ML20005F684

From kanterella
Jump to navigation Jump to search
Proposed Tech Spec 3/4.3.2, ESFAS Instrumentation, Reflecting Increase to Surveillance Test Interval to 24 Months.Instrument Drift Study Encl
ML20005F684
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 01/08/1990
From:
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML13303B183 List:
References
NUDOCS 9001170142
Download: ML20005F684 (63)


Text

_. _ _

(

k r

NPF-10/15-280 i

b t

i ATTACHMENT C SONGS UNIT 2'- .

PROPOSED TECHNICAL SPECIFICATIONS ,,

i l

1 r

a 900108 >

h1 i hs 0500gl P

.?

i i I '

y Im is

- - 0:

1 1 1A8tE 3.3-4 E00GINEERED SAFEIY FEAIURE AC1 Hall 0N SYSTEM INSTRt#KMTATION TRIP VALUES j

z

@ Att0WA8tE y FUNCTIONAL seyl 1 RIP VALUE VALUES b

-e

1. SAFETY INJECTION (SIAS)

! m a. Manual (irlp Buttons) Not Applicable Not Appilcable

b. Contaisument Pressure - High 3,7 $ ig $/ 1 II" isig thia (1)
c. Pressurizer Pressure - Low jgg f 'A c 3 763 ' psia (1)
d. Automatic Actuation Logic Not Applicable Not Appilcable
2. CONTA110ENT SPRAY. (CSAS)
a. 06anual (Trip. Buttons) Not Applicable flot Appilcable
b. ContalramentPressure--High-High/f.O $ hilg /'O $ Q ;)Ilg i c. Automatic Actuation Logic Not Applicable 8000 Appilcable
3. CONIAllelENT ISOLATION (CIAS)
a. Manual CIAS (Trip Buttons) flot Applicable flot Applicable E b Manual SIAS'(Trip Buttons) Blot Applicable flot Appilcable
c. Containment Pressure - High- 34 5hhlg 3 g i h "psig I d. Automatic Actuation Logic 'Not Applicable flot Applicable
4. MAIN STEAM ISOLATION (MSIS)

F Manual (Trip Buttons) .tfot Ilcable

, g a. flot Applicable

[ b. Steam Generator Pressure.- Low .. 'fi// 3 h' psia (2) 7p/3hpsia(2)

~

E c. Automatic Actuation Logic ~ 100t. Applicable Not Applicable x

5. RECIRCULAT1991"(RAS)-
a. Refueling Water Storage Tank ~ 18.5% of tap span. 19.27% 3 tap span 3 17.73%

e b. Automatic Actuation Logic Not Applicable 'Not Agy.Ilcable C

r-V O

5 e.-

A_ - - - . - . - - -- - -- - - - - - - - - - l- ~ ---

~

s,.

=

I A_il!! 3.3-4 (Continued) c) [NGINEERED SAFETY TEAlllRL ACIUA110N SYS1[M INSIRIMINIAll0N IRIP VA!UI S a -

b At 10WAlli r U IUNCTIONAl llNli 1 RIP VALUE VAlULS n.

6. CONIAltHINI COOLING (CCAS)
a. Manual CCAS (Irip Buttons) Not Applicable Not Applicable
h. Manual SIAS (Irip Buttons) h t Applicable Not Agylicable
c. AiLonatic Actuation Logic Not Applicable Not Applicable
7. LOSS of POWER (LOV)
a. 4.16 kv Emergency Bus Undervoltage (loss of Voltage and Degraded Voltage) See fig. 3.3-1 (4). See r ig. 3. 3-1 (4)
8. lHIRGI NCY IEEDWATER (EFAS)
a. Manual (Trip Buttons) Not Applicable Not Applicalile

' h^' le. Sieam Generator (A&B) Level-Low >4h - 3/ )

) Ab "

,- m s

[ c.

d.

Steam Generator AP-High-(SG*A > SG-B)

Steam' Generator AP-High (SG-B.) SG-A)

$ g psi f.15

${}isi ~bi

/Ve I

$ i - /89 - 5 l

c. Steam Generator (A&B) Pressure lid < >(hlfsia(2)

> h sia (2) -74/ fly-I. Aulomatic Actuation tmpic Not Applicable- Not Applicable a

w f

--=:~- . - --4-- - .-s - - - -maas_es.-

-w. - as m a 2_ wwwew, #- -A-:.--_eu -2.-

_g ,a.m.. --

a o,

TABLE 4.3-2

. E o ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTAION SURVEILLANCE PEQUIREMENTS

-5 ,

,n CHANNEL MODES FOR WHICH

.T CHANNEL CHANNEL. FUNCI10NAL SURVEILLANCE E FUNCTIONAL UNIT CHECK CALIHRATION TEST- IS REQUIRED "e

m 1. SAFETY INJECTION (SIAS)

a. - Manual ' (Trip Buttons) N.A. N. A. . CR. g [o, ) - 1, 2, 3, 4
b. Containment Pressure --High 5 M 1 r 2, 3
c. Pressurizer-Pressure - Low 5 [(g M (4)( 6 I M I , 2, 3
d. Automatic Actuation Logic N.A. N.A. M(1)(3), SA(4) I , 2 ' ') . 4
2. CONTAINMENT SPRAY (CSAS)
a. Manual (Trip Buttons) N.A. N.A. (61 -1, 2, 3
b. Containment Pressure -- -

High - High 5 (R [L ) M 1, 2, 3 m c. Automatic Actuation Logic N.A. M.A. M(I)(3) SA(4) I , 2, 3 1

m 3. CONTAINMENT ISOLATION (CIAS)

J, a. Manual CIAS (Trip Buttons) N.A. N.A. (Rg [,U l 1,_2, 3, 4

- b. Manual SIAS (Trip Buttons)(5). N.A. N.A. $f (6) 1 , 2 , 3 ,' 4 (g* [6 )

c. Containment Pressure - High S. . M 1, 2, 3
d. Automatic Actuation Logic N. A. N.A. M(1)(3), SA(4) 1, 2, 3, 4
4. MAIN STEAM ISOLATION (MSIS)
a. Manual (Trip Buttons) N.A. ([R -[b ) 1, 2, 3
b. Steam Generator Pressure - Low S N. A.[ b )

(RM M 1, 2, 3

c. Automatic Actuation Logic N.A. N.A. M(1)(3), SA(4) 1, 2, 3
5. RECIRCULATION (RAS)
a. Refueling Water Storage Tank - Low 5 R M 1, 2, 3, 4
b. Automatic Actuation Logic N.A. N.A. M(1)(3), SA(4) - 1, 2, 3. 4
6. CONTAINMENT COOLING (CCAS)
a. Manual CCAS (Trip Huttons) N.A. N.A.
  • h. Manual SIAS -(Trip Buttons)

(R - (D ) 1, 2, 3, 4 N. A. N.A. . LR T I b) 1, 2, 3, 4

]' c. Automatic Actuation logic N.A. N.A. M(1)(3), SA(4) I , 2, 3, 4 N

~

,a---e. -="--"-

y TABLE 4.3-2 (Continued) z ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION SURVEILLPOCE REQUIREMENTS h CHAlW6EL M00ES FOR WHICH CHAf80EL CHAfstEL FUNCTIONAL SURVEILLANCE FUNCTIONAL UNIT CHECK CALIBRATION TEST IS REQUIRED W 7. LOSS OF POWER (LOV)

a. 4.16 kV Emergency Bus -

Undervoltage (Loss of ~

Voltage and Degraded Voltage) S /N Sir' ( 6) 1, 2, 3, 4

8. ENERGE90CY FEEDWRTER (EFAS) '
a. Manual-(Trip Buttons) N.A. N.A. .R' [6) 1, 2, 3
b. SG Level (A/8)-Low and g AP (A/B) - High S < R[. ibl M 1, 2, 3

) c. SG Level (A/B) - Low and No ,

. Pressure - Low Trip (A/B) S RI U ) M 1, 2, 3 J, d. ' Automatic' Actuation Logic M.A. N.A. M(1)(3). SA(4) 1, 2, 3 to

9. CONTROL ROOM ISOLATION (CRIS)
a. Manual CRIS (Trip Buttons) N.A. M.A. R N.A.
b. Manual.SIAS (Trip Buttons) N.A. N.A. R N.A.
c. -Airborne Radiation
1. Particulate / Iodine 5 R M All
11. Gaseous -S R M All.
d. Autcantic Actuation Logic N.A. M.A. R(3) All
10. .TOMIC GAS ISOLATION (TGIS)..
a. Manual (Trip Buttons) ~'

N.A. N.A. R N.A.

b. Chlorine - High S R M All k

g c.

d.

Ammonia - High Butane / Propane - High S

5 R

k M

M All All j$, e. Automatic Actuation Logic M.A. N.A. R (3) All l-

'I 5

- . . , . - . - - . . ~ . . _ . ...-.u. - . _

...n . , , - .,-.. ._.

TABLE 4.3-2 (Continued)

ENGINEERED SAFETY FEATURE AC10ATION SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS o

5 CHANNEL MODES FOR WHICH

$ CHANNEL CHANNEL FUNCil0NAL SURVEILLANCE FUNCTIONAL UNIT CHECK CALIBRATION TEST IS REQUIRED

% 11. FUEL HANDLING ISOLATION (FHIS) to a. Manual (Irip Buttons) N.A. N.A. R N.A.

b. Airborne Radiation S R M *
i. Gaseous -

ii. Particulate / Iodine S R M *

c. Automatic Actuation Logic M.A. M.A. R(3) *
12. CONTAIISOENT PURGE ISOLATION (CPIS)
a. Manual (Trip Buttons) N.A. N.A. R N.A.
b. Airborne Radiation
i. Gaseous S R M 1,2,3,4,6 ss ii. Particulate -W R M 1,2,3,4,6 lii. Iodine W R M 6 Y c. Containment Area Radiation U (Gamma) S R M 1,2,3.4,6
d. Automatic Actuation Logic M.A. N.A. R (3) 1,2,3,4,6 TABLE NOTATION (1) Each train or logic channel shall be tested at least every 62 days'en a STAGGERED TEST BASIS.

(2) Deleted.

(3) Testing of Automatic Actuation Logic.shall include energization/de-energization of each initiation relay and verification of the OPERA 8ILITY of each initiation relay.

it; e (4) A subgroup relay test shall- be performed which shall include the energization/de-energization of each Rg subgroup relay and verification of the OPERASILITY of each subgroup relay. ' Relays exempt from testing
h. during plant operation shall.be. limited to only those relays' associated with plant equipment. which IN a cannot be operated during. plant operation. Relays not._ testable.during plant operation shall be tested d during each COLD SHUIDOWN exceeding 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> unless tested during the previous 6 ponths.

5 (5) Actuated equipment only; does not result in'CIAS.

u

  • With irradiated fuel in the storage pool.

~ .-

.+-e ( r yW N lmlom pnIlehM!Ua hlcr*M ';

G JG

- - - -m m . -

J - = - - - -

= - - - = = = ~ - - - -

I

+-

f l .o-I NPF-10/15-280 i

l

. -i i

j

-l l

7 I

ATTACHMENT D.

