Interim Deficiency Rept Re Calibr of Torque Wrenches, Initially Reported on 810303.Programs of All Site Contractors Performing QA Level I Torquing Have Been Reviewed.Next Rept Will Be Provided by 820325
ML20038C142
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 11/25/1981
From: Wells D
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, E2S81-54714, F2S81-54714, NUDOCS 8112100133
Download: ML20038C142 (1)


Text

.-

Q Donald A. Wells 6\\

Manager-Ouality Assurance Y rP~i N

f

\\

(313) 237 % 57

.11

,.,J d

ISOn 2000 Second Avenue Detroit, Michigan 48226 u

o's> =>7-eo=

-: DE09 1981> H

' b u.s.eenan amuutou Nc}hr N

25, 1981 umssm E2 81-54714 T[. sh '

s Mr. James G. Keppler, Director g

Region III U.S. Nuclear Regulatory Comnission 799 Roosevcit Road Glen Ellyn, Illinois 60137

Subject:

.Interhn Report of 10CFR50.55(e) Item on Calibration of Torque Wrenches (#40)

Dear Mr. Keppler:

This additional interim report on the Calibration of Torque Wrench problem has been prepared to provide you with the current status of this problem.

The problem was originally reported to Mr. J.E. Konklin of NRC-Region III by Detroit Edison's Mr. H.A. Walker, Supervisor-Construction Quality Assur-ance, on March 3, 1981.

Programs of all site contractors performing OA Level I torquing have been reviewed. Deviation Disposition Requests were issued where hardware prob-l lems were found. Procedures were revised where needed and purchase orders changed to provide the required control. DDR's which were written have been dispositioned to provide a 20% sampling of questionable torqued items to verify accuracy. Calibration frequencies used by the various contractors were reviewed, and in one case, the calibration interval was shortened.

Work is continuing on this problem.

Another report on this item, either interim or final, is scheduled to be sent to you on or before March 25, 1982. If you have questions concerning this matter, please contact Mr. H.A. Walker, Supervisor-Construction Quality Assurance.

Very truly yours, q

i b

')

I DAW / HAW /cp cc: Mr. Victor Stello, Jr., Director Office of Inspection and Enforcement Division of Reactor Inspection Programs Washington, D.C. 20555 Mr. Bruce Little, Resident Inspector U.S. Nuclear Regulatory Ccmmission Resident Inspector's Office 6450 North Dixie Highway Newport, Michigan 48166 8112100133 811125 PDR ADOCK 05000341 2g7 g1 S

PDR f

DEC 4 1981