MONTHYEARML20210P5971999-08-11011 August 1999 Proposed Tech Specs SR 3.3.7.3,replacing Analytical Limits Currently Specified as Acceptance Criteria with Allowable Values,Per Calculation E4C-098,change Notice 25 ML20210P6301999-08-10010 August 1999 Corrected Proposed Tech Specs Re Diesel Generator Testing ML20210N5121999-08-0909 August 1999 Proposed Cycle 10 Update to TS Bases That Have Been Revised Between 980101-990630 ML20195E5171999-06-0808 June 1999 Proposed Tech Specs Pages Re Application for Amend to Licenses NPF-10 & NPF-15,to Revise TS 3.5.2,3.1.9,3.7.1 & 5.1.7.5 ML20207A3911999-05-24024 May 1999 Proposed Tech Specs 3.8,clarifying Bases for SRs 3.8.1.7, 3.8.1.12 & 3.8.1.15 ML20199D0391999-01-13013 January 1999 Proposed Tech Specs Conservatively Restricting Required Actions Completion Time to Close All Containment Penetrations Providing Direct Access from Containment Atmosphere to Outside Atmosphere ML20206R2801999-01-11011 January 1999 Proposed Tech Specs to Increase Min Required Vol of Water in Condensate Storage Tank T-120 from 280,000 to 360,000 Gallons ML20198L6211998-12-31031 December 1998 Proposed Tech Specs 3.3.5 Re ESFAS Instrumentation ML20198G4001998-12-22022 December 1998 Proposed Tech Specs,Allowing SG Tube Repair Using W Laser Welded Sleeving as Alternative SG Tube Repair to Either ABB-CE ML20196H9321998-12-0404 December 1998 Proposed Tech Specs Reducing RCS Temp & Revising Volumetric Min Flow Rate ML20195J9021998-11-23023 November 1998 Proposed Tech Specs Revising TS 3.3.1, RPS Instrumentation - Operating ML20195J9551998-11-23023 November 1998 Proposed Tech Specs Re Turbine Missile Protection ML20155B8741998-10-20020 October 1998 Proposed Tech Specs Adding SR to TS 3.3.9, CR Isolation Signal ML20154J2991998-10-0909 October 1998 Proposed Corrected Tech Specs Pages for 980511 Suppl 1 to Amend Application Re App J,Primary Containment Leakage Testing for water-cooled Power Reactors,Option B ML20153G7511998-09-22022 September 1998 Proposed TSs Revising TS 3.3.1, RPS Instrumentation - Operating, Re Rt Operating Bypass Removal Process Variable ML20151W6801998-09-10010 September 1998 Proposed Tech Specs Eliminating Requirements for Hydrogen Control Sys from Low Power Plant License Conditions 2.C(19)i & from TSs 3.3.11 & 3.6.7 ML20151T6561998-09-0404 September 1998 Proposed Tech Specs Section 3.4.10,increasing as-found Psv Setpoint Tolerances ML20236S6241998-07-22022 July 1998 Proposed Tech Specs Section 3.8.1,extending Offsite Circuit Completion Time from 72 H & 6 Days from Discovery of Failure to Meet LCO to 72 H & 17 Days from Discovery of Failure to Meet LCO ML20249B4291998-06-19019 June 1998 Proposed Tech Specs Changes Reducing Minimum Primary RCS Cold Leg Temp from 544 F to 535 F Between 70% & 100% Rated Thermal Power Levels ML20216B6201998-05-11011 May 1998 Proposed Tech Specs Re App J,Primary Reactor Containment Leakage Testing for water-cooled Power Reactors,Option B ML20216B4141998-05-0707 May 1998 Proposed Tech Specs Pages,Revising TS Section 1.1, Definitions, to Change Reference Used for Obtaining Dose Conversion Factors for Calculating Dose Equivalent I-131 ML20217P8471998-04-0606 April 1998 Proposed Tech Specs Revising Containment Isolation Valves Completion Times ML20216C0051998-03-0606 March 1998 Proposed Tech Specs,Eliminating Ref to Inverters in TS 3.4.12.1 ML20199K6451998-02-0303 February 1998 Proposed Tech Specs 3.5.1,extending Completion Time for Single Inoprable SIT from 1 H to 24 H & Adding New TS 5.5.2.14, Configuration Risk Mgt Program ML20198H8511998-01-0909 January 1998 Proposed Tech Specs 3.5.2 Re Extension of Completion Time for Low Pressure Safety Injection Train ML20198H6881998-01-0909 January 1998 Proposed Tech Specs 3.5.1 Re Extension of Completion Time for Safety Injection Tanks ML20198H7601998-01-0909 January 1998 Proposed Tech Specs 3.8.1 Re Extension of EDG Completion Time ML20198E6051998-01-0202 January 1998 