-SONGS UNIT 3.:

PROPOSEDTECHNICALSPECIFICATi0NS'

'i 4

3 4

4 s

ileil ll d J.

u, ' TABLE 3.3-4 5

o ENGINEERED SAFETY FEATURES ACTUATION SYSTEN INSTRUNENTATION TRIP VALUES E Att0WA8tE-

'2 VALUES

'!' FUNCTIONAL UNIT TRIP VALUE 5

% -1. SAFETY INJECTION (SIAS)

a. Manual (Irip Buttons) Not Applicable Not AppI_icable w p -
b. Containment Pressure - High $ 2.95 psg <.-- ~ 3.4 $ .1 s g 3.7
c. Pressurizer Pressure - Low 31806 psia (1) r7f> _> 176 psia (1) / 70 0
d. Automatic Actuation Logic Not Applicable Not Applicable
2. CONTAll81ENT SPRAY (CSAS)
a. Manual (Trip Buttons) Not Appli. cable Not Applicable -
b. Containment Pressure -- High-High $ lig 34. D 5 /5 c R c. Automatic Actuation Logic Not Applicable Not Applicable Y 3. CONTAll#6ENT ISOLATION (CIAS) y a. Manual CIAS'(irip Buttons) 'Not Applicable; 'Not Applicable-
b. Manual SIAS (Trip Buttons)(5)

-Not Applicable Not Applicable

.. c. Containment Pressure _- High 5@

'Not App.icable 3y 5 hYsh 7 Not Applicable

d. Automatic' Actuation Logic
4. MAIN STEAM ISOLATION (MSIS) ..
a. Manual (Trip Buttons) Not App.licable Not Applicable s ~ .W
b. Steam Generator Pressure - Low . t hssia (2) 71/ -

3h%ia(2) 77 7

c. Automatic Actuation Logic -Not Applicable Not Applicable D. 5. RECIRCutATION (RAS)
a. Refueling Water Storage Tank. -18.5% of tap span 19.27% > tap span 3 17.73%

cJt b. . Automatic Actuation Logic Not Applicable Not Applicable.

. - . _ . . ..n.1 _.-.a _ __n__-__=

- - - ___ .i _- -_ i _ - . .

a w TABLE 3.3-4 (Continued)

N

.o ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION TRIP VALLES ALLOWA8LE g FUNCTIONAL UNIT TRIP VALUE VALUES o 6. CONTAll#ENT COOLING (CCAS)

a. Manual CCAS (Trip Buttons) Not Applicable Not Applicable
b. Manual SIAS (Trip Buttons) Not Applicable Not Applicable
c. Automatic Actuation Logic Not Applicable Not Applicable
7. LOSS OF POWER (LOV)
a. 4.16 kV Emergency Bus Undervoltage

-(Loss of Voltage and Degraded Voltage) See Fig. 3. 3-1 (4) See Fig. 3.3-1 (4)

$ 8. EMERGENCY FEEDWATER (EFAS)

a. -Manual (Trip Buttons) Not Applicable Not' Applicable y
b. Steam Generator'(A&B) Level-Low 2 3) Ji Yo 3 ) 2o[6
c. Steam Generator AP-High (SG-A > SG-B) $hk /.29 < i /@
d. Steam Generator AP-High (SG-8 > SG-A) $ hsi ,/M 1h si N
e. Steam Generator (A&B) Pressure - Low 2 ia (3 74/ 3ha n (2)/ 7A y
f. Automatic Actuation Logic Not Applicable Not Applicable V

U1

"'^-'*'h- " * - *

  • - " ' * * ' ' ' * '~

u "^ * * * - -

''-"T'"-*--'- - * * * *- --

r.-a'-...i -. _e- . . .

  • _ >

, TABLE 4.3-2:

E ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRtMENTAION SURVEILLANCE RF')UIREMENTS k

c!

CHANNEL- MDOES FOR WHICH m CHAlelEL CHANNEL FUNCTIONAL

. SURVEILLANCE 3 FUNCTIONAL UNIT CHECK CALIBRATION TEST IS REQUIRED Z

m 1. SAFETY IluECTION (SIAS)

a. - Manual (Trip Buttons) N.A. N. . (6) 1,23,4
b. Containment Pressure - High S (d 1,-2. 3
c. Pressurizer Pressure - Low 5 (6) M 1, 2, 3
d. Automatic Actuation Logic N.A. M.A. M(1)(3), SA(4) 1, 2, 3, 4 -

1

2. CONTAll0ENT SPRAY-(CSAS)

(6)

a. Manual-(Trip Buttons) N.A. N.A. 1, 2, 3
b. Containment Pressure --

j m c.

High + Migh Automatic Actuation Logic 5

N.A.

([(L)

M. A.'

M M(1)(3), SA(4) '

1, 2, . 3 I , 2, 3

~

i- )

. 3. CONTAIISENT ISOLATION (CIAS)- ., ,

l J, a. Manual CIAS (Trip Buttons) N.A. N.A. 1, 2,'3, 4

" b. Manual SIAS (Trip' Buttons)(5) N.A. (RL^ ( b)

N @' (b) 1, 2. 3, 4
c. Containment Pressure.- Nigh 5 @3(b ) M 1, 2, 3 .
i d.
Automatic Actuation Logic N.A. N.A. M(1)(3), SA(4) 1, 2,-3, 4

< 4. MAIN STEAM ISOLATION (MSIS)-

!' a. Manual (Trip Buttons) N.A. N.A. h (bY 1,2,3

b. Steam Generator Pressure ~- Low 5 (RM (6) .a 1, 2, 3
c. -Automatic Actuation Logic N.A. M.A. M(1)(3), SA(4) I , 2, 3 l S. RECIRCULATION (RAS) .

l a.

Refueling Water Storage .

Tank - Low _

S R M 1,.2, 3, 4

b. Automatic Actuation Logic M.A. N.A. M(1)(3), SA(4) I , 2, 3, 4
6. CONTAI10ENT COOLING (CCAS) .
a. Manual CCAS (Trip Buttons) N.A. N.A. [E ( l. 2, 3, 4 :l M h.

O' Manual SIAS-(Trip Buttons) N.A. M.A. F O' - .l. 2, 3, 4

c. Automatic Actuation toqic N.A. .N.A. M(I)(3), SA(4) I,"2, 3, 4 N

EM

.i g, , ,

____..g y. y 3 .m_- ..a ,,

y-- 4 + _~ y < ,, , , ,.g..g 9 9 -, - y,-g.#, .# -.e. .a-..<at e 4-~m..,J av, w

, .o .

{'

. E TABLE 4.3-2 (Continued) -

t

g ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRISENTATION SURVEILLANCE PEQUIREMENTS

=

5*

CHANNEL MODES FOR WHICH CHAIGIEL CHAISIEL FUNCTIONAL SURVEILLANCE FullCTIONAL UltlT 1 CHECK CALIBRATION TEST IS REQUIRED I W 7. LOSS OF POWER (LOV)

!. a. 4.16 kV Emergency Bus -

Undervoltage-(Loss of .

Voltage and Degraded ,Q s

}

Voltage) S @a (E .I A iN 1,2,3,4

8. -i

' EfERGEllCY FEEDWATER (EFAS) .y

a. flanual (Trip Buttons) . N.A. N.A. (It " k ) 1, 2, 3 i
b. SG Level (A/B)-Low and l . AP (A/8) - High S [4(b D M 1, 2, 3 j } c. SG Level (A/B) - Low and No
, Pressure - Low Trip (A/B) 5 4 O)

(.R' -N 1,2,3

, a d. Automat 1c Actuation Logic M.A. N.A. M(1)(3), SA(4) 1, 2. 3 n

)

i

9. CONTROL ADOM ISOLATION (CRIS)

! a. flanual CRIS (Trip Buttons) N.A. N.A.. R M.A.

i b. Blanuel SIAS (Trip Buttons) . N.A. N.A. R N.A.

c. Airborne Radiation
1. Particulate / Iodine: S R M All i1. Gasoons S R M All
d. Autometfc Actuation Logic. N.A. N.A. R(3) All
10. TOMIC GAS ISOLATICII (TGIS)
a. Manuel'(Trip Buttons) N.A. N.A. R N.A.
b. . Chlorine - Nigh 5 R N- All k2 c. Ammonia High _

S R .M All

d. Butane / Propane.- High. .S R M All
k. e. Automatic Actuation Logic M.A. M.A. R (3) All l-

='i 5

~ '

] , . TABLE 4.3-2 (Continued)

E O ENGINEERE0 SAFETY FEATURES ~ ACTUATION SYSTEN INSTRt#ENTATION SURVEILLANCE REQUIRESENISl k CHANNEL N00ES FOR WHICH i

R CHANNEL CHANNEL FUNCTIONAL SURVEILLANCE 4

z FUNCTIONAL UNIT CHECK Call 8 RAT 10N TEST ~ IS REQUIRED U 11. FUEL HAISLING ISDLATION (FHIS) w a. Manual-(Trip Buttons) N.A. N.A. R- N.A. *

b. Airborne Radiation
1. Gaseous S R N *
11. Particulate / lodine S R N - *
c. Automatic-Actuation Logic M.A. N.A. R(3) *
12. CONTAIISENT PUAGE IS0tATION-(CPIS)
a. Manual (Trip Buttons) N.A. N.A. R N.A.
b. Airborne Radiation

. 1. Gaseous S R N 1,2,3,4,6

) 11. Particulate W R N 1,2,3,4,6
m ill. Iodine W R N 6 a

w

c. Containment Area Radiation
(Ganna) S R N 1,3,3,4,6 j d. Automatic Actuation Logic N.A. N.A. R (3) 1,2,3,4,6 TABLE NOTATION 1

l (1) Each train or logic channel shall be tested at least every 62 days on a STAGGERED TEST 8 ASIS.

l (2) Deleted. -

i (3) Testing of Automatic Actuation Logic shall include energization/de-energization of'each initiation i relay and verification'of the OPERA 81LITY of eaC 'qitiation relay.

l (4) A sdg g relay test shall be performed uhich sW1 include the energization/de energiration of each c_. subgroup relay and verification of.the OPERA 8ILITY of each subgroup relay. Relays exempt'from testing f g during plant operation shall be limited to only those relays associated with plant equipment which

! , cannot be operated during plant operation. Relays not testable during plant operation shall be tested

- during each COLD SNUTOOlei exceeding 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> unless tested during the previous 6 months.

$ $ (S) Actuated equipment only; does not result in CIAS.

w

  • m With irradiated fuel in the stora pool. .

, v -

i [M y vsstwa (.w Rea u;& w m -

[ ^ v .

4 NPF-10/15-280  ;

i i

?

I'

=i i

1

-ATTACHMENT E SONGS UNITS 2 AND 3 FIGURES 4

i 1

4-Figure i Methodology Flow Chart' runction.1 review of RPS/ESFAS on-line survesitances Instrumentation i

i 1I Equipment' history review 1f I

. Perform drift' analysis )'

of selected transmitters

'I

.1 f- '-

4 Review operating margins-Revise safety analysis If .

Revise setpoints  !

