energy.

Subsequently. the NRC Staff requested that GSU and EOI supply the language of an i acceptable license condition. Accordingly, we have set forth below the text of such a license condition modeled after the ANO-2 and Farley examples:

~

9307150113 930629 PDR ADOCK 05000458 p PDR pp/ )

//0 J

d 4

4 Page 2 of 3 Letter to Document Control Desk June 29,1993 RBG-38,699 RBEXEC-93-309 2.C.(3) Antitrust Conditions

a. GSU shall comply with the antitrust license l conditions set forth in Appendix C, attached hereto  !

i and incorporated in this license.  !

l l b. EOl shall not market or broker power or energy l from River Bend Station, Unit 1. GSU is i responsible and accountable for the actions of its 3

agent, EOI, to the extent said agent's actions affect the marketing or brokering of power or energy from River Bend Station, Unit 1 and, in any way, I

contravene the antitrust conditions of this paragraph j or Appendix C of this license.  !

l EOI has reviewed this proposed condition and has authorized us to state that it does not i object to its inclusion in the license at the same time that the NRC approves the addition of EOI

! to the license as operator of River Bend. Should you require any further information, do not j hesitate to contact us.

e i

Sincerely, l l l 1

l 9 NS P. D. Graham i

l i

i 1

d Page 3 of 3 f Letter to Document Control Desk 1 June 29,1993 RBG-38,699 -

RBEXEC-93-309 cc: U.S. Nuclear Regulatory Commission

  • 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011  ;

NRC Resident inspector q P.O. Box 1051 St. Francisville, La 70775 Mr. E.T. Baker }

M/S OWFN 13-H-15 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. W.M. Lambe ,

U.S. Nuclear Regulatory Commission  :

Washington, D.C. 20555 -

Mr. E. Holler, Esq.  ;'

U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Department of Environmental Quality Radiation Protection Division P.O. Box 82135 Baton Rouge, LA 70884-2135 l