Proposed Tech Specs Providing Followup to Request for Discretionary Enforcement from SR 3.0.3 Requirements Delaying Implementation of SR 3.8.1.14 & 3.8.1.15 of TS 3.8.1,until NRC Approves Revs
ML20133F774
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 01/13/1997
From:
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML20133F767 List:
References
NUDOCS 9701140350
Download: ML20133F774 (2)


Text

1 AC Sources-0perating 3.8.1 i

SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.8.1.14 0 -------------------NOTES----------

=----

1.

Momentary transients outside the load and power factor ranges do not invalidate this test.

2.

Credit may be taken for unplanned events that satisfy this SR.

Verify each DG, when operating with the 24 months maximum kVAR loading permitted during testing, operates for 2 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s:

a.

For 2 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> loaded 2 4935 kW and s 5170 kW; and b.

For the remaining hours of the test loaded 2 4450 kW and s 4700 kW.

)

SR 3.8.1.15 # -------------

--NOTES------------

1.

This Surveillance shall be performed j

within 5 minutes of shutting down the DG after the DG has operated 2 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> loaded 2 4450 kW and s 4700 kW.

Momentary transients outside of load range do not invalidate this test.

2.

All DG starts may be preceded by an engine prelube period.

_ = = - - - = = _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Verify each DG starts and achieves, in 24 months s 10 seconds, voltage 2 3924 V and s 4796 V, and frequency 2 58.8 Hz and s 61.2 Hz; and operates 2 5 minutes.

(continued)

)

SAN ON0FRE--UNIT 3 3.8-11 Amendment No. 116 9701140350 970113 PDR ADOCK 05000362 P

PDR

4 AC Sources - Operating i

3.8-11 4

9 This SR is not applicable until return to Mode 4 from the Unit 3 Cycle 9 refueling outage. Until that time the following SR is applicable:

Verify the diesel generator operates for at least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

During the i

first 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of this test, the diesel generator shall be loaded to greater than or equal to 5170 kw and during the remaining 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> of this test, the diesel generator shall be loaded to greater than or equal to 4700 kw.

The generator voltage and frequency shall be 4360

  • 436 volts and 60
  • 1.2 Hz after the start
  • signal; the steady state generator voltage and frequency shall be maintained at 4360
  • 436 volts and 60+1.2/-0.3Hz for the first 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of this test and 4360
  • 436 volts and 60
  • 1.2 Hz during the remaining 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> of this test.

s

  • The engine start for the purpose of this surveillance test may be preceded by an engine prelube period and/or other warmup procedures recommended by the manufacturer so that mechanical stress and wear on the engine is minimized.

i i This SR is not applicable until return to Mode 4 from the Unit 3 Cycle 9 Refueling Outage. Until that time the following SR is applicable:

Within 5 minutes after completing the 24-hour test, simulate a loss of offsite power by itself, and verify the diesel starts on the auto-start signal, energizes the emergency busses with permanently connected loads within 10 seconds and operates for greater than or equal to 5 minutes while its generator is loaded with the permanently connected loads. After energization, the steady state voltage and frequency of the emergency busses shall be maintained at 4360 1 436 volts and 60 1 1.2 Hz during this test.

SAN ON0FRE -- UNIT 3 3.8-11a AMENDMENT NO.