2 If [

Evaluate results -j U

Extension justified

ESFAS COMPONENT BLOCK DIAGRAM PRESSURE. LEVEL OR FLOW CHANNELS- CALIBRATED AT LEAST ONCE PER REFUELING INTERVAL f

p2 75M enM?lm  ; "' Wha! j$W PENETRATION shIl hh Ihhkhhfh k N2 N -

NT 1:

N 7

TRANSMITTER

/< w eg al ""~ 4.po mA /

_ 74_/'INDICATORsw2 1/E

// / ' ' ' ' ' ' ' ~

/

k' /////////

$$Nps%bw4%e#4ijffth!fh;

/)?Rf? \

h

$$ g CONTAINMENTj @gg pAjgt 2;gg 50 o m

?$$ @15 $s@ $$$s(M @d4$$ MEhfI :$n i y W;* mgge WW75bim.6% ,

  1. 8N """

Mw f: ggMg a

a .qwi$di:YRh p n.g

.* aM gs "9f. (f h i y v ;w ; W:g' 15v

-we P

o B/S o $

SHIFTLY i

  • [.[ <

l l

  1. N

.A ci 4 CHANNEL

.,p"j?f s

+

RM CHECK '

"- PPS "

CAdlNET -

7 FIG 2 l-l ABBREVIATIONS FOR FIGURES -

1/E - CURRENT TO-VOLTAGE CONVERTER CR - CONTROL ROOM B/S - BISTABLE I

I i

l t

{

l

4 ESFAS COMPONENT BLOCK DIAGRAM CONTAS"*NT PRESSURE CHANNsts.cAtIGRATED AT t saaf ONCE PER REFUEL.ING ingk g, .j. #m;c, FOXBORO CABINET

. e eu wen, -

CONTAINMENT, ( fg, -

-D' rINDI TOR  !

j.W RANSMITTER 4 20 mA CONV, ,e/ / / / / / l 2 hm l

SHIFTLY m E CHANNEL CHECK B/S

'PPS ,

CABINET j.

1

ATTACHMENT E TABLE E-1 SURVEILLANCE TEST REQUIREMENTS .

Channel Calibration I' A Channel Calibration sh'all be the adjustment, as necessary, of the channel output such that it responds with the necessary range and accuracy to known

' values af the parameter which the channel monitors. The Channel Calibration shall encompass the entire channel including the sensor and alarm and/or trip functions, and shall include the Channel Funct$onal Test. The-Channel-

.~

Calibration may be performed by any series of sequential, overlapping or total i

channel steps cuch that the entire channel is calibrated.

Channel Functional Test A Channel Functional-Test shall be:

a. Analog channels - the injection of a simulated signal into channel as close to the sensor as practicable to verify operability including alarm and/or trip functions.
b. Bistable channels - the injection of a simalated signal into the '

sensor to verify operability including alarm and/or' trip

, functions, i c. ' Digital computer channels - the exercising of the digital' computer hardware using diagnostic programs and' the injection-of a simulated process data into the channelLto verify operability.

Channel Check -

A Channel Check shall be the qualitative assessment of channel. behavior during  !

operation by observation. This determination shall include, where' possible, r

, comparison of the channel indication and/or status with other indications-i and/or status derived from independent instrument. channels measuring the same L parameter, P

i s

4 i5 :

NPF-10/15-280, N

i y

ATTACHMENT F. i SONGS UNITS 2 AND 3 SURVEILLANCE HISTORY REVIEW i

l 7

f i

i

.o i

ATTACHMENT F SURVEILLANCE AND MAINTENANCE HISTORY REVIEW Methodology A Corrective Maintenance (CM) history review was conducted for all_the instrumentation-involved in supporting the Engineered Safety Features-Actuation System (ESFAS) the refueling interval surveillance extension. The CM revi?w was completed in two parts. The first review is a comprehensive evaluation of all cms to determine their impact on operability and their method.of detection. The second review is an evaluation of all those inoperable conditions found during the 18 month surveillance. The objective of the combination of these evaluations is to ensure that all operability problems are being identified in a timely manner, and to determine the a importance of the 18 month surveillances in maintaining operability.

The instruments supporting the ESFAS system whose histories.that were- '

evaluated herein are listed on Table F-1. These components are pressure sensors, hand switches, differential pressure. sensors, actuation logic ,

channels, and relay circuitry. The Preventive Maintenance (PM) program.for l these instruments consists mainly of 18' month Channel Calibrations and shiftly 4

, operator checks. The shiftly checks include power supply, general failure and cross-channel comparison checks. Deficiencies detect 3d during these checks result in a CM order being issued. In addition-to these baseline-surveillances, EQ requirements replace the electronic' amplifiers and whole transmitter assemblies at'10,15 or 20 year intervals for the pressure and differential pressure transmitters. The actuation logic circuits are tested.

l by a monthly Channel Functional Test (CFT), and subgroup relay tests are performed semi-annually.

l Results The CM history review determined that almost all of the problems associated with operability are found by operations personnel.during once per shift checks, or during routine monitoring of plant parameters. Cross-channel comparisons were responsible for many of the' CM requests, while lagging sensor response was noted several times. The corrective action taken on many of the problems were to flush sensing lines, vent and fill- transmitters, and repair leaking hardware, and not associated with instrument calibration. No

, operability problems were found in the manual actuation circuits

-(handswitches). Few significant cms were issued on the automatic. actuation  !

circuits. Those that were issued resulted from the monthly calibration tests.

Six cms were identified as having.been found during the performance of'18 month- surveillance activities for the ESFAS loop components. Table F-2--

summarizes the problems encountered, and provides an evaluation. Tables F-3 and F-4 are provided to summarize the Loss of Voltage (LOV) relay cms and F-1 4

- . . , . . . ~ . , .. --- .- --

provide an evaluation of the 18 month surveillances performed.

Based on the evaluation of the CM review, it can be concluded that most of the sensors have not been experiencing substantial calibration problems. When '

calibration problems were identified, they were normally found during the shiftly cross-channel checks, and not during the refueling calibration. Five instruments were found to be noncalibratable during the refueling calibration, and were replaced. The review concluded that had these five instruments operated in the affected range or had the error increased even slightly, then the shiftly checks would have alerted the plant 'to the problem.-

~

A comprehensive review' of all cms for the LOV channels determined that there ,

were no cms generated outside of the PM Program that presented an operability '

problem. Additionally, -an evaluation of surveillance programs, Channel Calibrations and Channel Functional Tests, determined that no significant, time-dependent operability failures were being identified and corrected.

Therefore, extension of the surveillance interval is supported by-this evaluation.

For both process sensors and LOV relays, no repetitive failures have occurred, and no instances were found involving redundant channels during the same time .1 period. Therefore the safety and' operability. impacts have been minimal. No  !'

correlation was found between the number of failures and the interval of calibration. The results of this evaluation support a calibration interval extension from 18 to 24 (30) months, i i

l ,

I i

i.  ;

1  !

l ,

I l

l

p.2 l '

i i

l i

Table F-1 ,

ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION LIST T/S Func. Loop 11gm Comoonents Descriotion '

l. Safety Iniection .

2(3)HS9135 1,-2,-3,-4 Actuation, manual 2(3)PT0102-1,-2,-3,-4 Pressurizer pressure, low 2(3)PT0351-1,-2,-3,-4 Containment pressure, high 2(3)LO32 Automatic actuation, logic 2

l 2(3)LO34 (3)LO35

2. Containment Sorav 2(3)HS9139-1,-2,-3,-4 Actuation, manual _ ,

, 2(3)PT0352-1,-2,-3,-4 Containment pressure, high-high.

l 2(3)LO32 Automatic actuation, logic l

2(3)LO34 2(3)LO35 j 3. Containment Isolation -f 2(3)HS9136-1,-2,-3,-4 CIAS actuation, manual f

l 2(3)HS9135-1,-2,-3,-4 SIAS actuation,' manual  !

2(3)PT0351-1,-2,-3,-4 Containment pressure, high j

4. Main Steam Isolation l \

l 2(3)HS9137-1,-2,-3,-4 Actuation, manual 2(3)PT1013-1,-2,-3,-4 Steam generator pressure, low 2(3)PT1023-1,-2,-3,-4 2(3)LO32 Automatic actuation, logic ]-

2(3)LO34 2(3)LO35 1

i l:

F-3

i

]

!. I 1

e Table F continued ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION LIST  :

T/S Func. Loop.

112m Comoonents Description

6. Containment Coolina 2(3)HS9138-1,-2,-3,-4 CCAS actuation, manual 2(3)HS9135-1,-2,-3,-4 SIAS actuation, manual 2(3)LO32 Automatic actuation, logic.

2(3)LO34 2(3)LO35 j

7. Loss of Offsite Power LOV relays Actuation circuits j
8. Emeraency Feedwater l 2(3)HS9140-1,-2,-3,-4 . Actuation, manual l 2(3 HS9141-1,-2,-3,-4 2(3 LT1113-1,-2,-3 -4 Steam generator level, low,-
2(3 LT1123-1,-2,-3,-4 and i 2(3)PT1013-1,-2,-3,-4 Steam generator pressure differential, i- 2(3)PT1023-1,-2,-3,-4 high 2(3)LT1113-1,-2,-3,-4 Steam generator level, low, 2(3)LT1123-1,-2,-3,-4 and no.

I 2(3)PT1013-1,-2,-3,-4 Steam generator pressure, low trip 2(3)PT1023-1,-2,-3,-4 l-~

l l

I F-4 l

1 1

l l

1 3

l l

Table F-2 SURVEILLANCE AND MAINTENANCE HISTORY SUPMARY Date Problem Comoonent Comoleted Description  !

2LTlll3-3 11/84 (1) Replaced after failing to calibrate l 3LTlll3-2 10/85 (1) Replaced.after failing to calibrate 3LT1113-3 01/84 (1) Replaced after failing to calibrate 2PT0351-1 02/85 (2) Replaced after failing to calibrate =

2PT0351-2 02/85 (2) Replaced after failing to calibrate -

3PT0352-4 05/88 (3) Replaced after amplifier failed .;

during response time testing 1 l

EVALUATIONS (1) The subject transmitters were not able meet the' five point span  ;

accuracy specifications, and weie therefore replaced. These failures i do not represent gross problems, in that the inaccuracies-were not i significant enough to be detected by the cross-channel comparison, j Since redundant channels were available, there have been no repeat  ;

channel failures, and only one failure in the past four years, it is 1 concluded that calibration interval extension-would' have no significant impact on ESFAS'. operability.

(2) These transmitters represent one of.four redundant channels monitoring containment pressure. These transmitters could not be calibrated i within the calibration specification, and were replaced as. discussed in item (1).

-?

l F-5

__ - - - - = - =-- -- - - - - - - - - - - - - - - - ----

4 Table F continued SURVEILLANCE AND MAINTENANCE HISTORY SUPMARY 7

(3) This transmitter had been successfully calibrated and was having its' loop response time tested when the failure occurred. This failure would have been detected in the control room during normal operations.

At that time the limiting condition of operation for one channel inoperable would have been entered until repairs could be made.

(4) CM History Summarv . The maintenance history for these. instruments' was reviewed. The review showed 'that relatively few sensor related problems have occurred since beginning commercial ' operations. This

review showed that the usual problems encountered during plant operations were sluggish instrument. response, deviations between; redundant channel readings, erratic indications, and fluctuations ,

causing alarms. Each of these deficiencies was reported by operations personnel, corrective action taken, post-maintenance testing conducted, and the channel returned to service. If the channel was inoperable, a limiting condition of operation was entered 'until the '

equipment was returned to service.

! (5) The functional units with manual actuation use trip buttons. . These functional units do not require Channel Checks or Channel Calibrations but do require Channel Functional Testing on an 18 month interval. No credit is.taken in the accident analysis for the manual actuations.

Manual trip instrumentation is not subject: to drift. Channel functional checks serve to provide operability assurance. The surveillance test results, were reviewed to determine the history of l the manual trip actuations from a reliability perspective. This

surveillance review determined that there has never been a failure of I a manual trip to properly function.

W l

i F-6

e ,!

Table F-3 CALIBRATION AND CM HISTORY SUM ARY-FOR LOSS OF VOLTAGE RELAYS Date Operability Problem Comoleted Affected? Descriotion Bus 2A04 10/26/87 No (1) 162 out of tolerance Bus 2A06 09/17/87 No- (2) Voltages out of tolerance 12/25/84 No (3) 127DC6 replaced ,

I Bus 3A04 :l 07/11/88 No (4) 162 erratic time observed - 3 i

! Bus 3A06 l bhhb9h84 No (5) 162F4X2 open coil 127L reset contact loose EVALUATIONS (1) Time delay relay (162) for sequencing the emergency chiller on could-not be brought into specified time and was replaced. The as found l

deficiency would have resulted in delayed loading of the ' chiller, but not an inoperable condition.

