Second Interim Const Deficiency Rept 70 Re GE 480-volt Trip Coils Not Dropping Out After Tripping.Initially Reported on 830321.Corrective Actions Scheduled for Completion by 830601.Final Rept Will Be Submitted by 830622
ML20023C624
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/11/1983
From: Maurin L
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
70, W3I83-0160, W3I83-160, NUDOCS 8305170492
Download: ML20023C624 (1)


Text

I OUISIANA f 24a OctanONOe s1 ster POWER & LiG HT/ P O BOX 6008

  • NEW ORLEANS LOUISIANA 70174 * (504) 366/}345 IlulNSYS N1 L. V. MAURIN Voce Presklent Nuclear Operatens May 11, 1983 W3I83-0160 Q-3-A35.07.70
  • R@ R JMRw Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission Wl3E 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012 Jsj

SUBJECT:

Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency Report No. 70 "GE 480-V Trip Coils Do Not Drop Out After Tripping" Second Interin Report

REFERENCE:

LP&L letter W3I83-0088 dated March 21, 1983

Dear Mr. Collins:

At the present time, design documents have been revised to reflect the required changes as described in the reference above. Corrective action is ongoing and is scheduled to be completed by June 1, 1983. A final report will therefore be submitted by June 22, 1983.

Very truly yours, t

L. V. Maurin LVM/ MAL / cmk cc:

1) Director
3) Mr. E. L. Blake Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555

2) Director 4)

Mr. W. M. Stevenson Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C.

20555

..< P

.(

8305170492 830511

'k PDR ADOCK 05000382 S

PDR