(2) Several drop out voltages were found to be slightly-out of-tolerance.

Because some of the relays affected were under voltage, while others' ,

u were above voltage, and most were input to a "any 2-of 4" logic -

' circuit the net effect is minimal. The evaluation concludes that if a'  !

Channel Functional Test had~ been conducted.with the as found-  ;

conditions, no deficiencies would have been-detected due to.the i minimal voltage variations, y i

i I

F-7 1 l

'h

i i

l Table F continued l CALIBRATION AND CM HISTORY SUMARY  !

FOR LOSS OF VOLTAGE RELAYS l I

L (3) The 127DC6 relay is a supervisory relay installed to detect and i annunciate a loss of 125 DC control power to LOV relay circuits. .

While the relay was found not to meet its specified drop out range and  ;

was replaced, it did not affect operability of any portion of the LOV l channel.

(4) Erratic time adjustment was found when calibrating the time delay l relay that sequences an emergency chiller onto the vital bus. As in  :

item (1) this Unit 3 breaker would have been delayed in closing, but would not have resulted in an inoperable condition.  ;

Relay 162F4X2 was found with an open coil. This failure would have  !

(5) prevented one set of contacts in an "any 2 of 4" logic circuit from actuating. This particular relay is in the circuit to load shed 2 salt ^

water cooling pumps and one chiller. Since 3 of 4 relays remained  !

functional, this failure would not have affected operability of the ,

LOV circuit. This condition meets the " minimum channels operable" '

requirement of technical specification 4.3.2.3.

The 127L relay annunciates to the control room the LOV condition on  :

the affected bus. The loose reset contact would not affect the initial  ;

annunciation, but could have resulted in premature clearing of the LOV  :

indication. This would not affect LOV operability, j (6) CM History Summarv - A comprehensive review of corrective maintenance history for maintenance actions discovered outside of planned  ;

surveillances was conducted. It found only one corrective maintenance  ;

l order that presented a potential operability problem. This ,

I maintenance order, 83306265, identified that a 127F2 residual voltage t l relay did not drop out when an associated fuse blew. Investigation-revealed that the design did not have the associated alarm relay monitvring both supply fuses. A design change was initiated to correct '

the problem. This occurred at the time of becinning commercial operation, and did not represent an operability problem.

l t

F-8 r

. I i

Table F-4 I CHANNEL FUNCTIONAL TEST SupMARY FOR  !

LOSS OF VOLTAGE RELAYS l i ,

i Refueling Date Operability Problem l Cycle Comoleted Affected? Description I

Unit 2 1 03/10/85 ** 6 load sequencing relays were out of i their timed tolerance band. I relay failed to reset, and was replaced.

]

2 05/18/86 ** 8 load sequencing relays were out of  !

their timed tolerance band.  !

i 3 11/04/87 ** 12 load sequencing relays were out of j their timed tolerance band, i Unit 3

    • 9 load sequencing relays were out of i

1 12/09/85 their timed tolerance band.

    • 5 load sequencing relays were out of 2 02/27/87 their timed tolerance band.

3 07/25/88 1 load sequencing relay was out of its i timed tolerance band. l

    • As discussed below, the observed tolerance violations are considered ,

too insignificant to result in an ESF operability problem, however all  !

relays are restored to within their specified allowances prior to i

declaring the channels operable.
Evaluation 1

The Channel Functional Tests have to date not detected any failures in the '

voltage failure, residual voltage, auxiliary, alarm or time delay relays. All deficiencies have been associated with the timing of the load sequencing relays being out-of-tolerance. A typical exampic is the five deficiencies i observed during cycle 2 on Unit 3. These are shown below: ~

l. Salt Water Cooling pump started 0.15 see too early.

I F-9

Table F 4 - continued CHANNEL FUNCTIONAL TEST SupMARY FOR LOSS OF VOLTAGE RELAYS

2. Salt Water Cooling pump started 0.25 see too early.
3. D/G Bldg.'HVAC Fan started 0.30.see too early.
4. D/G Radiator Fan started 0.25 see too early.
5. D/G Radiator Fan started 0.25 see too early.

These values are typical of other observed out of-tolerance readings in magnitude. It is more usual, however, to have some late out of-tolerance times. As in other cases, the minor magnitude would not be expected to interfere with other loads coming on line which are separated by approximately 4 seconds assuming the deficient condition. This consideration is important for large loads such as the salt water cooling pumps. For the fans, the minor deviation will have even less impact.

The out-of-tolerance conditions ex)erienced above resulted after only a two week post-calibration period. Cali) ration records s50w a-) proximately the same out-of-tolerance conditions after a nominal 16 montl1 period.

l Therefore, once reset and returned to service, the findings-indicate that

! the observed drift is not time dependent, and that no operability problems

! are likely to be promoted by interval extension.

Furthermore, in all CFTs, the diesels were successfully loaded. The loss r of voltage circuit has not been responsible for the failure of any of the required loads to operate.

i l F - 10 l

1

4 i NPF-10/15-280 l

i l

I a

l

)

l i

i ATTACHMENT (i SONGS UNITS 2 AND 3  :

INSTRUMENT DRIFT STUDY .

4 I

4 4

t h

l b

5 1

i l

I s

4 ATTAC MENT C INSTRUMENT DRIFT STUDY SupMARY i

1.0 Introduction This is a summary of an analysis of instrument transmitter drift that has been performed by Southern California Edison, Reference 5.1. The purpose of the study was to quantify the magnitude of transmitter drift that is occurring at the San Onofre Nuclear Generating Station, Units 2 and 3. This is important when months considering the extension of transmitter calibration intervals to 30 in order to arrive at trip setpoints for automatic protection systems, many factors are considered. Uncertainties associated with installed equipment, calibration equipment, normal environmental effects, and, if applicable, accident environmental effects are examples of these factors. Orift, or change of calibration of instrumentation over time, of the installed instrumentation is also one of the factors and is the only one with a time dependence.

The maximum expected drift is established based on the calibration interval of the installed equipment. Historically, this has been based on information provided by instrumentation suppliers.

This summary describes an analysis of the historical calibration data of certain instrumentation used at the San Onofre' Nuclear Generating Station (SONGS Units 213. The purpose of this summary is to provide a reference documen)t of an investigation into extending the calibration interva instrumentation from the current technical specification requirement of 18 months to 30 months.

There are four technical specifications where, in addition to conducting specific procedures on logic and actuation devices, it is necessary to perform calibrations of transmitters. These technical specifications are 3/4.3.1 Reactor Protective System (RPS) 3/4.3.2 Engineering Safety Features Actuation System (ESFAS)

Instrumentation 3/4.3.3.5 Remote Shutdown Monitoring (RSM) Instrumentation 3/4.3.3.6 Accident Monitoring System (AMS) Instrumentation These technical specifications cover a large number of instrument channels, which in some cases share a common instrument transmitter. There are three types of transmitters which are addressed by these technical specifications; pressure temperature transmitters (pts),

transmitters differential pressure transmitters (DPs), and (TTs).

PT and DP transmitters are electro mechanical devices that are located remote from the control room while temperature transmitters area. are solid state, electronic modules located in the control room a number In of each instrument output devices.loop, the transmitter is a common device that drives G-1

4 Estimates for drift are developed for each model of transmitter. These values are provided in terms of % of span. These estimates reflect a "best estimate" value and a *95/95" value. Best estimates are values which reflect an expected performance of 50% of the hardware and is determined by averaging the absolute value of drift data. The 95/95 values are values of drift which will bound all hardware performance with a 95% probability at a 95% confidence level. The probability value establishes the portion of the population that is included within the tolerance interval. The 95% probability was selected for this study. This means that 95% of all past, present, and future values of drift will be bounded by the 95/95 interval value.

The confidence level essentially establishes the repeatability of calculating a value which will fall within the estimated values. A 95% confidence level was selected. This means that if the drift values would be recalculated in the future, there is a 95% chance that the values would be bounded by the 95/95 interval values. Using 95/95 values means that we are 95% sure that 95%

of all drift values will be less than the estimated values.

Best estimate values are used in evaluating the acceptability of Accident Monitoring and Remote Shutdown Instrumentation, while 95/95 values are used in evaluating instruments related to the Plant Protection Systems (PPS), i.e.,

the Reactor Protective and Engineered Safety features Actuation Systems.

Regulatory Guide 1.105, Reference 5.3, provides the basis for the use of 95/95 values for establishing and maintaining instrument setpoints of individual instrument channels in safety-related systems. These values provide assurance that the PPS will initiate automatic operation of appropriate systems to ensure that specified acceptable design limits are not excluded. Setpoints are not provided for Accident Monitoring and Remote Shutdown instrumentation.

AMS and RSM instrumentation results in operator actions and is therefore not required to be as accurate as the PPS. This warrants the use of best estimate values for AMS and RSM instrumentation.

2.0 Method of Analysis The methods used to determine the experienced drift values are described in this section. A flow chart describing the process is attached (Figure G-1).

Lotus 1-2 3 was used extensively to perform the calculations. Statistical methods described in Reference 5.2 were used to determine the maximum values i" for experienced drift for those transmitters which are used in applications covered by the SONGS Units 2&3 technical specifications on the Reactor Protective System and Engineered Safety features Actuation System. These calculations were verified by an independent check of a sample of the data.

2.1 Individual Transmitter Data To conduct this analysis, a Lotus 1-2-3 spreadsheet template was constructed.

The calibration data for the transmitters of interest were recovered and entered into this spreadsheet template and a unique spreadsheet was constructed for each transmitter. In some cases, transmitters not addressed G-2 i l

l f

1

l by these technical specifications were included in order to increase the amount of historical experience for a particular model of instrument. l i

Each spreadsheet contains a groups of 5 cells (corresponding to each of the 5  ;

calibration points) that calculate the difference between the as found readings and the as-lef t readings of the previous calibration period. This ,

difference is calculated for each set of successive calibration records that '

were recovered. Once these differences are determined, the maximum value of drift for each set of 5 points is selected. This maximum value is then ,

divided by the time interval between calibrations to determine an annual drift  ;

rate. A unique spreadsheet was constructed for each transmitter resulting in i several hundred spreaosheets. Each of these spreadsheets may contain 1 multiple, one or no calibration drift data. I J

2.2 Analysis of Data by Model and Process I Once the drift data was determined (as percent of span.per year) for individual transmitters, the data was extracted from the transmitter spreadsheets and entered into another spreadsheet to perform a first cut at editing the data. Macros were written to automatically access each  ;

transmitter spreadsheet and transfer the data to a " raw data" spreadsheet, l This method minimizes the chance for error in transferring data. One raw data j spreadsheet was constructed for each of the different types of transmitters, 1 1.e. one for pressure transmitters, one for differential pressure l transmitters, and one for temperature transmitters.

l The data in these three spreadsheets was thcn edited using two criteria j related to the interval between successive calibration data that had been recovered. Any data that was related to a calibration interval less than 100 days was removed from the data base. This data represents a short term '

problem which was likely to have been discovered by operators during shiftly surveillances or through some other means. The purpose of this analysis was to determine the magnitude of drift to be expected over a fuel cycle and to l exclude problems related to short term effects that are discovered during the fuel cycle.

l l

The second screening criteria was that any interval greater than 22 1/2 months '

was removed from the data base. These data points were removed because the maximum interval allowed by the Technical Specifications is 221/2 months so  !

an interval that is greater than this value is likely to indicate that a I calibration occurred in the intervening period but the data was not recovered.

Unique, explicit values exist for transmitters associated with PPS setpoints and CPC uncertainties. Common values exist for each of the following, Foxboro j pressure transmitters, Rosemount pressure transmitters, Foxboro differential (

pressure transmitters and CPC temperature inputs. The product of the drift  ;

study is to either validate that these numbers are valid or to define new acceptable values. To accomplish this objective, the data was then grouped i and analyzed in a manner consistent with the existing groupings. To assure '

that these groupings are appropriate, the data was divided into models, then l by processes, and then analyzed at each level. I G-3 1

l Once the grouping was established, identical final editing and analyses on the ,

data were conducted. Methods described in Reference 5.2 were used to identify i and remove outliers from the data base and to determine the 95/95 drift values. They are briefly described here.  !

2.3 Treatment of Outliers ,

An outlier is an observation that is significantly different from the rest of the sample and most likely comes from a different distribution. They usually i result from mistakes or measuring device problems. To identify outliers, the T-Test described in Reference 5.2 was utilized. The extreme studentized deviate is calculated 'as

- l T = l x, - x l i i

s  !

where J T Extreme studentized deviate I x, Extreme observation  ;

i x Mean I

s Standard deviation of the same sample 2 If T exceeds the critical value given in Table XVI of Reference 5.2 at the 5% i significance level, the extreme observation is considered to be an outlier, j Once the outlier is identified, it is removed from the data base.

2.4 Normality Tests Once the edited data base was finalized and grouped, the Chi Square Goodness of Fit Test (Reference 5.2) was utilized to assure that the underlying 1 distribution could be represented by a normal distribution. This test assumes a normal distribution and based on the. sample mean and deviation, predicts the expected number of observations in each interval. The expected values are compared to the observed values. Since this test requires a rather large <

number of points, it could only be applied to the groups with a large population. -

2.5 Maximum Expected Drift In order to establish a value for the total drift population that is conservative with a 95% probability at a 95% confidence level, a 95/95 .

tolerance interval is determined as described in Reference 5.2. A tolerance interval places bounds on the proportion of the sampled population contained within it. This tolerance interval about the mean bounds 95% of the past,

present and future drift values. Determining the interval and adding it to the absolute value of the mean determines the maximum expected drift. ,

G-4 e

~

O The maximum drift values were calculated as follows

x. - lxl + Ks where x, Maximum expected drift with a 95% probability at the 95% confidence level x Sample mean K A value from Reference 5.2, Table VII(a), with 95%

probability and at the 95% confidence level that is.

selected based on the sample size s

Standard deviation of the sample 2.6 Best Estimate of Drift The best estimates of instrument drift were calculated in much the same manner as the 95/95 values. As before, the maximum value of drift for the five calibration points was determined for each interval. Again, this maximum value was divided by the time duration of the interval to arrive at an annual drift rate. At this point, the process differs from that used to calculate the 95/95 value. The best estimate of drift for the population is determined as follows.

x.., -

Jrl n

where x,,, The best estimate of drift x, Annual drift rate of the ith data point n Number of data points 3.0 Results j The purpose of this section is to make comparisons of the results of the drift calculations to the existing drift allowances. Where those allowances are insufficient for 30 month calibration intervals, and where no explicit allowances exist, revised allowances are identified. The experienced values of drift are then compared to these revised allowances.

Selection of the 95/95 interval value or the best estimate value is dependent upon the technical specification that is being addressed. The95/95 values are selected for those instruments related to PPS setpoints, while best estimate values are selected for instruments related to AMS and RSM instruments.

in general, the value selected for comparison to the existing and revised allowances are based on the drift rates for the particular model of transmitter that is used in support of the technical specification. For the Rosemount 1153GD9 transmitters, this would lead to unnecessarily large conservatisms. The drift rates for the 1153GD9's used in the low range i pressurizer pressure application cause the 95/95 interval values to be substantially larger. It is clear that the drift rates for these transmitters are different when used in these distinctly different applications. This is  !

G-5  ;

i further discussed in Section 3.1 below.

On the other hand, selection of the best estimate for Foxboro E13DH differential pressure transmitters would underestimate the experienced drift associated with pressurizer level indication. In this case the value for the  :

pressurizer level transmitters taken by themselves was used as the best estimate of their performance. ,

The revised allowances shown in the tables in this section were chosen based on the groupings originally made for PPS setpoints. Assumptions were made for i drift rates for Foxbor.o pressure transmitters (1.5% for 13 months), Rosemount  ;

pressure transmitters (0.75% for 18 months), Fcxboro differential pressure  ;

transmitters (0.18% for 18 months), and Foxboro temperature transmitters I (0.40% for 18 months). These values were extrapolated to the maximum )

calibration interval allowed by the technical specifications, which is 22.5 i months, and used in determining the PPS setpoints. The revised allowances for J drift were determined by inspecting the 30 month drift values and selecting a l value which would bound the experienced values. In order to keep the number I of different allowances to a minimum, the value selected for PPS setpoint is ,

utilized as the allowance for AMS and RSM instrumentation.

l 3.1 Reactor Protective System Instrumentation Table 3.1 prov$ des a summary comparison of the results of the analysis of long term drift, the existing allowances for drift in RPS setpoints ana revised allowances for long term drift to accommodate 30 month intervals between transmitter calibrations.

All experienced drift values reflect the 95/95 interval valut: for the model of transmitter related to the functional unit, except for Functional Unit #5, Pressurizer Pressure - Low. In this case, a substantial difference exists between the Rosemount 1153GD9's (wide range, O to 3000 psia) used for this trip function and those 1153GD9's used for low range (100 to 765 psia) pressurizer pressure. The drift rates for the transmitters differ in the distinct applications. This can be attributed to two factors. Firstly, the low range transmitters are " ranged down" three times that of the wide range.

This is expected to cause approximately three times the drift. Secondly, the low range transmitters are exposed to an over range co-dition during normal '

operation, i.e. pressure in excess of 765 psia. Therefore, the 95/95. interval for the wide rMge Rosemount ll53GD9's is used as representing their performance.

G-6

+ i 4 l l

Table 3.1 Reactor Protective System  ;

Comparison of Results to Allowances 95/95 Existing New  :

i Instrument Interval Drift Drift J

functional Unit Model Drift"' Allow"* Allow"' I 4 1
1. Manual Reactor Trip N/A l
2. Lin Power Level - High N/A  ;
3. Log Power Level - High N/A
4. Pzr Pressure - High EllGM 3.13 1.88 3.75
5. Pzr Pressure - Low Il53GD9. 1.09 0.94 1.25 1
6. Cont Pressure - High NEllDM 2.86 1.88 3.75 l
7. S/G Pressure - Low EllGM 3.13 1.88 3.75  !
8. S/G Level - Low E13DM 6.04 0.22 6.25 l
9. Local Power Density N/A
10. DNBR - Low See #14 1
11. S/G Level - High E13DM
  • 0.22 1
12. R?S Logic N/A

? 13. Reactor Trip Breakers N/A

14. CPCs 2Al-P2V 0.82 0.50 0.94 I EllGM 3.13 1.88 3.75 l
15. CEA Calculators N/A l
16. RCS Flow - Low Il53HD6 4.55 *
17. Seismic - High N/A J
18. Loss of Load N/A 1

NOTES:

1. Drift values are in terms of % of span. l
2. The Existing Drift Allowances are derived from generic vendor data. I l

l 3. Steam Generator Level - High Trip uses a best estimate value of 12.25%. This is acceptable because this trip is used for equipment l P

protection only. I 4

4. The Reactor Coolant Flow low trip uses a Rate limited Variable ,

Setpoint(RLVS) module. Transmitter drift errors will be included in I the process signal and in the trip setpoint calculate by the RLYS  !

module. These drift errors will therefore cancel each other out.  !

All of the experienced drift values exceed the existing allowance when extrapolated to 30 month calibration intervals. The revised values are I

conservatively larger than the experienced drift rates.

l G-7 1

l l

]

9 3.2 Enoineered Safety Features Actuation System Table 3.2 provides a summary comparison of the results of the analysis of long term drift, the existing allowances for drift in ESFAS setpoints and revised allowances for long term drift to accommodate 30 month intervals between transmitter calibrations.

All experienced drift values reflect the 95/95 interval value for the model of transmitter related to the functional unit, except for Functional Unit 1.c, Pressurizer Pressure - Low. The reason for using the lower value of drift associated with the wide range transmitters is discussed in Section 3.1 above, i

Table 3.2 ESFAS Instrumentation Comparison of Results to Allowances 95/95 Existing New Instrument Interval Drift Drift Functional Unit Model Drift"' Allow"* Allow"'

l. Safety Injection ,
a. Manual N/A ]
b. Cont Pressure High NEllDM 2.86 1.88 3.75 -
c. Pzr Pressure - Low 1153GD9 1.09 0.94 1.25
d. Auto Actuation Logic N/A  ;
2. Containment Spray i
a. Manual N/A
b. Cont Pressure - Hi-Hi NE11DM 2.86 1.88 3.75
c. Auto Actuation Logic N/A
3. Containment Isolation
a. Manual CIAS N/A
b. Manual SIAS N/A
c. Cont Pressure - High NEllDM 2.86 1.88 3.75
d. Auto Actuation Logic N/A
4. Main Steam Isolation
a. Manual N/A
b. S/G Pressure - Low EllGM 3,13 1.88 3.75
c. Auto Actuation Logic N/A j
5. Recirculation
a. RWT Level - Low E13DM 6.04 0.22 6.25 l b. Auto Actuation Logic N/A i

! 6. Containment Cooling N/A

7. Loss of Power N/A i 8. Emergency Feedwater o l a. Manual N/A
b. SG Level (A/B)-Low E13DM 6.04 0.22 6.25 and DP(A/B) - High E11GM 3.13 1.88 3.75 l c. SG Level (A/B)-Low and No E13DM 6.04 0.22 6.25 Pressure - Low Trip (A/B) EllGM 3.13 1.88 3.75
d. Auto Actuation Logic N/A l G-8 l

l l

e

, Table 3.2 E5FAS Instr wentation Comparison of Ru ultc to Allowances (Continad) 95/95 Existing New Instrument Interval Drift Drift functional Unit Model Drift") All ow"* Allow")

9. Control Room Isolation N/A
10. Toxic Gas Isolation N/A
11. Fuel Handling Isolation N/A
12. Cont Purge Isolation N/A Notes:
1. Drift values are in terms of % of span.
2. The Existing Drift Allowances are derived from generic vendor data.

All of the 95/95 experienced drift values exceed the existing allowances when extrapolated to 30 month calibration intervals. The revised allowances are conservatively. larger than the experienced drift rates.

3.3 Remote Shutdown Monitorina System Instrumentation Table 3.3 provides a summary comparison of the results of the analysis of long term drift and revised allowances for long term drift to accommodate 30 month intervals between transmitter calibrations. All experienced delft values reflect the best estimate value for the model of transmitter related to the instrument channel except for wide range pressurizer pressure and pressurizer 1svel . The reason for using a different value for wide. range pressurizer pressure is discussed in Section 3.1. Substantial differences exist between pressurizer level transmitters and the same model transmitter Foxboro E13DA used to monitor HPSI 110w. This is probably due to the normally inactive HPSI system versus the constantly pressurized RCS. The higher best estimate value for the pressurizer level transmitters taken by themselves was sclected to represent the best estimate of the perfermance of these transmitters.

The revised drift allowances were chosen ta ine consistent with the allowances used fcr similar equipment used in the PFS except for the transmitters used for condenser vacuum indication. The PPS iaciudes Rosemount Il53GD9 pressure transmitters for mor.itoring pressurizer prr,ssure. The condenser vacuum loops include Rosemount 1151AP4E trinn,itters which are calibrated over a ranse of G-9

1 e

only 4 inches of mercury. The drift allowance used for Rosemount pressure transmitters (1.25% of span) is not sufficient to bound the best estimate of long term drift for the Rosemount 1151AP4E transmitters used for monitoring condenser vacuum, so a value of 8.75% of span was established. Although this is a relatively large value in terms of percent of span, it represents a very small change in terms of pressure (less than 0.5 inches Hg per 30 months).

Table 3.3 Remo.te Shutdown Monitoring Instrumentation Comparison of Results to Allowances Best Instrument Estimate Drift Instrument Model Drift

  • Allowance"*
1. Log Power Level N/A
2. RCS Cold leg Temperature 444RL 0.31 0.94*

2Al-P2V 0.28 0.94 4

3. Pressurizer Pressure 1153GD9 0.29 1.25
4. Pressurizer Level E13DH 4.96 6.25"
5. Steam Generator Level E13DM 1.98 6.25
6. Steam Generator Pressure EllGM 0.99 3.75
7. Source Range NIs N/A
8. Condenser Vacuum ll51AP4E 7.24 8.75"
9. Volume Control Tank level E13DM 1.98 6.25
10. Letdown HX Pressure EllGM 0.99 3.75
11. Letdown HX Temperature 2Al P2V 0.28 0.94
12. BAMU Tank Level NE13DM 4.31 6.25*
13. Cond Storage Tank Level 1153DD5 0.44 6.25 1152DP5 1.08 6.25
14. RCS Hot leg Temperature 444RL 0.31 0.945
15. Pzr Pressure - Low Rt.nge NE11GM 0.59 3.75
16. Pzr Pressure - High P.ange EllGM 0.99 3.75
17. Pressurizer Level E13DH 4.96 6.255
18. Steam Generator Pressure NE11GM 0.59 3.75
19. Steam Generator Level E13DM 1.98 6.25 Note:
1. Drift values are in terms of % of span.
2. The Drift Allowances for all Remote Shutdown Monitoring (RSM) instruments except those noted (3) are based on the 95/95 values.

The 95/95 values are derived from the Instrument Drift Study foi the RSM System instruments.

3. The Drift Allowance has been selected to bound the Best Estimate Drift Value. The best estimate values are derived from the Instrument Drift Study.

G - 10

i o 1 4

As can be seen from the talile, the revised allowances for drift over a 30 month period are generally several times the experienced best estimate values.

1 3.4 Accident Monitorina System Instrumentation Table 3.4 provides a summary comptrison of the results of the analysis of long term drift and revised allowances for long term drift to accommodate 30 month i intervals between transmitter calibrations. All experienced drift values reflect the best estimate value for the model of transmitter related to the i instrument channel except for pressurizer pressure and pressurizer level. The reasons for treating these instruments differently are discussed in Sections 3.1 and 3.3, respectiv'ely, l The revised drift allowances were chosen to be consistent with the allowances used for similar equipment in the PPS.

Table 3.4 j Accident Monitoring System Instrumentation Comparison of Results to Allowances i

Best I Instrument Estimate Drift  !

Instrument Model Driftm Allowance"* l

1. Cont Press-Narrow Range NEllDM 0.66 3.75
2. Cont Press Wide Range NE11GM 0.59 3.75  ;

EllGM 0.99 3.75 l

3. RCS Outlet Temperature 2Al-P2V 0.28 0.94 j
4. RCS Inlet Temperature (WR) 2Al-P2V 0.28 0.94 .
5. Pressurizer Pressure (WR) 1153GD9 0.29 1.25
6. Pressurizer Water level E13DH 4.96 6.25"
7. Steam Line Pressure E11GM 0.99 3.75
8. S/G Level (Wide Range) 1153HD5 1.09 6.25 I
9. RWT Water Level E13DM 1.98 6.25 1
10. Auxiliary FW Flow Rate E13DM 1.98 6.25
11. RCS Subcooling 2Al-P2V 0.28 0.94 Margin Monitor (QSPDS) 1153G09 0.29 1.25 ,
12. Safety Valve Position Ind N/A  ;
13. Spray System Pressure NEllDM 0.66 3.75 l
14. LPSI Header Temperature 2Al-P2V 0.28 0.94 i
15. Containment Temperature 2AI-T2V 0.50 0.945 '
16. Containment Water Level N/A i (Narrow Range) I
17. Containment Water Level N/A  :

(Wide Range) i

18. Core Exit Thermocouples N/A
19. Cold leg HPSI Flow E13DH 1.49 6.25
20. Hot leg HPSI Flow E13DH 1.49 6.25
21. HJTC System - RVLMS N/A G - 11

M Table 3.4 i

Accident Monitoring System Instrumentation l Comparison of Results to Allowances (Continued)

Note:

1. Drift values are in terms of % of span.  !
2. The Drift Allowances for all Accident Monitoring System (AMS) instruments extept those noted (3) are based on the 95/95 values. ,

The 95/95 values are derived from the Instrument Drift Study for the  ;

AMS System instruments.  ;

3. The Drift Allowance has been selected to bound the Best Estimate Drift  !

Value. The best estimate values are derived from the Instrument Drift '

Study.

Comparisons of the best estimate drift values to the revised allowances show that those allowances conservatively reflect transmitter performance. l l

4.0 Conclusions l The preceding sections of this summary provide a description of the methods )

and results of an analysis of the long term drift characteristics of I transmitters installed at San Onofre Nuclear Generating Station, Units 2&3. A l comperison of the results of analysis of the long term drift data is made to l existing allowances for long term drift. The results are also compared to l l revised allowances for long term drift assuming 30 month intervals between '

I calibrat:ons.

The scope of this summary is sufficient in that all of the models of transmitters used in applications covered by the relevant technical specifications are addressed. The methods used to develop 95/95 interval  ;

values and best estimates are accepted and documented. These methods assure i results which are consistent with the design assumptions. l i

l There are several inherent conservatisms with using the revised allowances.

o Drift allowances are larger than 95/95 and best estimate values. .

Since bounding values were selected to represent several. types of transmitters, the 95/95 and best estimate values are, in general, 1

! substantially less than the revised drift allowance.

l l

G - 12 i

1

\

< l o

Differences due to drift. in as-found and as-left values were assumed to be entirelj j

The differences in as-found and as-left readings were assumed to be entirely due to drift, when factors such as transmitter accuracy, j calibration certainly uncertainties, and normal environmental effects are most present.  ;

independently resulting in accounting for these factors twice.S  !

o Only the maximum value of the five calibration points was used. '

A typical celibration is done at five points over the range of the transmitter.

points was utilized as a data point in the drift assessment.On Incorporating the data related to the other four points would increase the amount of data by a factor of five, with four of the points of each data set being less than the point in the current data base.

This analysis provides a conservative assessment of transmitter performance i for those transmitters addressed within the scope of this summary.

Utilization of the revised allowances for long term drift in setpoint and uncertainty calculations, and in evaluations of instrument performance with respect to the E01s will provide a sound basis for extending the calibration interval of these transmitters to 30 months.

5.0 References 5.1 Southern California Edison Company, May, 1989 Instrumen 5.2 Statistics for Nuclear Engineers and Scientists, Part 1: Basic Statistical Inference, WAPD-TM 1292 Report, William J. Beggs, February ,1981, Bettis Atomic PowerDOE R Laboratory, West Mifflin, Pennsylvania 5.3 U.S. Nuclear Regulatory Commission, Regulatory Guide 1.105, ,

" Instrument Setpoints for Safety-Related Systems," February, 1986.

4 G - 13 i

t Y

N Collect data

" Instrument Drift Study Calculata drift rates Flow Chart Ngure G-1 1 r Group by model i

+

Sut> group by process 1 r U

Calculate:

- Edit data Calculate:

95/95 value - Edit data Best estimate - 95/95 value Best estimate-V i Establish bounding values

., l

4 NPF-10/15-280 t

Y 9

)

ATTACHMENT H SONGS UNITS 2 AND 3 PLANT PROTECTION SYSTEM SETPOINT EVALUATION

.c

L ,

ATTACMENT H ESFAS SETPOINT CALCULATIONS

1. INTRODUCTION The purpose of this attachment is to describe the evaluation of the proposed changes relative to the UFSAR safety analysis and Engineered Safety Features Actuation System (ESFAS) setpoint calculations for the San Onofre Nuclear Generating Station (SONGS), Units 2 and 3.

Southern California Edison (SCE) has adopted 24 month fuel cycles beginning with Cycle 4 for both SONGS Units 2 and 3. To avoid plant shutdowns solely to perform surveillance testing, SCE initiated a program to extend all refueling technical specification surveillance intervals to a nominal 24 month period.

Engineered Safety Features Actuation System (ESFAS) setpoints include assumptions for transmitter drift which are a function of the calibration interval. Therefore, in order to extend the surveillance interval, it was necessary to revise these assumptions to account for the longer time period between calibrations.

Including larger values for transmitter drift in the setpoint calculations results in setpoints which are more restrictive from an operations perspective. More restrictive setpoints may result in an increase in the number of unnecessary safety system actuations, during normal cycle operations. As part of the process of revising the ESFAS setpoints, an assessment of the change was made after accounting for the increased values for drift. In instances where the revised actuation setpoint was judged to result in a potential increase in the number of unnecessary safety system actuations, a review of the SONGS Units 2 and 3 actuation setpoint calculations and Safett Analysis Setpoints was performed. The actuation setpoint calculation 6semptions for certain ESF actuation functions were revised. The pressel aer pressure trip setpoint calculations were also revised to reflect more realistic containment enviornmental conditions for pressure and tempterature. In several cases, Safety Analysis Setpoints were revised. No changes to safety analysis limits were made.

A second factor which has been incor> orated into this revision of the setpoint calculations is a change in the cali) ration tolerance of the Plant Protection System (PPS) bistable trip units. This change is not related to extending surveillance intervals, however, it provided a convenient opportunity to make this adjustment. This revision to the allowed calibration tolerance was factored into all setpoint calculations described in Section 4.4 of this attachment. The PPS includes both the Reactor Protection System (RPS) and the Engineered Safety Features Actuation System (ESFAS).

This appendix provides an overview of the setpoint calculation process and a description of the evaluations that were made relative to the safety analysis and setpoint calculations for each of the ESFAS technical specification functional units. ,

H-1 i

d

2. SCOPE At the request of SCE and in support of the 18-24 month surveillance interval extension program, Combustion Engineering (C-E) performed instrument setpoint calculations for setpoints associated with SONGS 2&3 Technical Specifications 3.3.2 (Table 3.3 4) Functional Units 1,2,3,4,6 & 8. These functional units include sensors which are calibrated only at the refueling interval and are affected by the increased surveillance interval.
3. ESFAS INSTRUMENT LOOPS Two basic configuratio'ns of instrument loops were included in the Engineered Safety Features Actuation System (ESFAS) instrumentation (See Attachment E Figures 2 & 3)as follows:

FUNCTIONAL APPLICABLE TECH. SPEC. Unll Fiaure 3.3.2 1 2 (Pressurizer Pressure Low) 3 (Containment Pressure High) 2 3 (Containment Pressure High High, only if an SIAS signal is present) 3 3 (Containment Pressure High) 4 2 (Steam Generator Pressure Low) 6 2 (Pressurizer Pressure Low) 3 (Containment Pressure High, with SIAS) 8 2 (Steam Generator Level and Pressure) i For all instrument loops included in the C-E calculations, the components included are the transmitter, bistable (or calculator) and 250 (+/-0.01%)n resistor. The impact of the extended surveillance interval on components not impacted by drift (not included in C-E calculations) is described in Attachment F.

4. C-E SETPOINT CALCULATIONS  !

4.1 Instrument Drift Study One of the many input values to an instrument setpoint calculation, is the instrument drift associated with the components in the loop. SCE performed an

  • nalysis of transmitter calibration data for the SONGS Units 2 & 3 PPS channel wnsors. The long term drift characteristics of pressure, differential pressure and temperature transmitters, where the present technical specifications require calibration every 18 months (+ 25%), were determined.

These values were provided to C-E for use in the setpoint calculations.

A complete discussion of the Instrument Drift Study is included in Appendix G.

4.2 Methodology The C-E methodology for instrument setpoint calculations is consistent with H-2  !

l

i a

t ANSI /ISA-67.04-1988 "Setpoints for Nuclear Safety Related Instrumentation in  ;

Nuclear Power Plants", and includes the following basic components:  ;

I. Safety Analysis Setpoints: '

Analytical limits and response times used in the safety analysis to  !

ensure that safety design limits are not exceeded. l II. PPS Cabinet Uncertainties - Includes:

o Calibration equipment uncertainties '

o Calibration adjustment cllowances o Temperature effects ,

o Power supply effects  ;

o Vibration (or seismic) uncertainties ,

o Bistable drift uncertainties Independent uncertainties are combined by the Root-Sum-of-the-Sqin.res (RSS) method and dependent uncertainties are combined by algebraic summation.  ;

III. Process Equipment Uncertainties (Loop) - Includes:

o Calibration equipment uncertainties o Calibration adjustment allowances o Environmental effects (temperature, pressure, humidity and radiation) for:

-Worst case normal .

-Accident '

o Power supply effects oVibration(orseismic) uncertainties o Transmitter drift uncertainties o Process uncertainties Independent uncertainties are combined by RSS'and dependent uncertainties are combined by algebraic summation, r IV. Total Channel Worst Case Normal Error w/ Seismic:

^

RSS of II & III V. Trip Setpoint, Allowable Value and Pretrip Setpoint ,

L

-Trip Setpoint - Analysis setpoint (I) +/- Total Channel Error (IV)

Added in the conservative direction from the analysis limit based on whether the setpoint is increasing or decreasing.

Allowable Value = Trip Setpoint +/- PPS cabinet periodic test error (II)

H-3

.f

. j i

Added in the non conservative direction from the analysis limit based on whether the setpoint is increasing or decreasing, j The pretrip setpoint is qualitatively determined to provide the f operator with as much advance notice of potential automatic actuation l as possible. l VI. Voltage Equivalent for V Conversion of the process values to calibration voltage equivalent. ,

VII. Measurement Channel Response Times For Safety Analysis ,

The Technical Specification Response Times are derived from vendor  :

design specifications, used in the safety analyses, and are verified by response time testing on a periodic basis. ,

For all PPS loops (with calculations by C E) the principal loop components are the transmitter, bistable (or calculator) and 250 ohm resistor. A Channel i Functional Test (CFT) is performed on the bistable on a monthly basis to  ;

ensure that the bistable setpoint is within the tolerance allowance assumed by C-E. The 250 ohm resistor has an accuracy of 0.01%. The instrument drift of the transmitter is included and described in detail in Attachment G. All of these three component groups are included in the detailed setpoint methodology  ;

described in this section. Accordingly, consideration of total uncertainty, including drift, is accomplished in all of the ESFAS setpoint calculations -

performed by C-E. ,

The methodology followed by C-E has been performed in accordance with the C-E '

Quality Assurance Procedures and is consistent with those use to perform the core reload analysis calculations for SCE for every cycle at SONGS 2 & 3.

4.3 Assumptions The assumptions used by C-E for the ESFAS setpoint calculations, have been validated by SCE. These assumptions include such items as calibration tolerances and required accuracy for calibration equipment.

l A change to the allowed calibration tolerance, from 5 to 25'mV, was included .

in the revised actuation setpoint calculations. The calibration tolerance is the acceptable tolerance band for each bistable actuation function in the periodic surveillance procedure. If the bistable actuation occurs within this ,

tolerance band, no adjustment is required, and the "as-Found" and "As-Left" values are recorded without adjustment. If the bistable actuation occurs outside of the tolerance band, an adjustment is performed and the before and after readings are recorded.  ;

1 H-4

O e

4.4 Results The results of the C-E calculations are shown in Table H 1 along with the existing Technical Specification setpoints and allowable values for the ESFAS setpoints. A number of the new setpoint values provide more operating margin than the existing values while still based on the same accident analysis limits. Safety Analysis Setpoints (described in Section 4.2) have been revised in some cases (where indicated below) to provide more operating margin and to reduce the potential for spurious ESF actuation, while still based on the same accident analysis limits.

A discussion of each o'f the setpoint calculations performed by C-E is included in the following:

a) The Low Pressurizer Pressure trip setpoint calculation was revised to reflect more realistic containment environmental conditions for both small and large break LOCA environments, an increased value for transmitter drift and an increased tolerance for PPS bistable functional testing.

The Low Pressurizer Pressure actuation setpoint was recalculated with reduced total channel errors for both large and small break LOCA.

Channel errors for containment pressure and temperature, which are inputs in the setpoint calculations, were revised from 60 psig and 350 degrees F to 5 psig and 250 degrees F, respectively. High Containment Pressure ESFAS trip and SIAS functions are credited in limiting containment temperature to less than 250 degreas F and containment pressure to less than 5 PSIG in considering the worst case environmental errors for Low Pressurizer Pressure SIAS initiation, i' The calculation for low Pressurizer Pressure resulted in a lower actuation setpoint of 1740 psia in place of the existing 1806 psia, i b) The High Containment Pressure trip setpoint calculation was revised to reflect the increased Safety Analysis Setpoint, increased value for I transmitter drift and an increased tolerance for PPS bistable functional testing. '

The High Containment Pressure actuation setpoint was revised from 2.95 psig to 3.4 psig. The associated Safety Analysis Setpoint was increased from 4.0 to 5.0 psig. LOCA analyses do not explicitly credit reactor trip or SIAS on high containment pressure. High containment pressure trip is credited in limiting containment temperature to less than 250 degrees F prior to initiation of a SIAS function. This change in setpoints was evaluated with regard to this criteria, and it was determined that containment temperature will not exceed 250 degrees F prior to containment pressure exceeding 5 psig.

The changes in the limiting containment environmental conditions are ,

described in paragraph a) above. i The increase in the High Containment Pressure trip setpoint causes a slight increase in the tire to initiation of the Containment Isolation H-5 l

TABLE H-1 ESFAS INSTRUMENTATION TRIP SETPOINT LIMITS EXISTING T.S. 3.3.2 PROPOSED T.S. 3.3.2 TRIP ALLOWA8LE TRIP ALLOWABLE FUNCTIONAL UNIT SETPOINT VALUE SETPOINT VALUE

1. SIAS ,

-Cont. Press-Hi s 2.95 psig s 3.14 psig s 3.4 psig s 3.7-psig i

-Pzr. Press-Lo = 1806 psia = 1763 psia = 1740 psia = 1700 psia

2. CSAS

-Cont. Press-Hi s 2.95 psig s 3.14 psig s 3.4 psig s 3.7 psig

-Pzr.-Press-Lo = 1806 psia = 1763 psia = 1740 psia = 1700 psia

-Cont. Press-Hi-Hi s 16.14 psig s 16.83 psig s 14.0 psig s 15.0 psig 3.) CIAS

-Cont. Press-Hi s 2.95 psig s 3.14 psig s 3.4 psig s 3.7 psig 4.) MSIS a 729 psia e 711 psia = 741 psia = 729 psia

-S/G Press-Lo

o TABLE H-1

. (Continued)

ESFAS INSTRtMENTATION TRIP SETPOINT LIMITS EXISTING T.S. 3.3.2 PROPOSED T.S. 3.3.2

  • TRIP ALLOWABLE TRIP ALLOWABLE FUNCTIONAL UNIT SETPOINT VALUE SETPOINT VALLIE 6.) CCAS -

-Cont. Press-Hi s 2.95 psig s 3.14 psig s 3.4 psig s 3.7 psig

-Pzr. Press-to = 1806 psia e 1763 psia e 1740 psia = 1700 psia 8.) EFAS

-S/G (A&B) Level-Lo a 25% = 24.23% = 21% a 20%

-S/G Delta P-Hi (SG-A > SG-8) 5 50 psid s 66.25 psid s 125 psid s 140 psid (SG-B > SG-A) s 50 psid s 66.25 psid s 125 psid s 140 psid

-S/G (A&B) Press-Lo a 729 psia e 711 psia = 741 psia a 729 psia

I c

Actuation System (CIAS) and the Containment Cooling Actuation System (CCAS). Credit is taken for CIAS in limiting the amount of steam released through containment and the minipurge line after a LOCA and in limiting the amount of water lost from the Component Cooling Water (CCW) system critical loop. The impact of the High Containment Pressure trip on the time to closure of the minipurge valves on the Containment Isolation signal was reviewed and determined to be bounded by the existing analysis. The mass releases through the valves are bounded by the present analyses. The slight. increase in time to initiation of CIAS results in a minor reduction in the minimum CCW Surge Tank level of approximately 1%. CCW operability is, therefore, not impacted.'

The CCAS is credited in the containment pressure / temperature analyses for LOCA and Main Steam Line Break (MSLB) events. Review of the containment pressure response to design basis events has confirmed that increasing the High Contair. ment Pressure Safety Analysis Setpoint to 5 PSIG is bounded by existing analyses, c) The Low Steam Generator Water Level actuation setpoint recalculation was revised to reflect a revised Safety Analysis Setpoint, increased value for transmitter drift, a more realistic value for worst case reference leg temperature and an increased tolerance for PPS trip bistable functional testing.

The Low Steam Generator Water Level actuation setpoint was reduced from 25% to 21%.

The associated Safety Analysis Setpoint for EFAS was reduced from 5.0%

to 2.0%. LOCA events do not credit the Low Steam Generator Water Level for the reactor trip function, but do credit EFAS on Low Steam Generator Water Level. Reducing the Safety Analysis setpoint from 5%

to 2% for the EFAS function will still ensure that the steam generator tubes will be sufficiently covered so that there is no significant degradation in the assumed heat transfer during LOCA. The requirement for EFAS actuation for non LOCA events is that it is available to prevent intact steam generators from drying out. The Safety Analysis Setpoint of 2.0% of span provides acceptable results for non-LOCA events, d) The Low Steam Generator Pressure actuation setpoint was calculated based on the increased sensor drift and an increased tolerance for PPS bistable functional _ testing. No change to the existing Safety Analysis Setpoint was required.

e) The Containment Pressure Hi-Hi actuation setpoint was calculated based on the increased sensor drift and an increased tolerance for PPS bistable functional testing. No change to the Safety Analysis Setpoint was required.

f) The High Steam Generator Delta Pressure actuation setpoint was calculated based on the revised sensor drift and an increased H-8

o I

tolerance for PPS bistable functional testing. The actuation setpoint was revised from 50 psid to 125 psid. The associated Safety Analysis Setpoint was increased from 100 psid to 250 psid to allow for more room between the equipment setpoint and the normal variation in delta ,

pressure. C-E reanalyzed the limiting decreased heat removal event (feedwater line break) to demonstrate that the pressurizer will not be filled solid due to the revised setpoint and that the feedwater line break results are bounded by the analysis presented in FSAR Section 15.2.

4.5 Summarv ,

The SONGS Units 2 & 3 ESFAS actuation setpoints were revised based on changes to the Safety Analysis Setpoints and changes in the actuation setpoint calculations. The Safety Analysis Setpoints were revised for low Steam Generator Level, High Containment Pressure and High Steam Generator Delta Pressure actuation functions. These evaluations demonstrate acceptable results when compared to the existing safety analysis limits. The actuation-setpoint calculations for low Pressurizer Pressure, Low Steam Generator Level, High Containment Pressure and High Steam Generator Delta Pressure were revised to improve operating margins while accounting for increased transmitter drift and an increase in the allowed tolerance for actuation bistable functional testing. The actuation setpoint calculations for Low Steam Generator Pressure and High High Containment Pressure were revised to account for increased transmitter drift and an increase in the allowed tolerance for actuation bistable functional testing. These changes to the actuation setpoint calculations preserve the margin of safety while maintaining adequate operating margins.

This reanalysis has met all of the objectives which are: adequate protection for design transients; nominal 24 month calibration intervals; and sufficient operating margins. k_ .

5. RESPONSE TIME TESTING LIMITS All of the Safety Analysis response times were confirmed by C-E to remain acceptable, without any changes required. No technical specification response time changes were required because the response times used in the safety evaluation were not changed.

H-9 l

'4 Figure H-1 C-E Exolicit Method of Trio Setoolnt Determination 4 Safety Design Limits

. 'i f Safety Analysis Setpoint 4 . Total Channel Uncertainty

= RSS( A, B) + A' + B' T/S Allowable Value

)(

Calculated Setpoint 40 to 50 mV margin if T/S Trip Setpoint Normal Operation A. Cau; net Uncertainties (Random) '

A' Cabinet Uncertainties (Non-random)

B. Process instrumentation Uncertainties (Random) k B' Process Instrumentation Uncerta nties_(Non-random)

C. Cabinet Periodic Test Error

4 0-NPF-10/15-280 ATTACHMENT I SONGS UNITS 2 AND 3 REDUNDANT INSTRUMENT MONITORING SYSTEM (RIMS) DESCR f

1.

o ATTACHMENT I REDUNDANT INSTRUMENT MONITORING SYSTEM (RIMS)

Puroose Southern California Edison-(SCE) has developed a system to monitor the Onofre Nuclear Generating Station'(SONGS), Units 2 and 3. ~s called the Redundant Instrument Monitoring System (RIMS).

system is to provide on-line monitoring of the calibration of theseThe purpose of this ,

instruments, with a high degree of accuracy. The system can be used to i identify those performance instruments which are. performing properly and those whose is anomalous. '

The information can then be used to justify the number of calibrations that are required during At the refueling outag same time, the confidence that the instrumentation is operating within design requirements is-increased between calibration intervals.

A second purpose of this system is to support the revised operating schedule.

of 24 month fuel cycles. Where sufficient redundancy exists, RIMS is 4 to the plant computers and main control panels.available to provide on ,

This appendix contains several typical plots to demonstrate the general drift calculations. stability of the SONGS instrumentation and the conservatism of the -!

instr History

-l 1

The design ofchannels.

safety-related SONGS 2 & 3 Plant Protection System includes four redundant I For many parameters, the-number of transmitters is i

even greater, as narrow and wide range monitoring is provided Safety-related transmitters must undergo a calibration check every 18 months.

This calibration check generally consists of applying a simulated condition.to the transmitter and comparing the response of-the transmitter to a standard -

whose calibration is traceable to the National Bureau of TheStandards.

condition and 100% of is full generally scale. simulated at five different levels: 0%;. 25%; 50%;'75%;

to the transmitter, often times inside-containment, isolate the device f the system and perform the calibration check. i The combination of the degree of redundancy and the surv The degree of redundancy also presents the opportunity to make an accurate, 1 on-line source. determination of the process value by averaging the signal from each availabh as inputs to the Plant Monitoring System (PMS) andl Cri ~

I-1 'l

+

..iiiii.i.i.......,,.... . . , , . .. .

1 Functions Monitoring System (CFMS).  !

As a result of these factors, it has become practical to implement a micro-computer based system to perform a calibration checks. check on-line and obviate the need for the traditional ca Monitored Parameters ,

I The following parameters are monitored by RIMS. .These' inputs are grouped as-like parameters.for comparison and analysis purposes:

1. Pressurizer pressure )
2. Pressurizer level i
3. RCS cold leg temp 6rature - Loop 1
4. RCS cold leg temperature - Loop 2
5. RCJ hot leg temperature
6. Containment pressure
7. Refueling water tank level-8, Steam generator level - SG-1
9. Steam generator level - SG-2
10. Steam generator pressure

-11. Nuclear instrumentation - log power  :

12. Nuclear instrumentation - linear power
13. Safety injection tank level
14. Safety injection tank pressure
15. Core-exit thermocouples i

l Method of Analysis

~

Monitoring System for both Units 2 & 3 at 10 minute interval The data i

l The_ average value for each redundant group is then calculated'and the deviatio i from the average is determined in terms of percent of' span.. Appropriate i determine the average. weighting factors are utilized, based on individual instl after it is calibrated to brinA bias is applied to the deviation of each instrument l value for comparison purposes.g all instrument readings.to near the average then trended over time to evaluate the changes in the calibration-sta the instrumentation.

i

(

Instrument calibration is monitored by RIMS during both stead normal transient (heatup and cooldown) operating conditions. y state and )

state operation, comparison of redundant channels over a relatively narrowDuring s range of values provides a high-degree of confidence in differentiatin between changes in calibration and actual changes in plant conditions.g- During '

valuable comparison data is obtained over a larger port range, thereby validating the calibration over.a range of values and the response of redundant channels to actual changes in plant conditions.

Operation and Benefits-t I-2 I I

y

o

- RIMS has been operational for evaluation purposes since October,1988.

Monthly reports of abnormalities detected by RIMS have been forwarded to Station Maintenance for evaluation and action, if required.

Our experience with RIMS to date has confirmed that the monitored instrumentation exhibits extremely stable operation over extended periods of -

time. ,

channels transmitters. over a two month period immediately- prior to reca (Due to the length of Cycle 4, it was necessary to theses figures, it can be-seen that all' of these exhibit stable perforinance.

Fromsafety-related An example of a case where RIMS provided early indication-of a-transmitter abnormality2LT-1113-4 occurred in December,1988 for Unit 2 ' steam generator level 1 transmitter, RIMS output (Figure 5 attached 'i This agreed very well with the "as-found" data from the trans [

calibration performed the following month in January,1989.

The benefits derived from operation of' the system are as follows: i o

j Significantly improved ca during normal operation. pability to detect instrument abnormalities '

the control board indicators provided single point. analysis'inPrevio with associated errors in readability and indicator accuracy. puts o

overall radiation exposure (ALARA) and reducing the fr accelerate equipment aging.surveillances that result in needless cyclin i o

Added capability to reduce maintenance costs concurrent with "

calibration program during refueling o(utages. implementatio reallocation of resources to higher priority maintenance tasks.-This will allow a In summary, the observed abnormalities-(like the example above have confirmed the benefits for use of the system and the generally stable instrumentation. ope) ration of the the conservatism of the calculated instrument drift values. Observation i

i i

I-3 i

_ , _ , _ _ . _ , . .? ..

e Figure I-I ..

REDUNDANT INSTRUMENT MONITORING SYSTEM-UNIT 2 m

' o

/ b RIMS ~

Personal Data Acquisition l

Computer Computer PMS CFMS UNIT 3 -g y(

-n

]

~ ,

_ I/O TEMPLATE

' o

/ _

ONSPEC CONTROL SOPITARE I

  • SUPERINTENDENT SUPERTREND PMs - crus- Alarms R8P lays O

FAnalysis - 0-6/02/88

_ _ _ _ _ _ _ _ . . --. - = . - .=. -- - -_- =- -- - - .

- _. -- . .. .. ... ..~.. - - - -

Figure I-2 Pressurizer Pressure Instrument Drift 'I o0 40 -  ;

30 - ..

n o ' 20 -

O H

H 10 - >  :;

w m w ses w n w' Od g ,

-2alg MWs4 W  ;

2

~

litiliII11ilIIIIIlliIllit..Iiti4.1Illl111111111lll13.lllllll lglllg .igggggggig 3/1 4/1' -

5/1 Date  :.

0 2PT-101-1 & 2PT-101-2. ~ X . 2PT-101-3 V 2PT-101-4 m m.e ax.-- - -y .a -a..'s mm --r ,..--,w .>, wpisgg-- e -a.e um.c =ma-.i- mm.,m.--;._w- -

e .!

Figure I-3 'l

.l Steam Generator Level Instrument Drift 100 90 -

80 -

70 -

~

60 -

50 -

9

- O-40 - - -  ;

S ' ,

d 30 - b .

2 w

Ed

+w r rpm  : 1 2

4 -

1 p l ,

. i

-100  : : : i i i i s i i i s i i i s i i i i i i , i i i i i i i i i i i i i i i i i i i i i i i s i i i i i i i i i i i i i i i i i.i i i I

.3/1 4/1 5/1 Date D 2LT-1113-A + 2LT-lll3-B 0.-2LT-1113-C A 2LT-1113-D.  ;

mM4% m _.g,.h 69Pe 'lh#' pi h h *%M W d4.'#'9'dd.N -_

'N# mX h V " ' " ' - * * - - - ' ' " - ' " * * ' * * - * * ' " ' ' ' " " ' ~ ^ " " " - '

_m__m _____J-*_m._ -___. _m_ . _ _

e

?

i y

i i

i 0 i

2 i

2 '

i 1

i 0 i

T

_ i 1 T 2

/ "

i 5

  • i A

i ~-

T i #'

EN i UE i DM i C.

P i -

EO 2 "

LL i 2

  • BE i 1

0 AV i -

LE T e

i ID T A 2 "

r VE i AR 3 0

A u

i '

TW i t OT i

^

t NF i B

aifr AS O i i 2 4

rD e

T AO DT i

i i

2 1

0

- t -

I e

pne _ .

i i

teT T

2 r a m

i F

u g

mu et r - i-i i /

1' 4

D+.

  • s Tn I M-f- i i "

+ ^

n i

S i i

"4 A

C j

i R

i i h"

=

i J'

B i

i d

a

! i

'm L

i A-i i 2 e i 2 4 1

a i 0 J

. i i -

A i T i T Tq- i i

2 -

^dy i i

D I

m m.

i

~~' ,

i 1

/ a.w 3

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 8 7 6 5 4 3 2 1 2 3 4 5 6 7 8 g 1

_ _01 noo* H K* b g _

i

e

. Figure I-5 *- -

S/G 89 LEVEL, UNIT 2 '

DEVIATIONS FROM AVERAGE 100 .

90 -

80 - -

^ 70 -

o .

O g- -

50 - t M

40 - -

R v

, 30 -

! z 20

  • i o

~

10 -

b 0

^ ^ " " '

1 l

l

-Q r l- 0 -30 1 l A>.

! k ['

! :A -70:-

-100 i. i i i .i i.._i. i i i i i i i i  ; i , , i

12/09 l12/13 12/17 12/21 12/25 12/29 i

DAY ~

- 0 2-LT-1113-1 + 2-LT-1113-2 o .2-LT-1113-3 A 2LT-1113-4 Y.- ..

. -, - - . - - . l- -

. - . _ . .- , , , .