Proposed Tech Specs Pages,Revising TS 3.7.5 & Bases to Indicate Turbine Driven AFW Pump Is Operable When Running in Manual Mode to Support Plant Startups,Shutdowns & Testing ML20197C7281997-12-19019 December 1997 Proposed Tech Specs Reducing Pressurizer Water Level Required for Operability ML20199C6391997-11-14014 November 1997 Proposed Tech Specs,Revising Ufsar,Section 3.5, Missile Protection to Allow Use of Probability of Damage to Critical Components in Evaluating tornado-generated Missile Protection Barriers ML20217A8231997-09-16016 September 1997 Proposed Tech Specs,Allowing SG Tube Repair Using Asea Brown Boveri/Combustion Engineering Leak Tight Sleeving as Alternative SG Tube Repair to Plugging ML20148R4051997-06-30030 June 1997 Proposed Tech Specs Deleting SONGS Unit 2 License Condition 2.C(19)b & Revising SONGS Unit 2 & 3 TS 3.3.1,3.3.2,3.3.5, 3.3.10,3.3.11,3.4.7,3.4.12.1,3.7.5,5.5.2.10 & 5.5.2.11 ML20141B4481997-06-18018 June 1997 Proposed Tech Specs Revising TS 3.8.1, AC Sources - Operating & Applicable Bases to More Clearly Reflect Safety Analysis & Testing Conditions ML20198R0281997-05-30030 May 1997 Proposed Tech Specs Re Revised Bases Pages for Songs,Units 2 & 3 ML20137V2501997-04-15015 April 1997 Proposed Tech Specs 3.8.1, AC Sources - Operating, Revising SR 3.8.1.8 & Applicable Bases Allowing Credit Overlap Testing ML20134P9941997-02-21021 February 1997 Proposed Tech Specs Clarifying Note Which Relays Will Not Be Response Time Tested Until Next Songs,Unit 3 Refueling Outage to Satisfy SR 3.3.5.6 of TS 3.3.5, ESFAS Instrumentation ML20138L1151997-02-18018 February 1997 Proposed Tech Specs Defering Implementation of SR 3.3.5.6 of TS 3.3.5, ESFAS Instrumentation, for 30 Subgroup Relays Until Next Refueling Outage on Songs,Unit 3 ML20134M0831997-02-16016 February 1997 Proposed Tech Specs Re Requirements of SR 3.3.5.6 of TS 3.3.5, ESFAS Instrumentation ML20134J6991997-02-0707 February 1997 Proposed Tech Specs SR 3.1.5.4, CEA Alignment ML20134G7911997-02-0606 February 1997 Proposed Tech Specs 3.1.5, CEA Alignment ML20134A9911997-01-24024 January 1997 Proposed Tech Specs Revising SR 3.8.1.9 to TS 3.8.1, AC Sources - Operating, Which More Accurately Reflects Safety Analysis Conditions ML20133G9101997-01-14014 January 1997 Proposed Tech Specs 3.8.1.14 & 3.8.1.15, AC Sources - Operating, Surveillance Requirements ML20133F7741997-01-13013 January 1997 Proposed Tech Specs Providing Followup to Request for Discretionary Enforcement from SR 3.0.3 Requirements Delaying Implementation of SR 3.8.1.14 & 3.8.1.15 of TS 3.8.1,until NRC Approves Revs ML20128P3631996-10-11011 October 1996 Proposed Tech Specs Reinstating Provisions of TS Revised as Part of Amends 127 & 116 ML20117K9931996-08-30030 August 1996 Proposed Tech Specs,Clarifying Figures 3.7.18-1 & 3.7.18-2 by Adding Line at 4.8 W/O Initial U-235 Enrichment to Explicity Show That Acceptable Zone of Operation Ends at Maximum of 4.8 W/O ML20116C6801996-07-29029 July 1996 Proposed Tech Specs,Consisting of Change Request 443, Permitting Increase in Licensed Storage Capacity of Spent Fuel Pools,By Allowing Spent Fuel to Be Consolidated After Min Required Time in SFPs ML20113C2561996-06-25025 June 1996 Proposed Tech Specs,Revising TS 3.3.11, Pami, & 5.5.2.13, Diesel Fuel Oil Testing Program ML20117L0611996-06-11011 June 1996 Revised Proposed Tech Specs Re LCO 3.3.11, Post Accident Monitoring Instrumentation (Pami) ML20112D4611996-06-0303 June 1996 Proposed Tech Specs,Reinstating Provisions of Current SONGS TS Revised as Part of NRC Amends 127 & 116 ML20117J8391996-05-30030 May 1996 Proposed Tech Specs,Consisting of Change Number 164, Requesting Changes to SR 3.6.1.1,SR 3.6.2.1 & SR 3.6.3.6 Which Allows Implementation of Option B to 10CFR50,App J 1999-08-09
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211B2381999-08-31031 August 1999 Revised Interjurisdictional Policy for Songs ML20210P5971999-08-11011 August 1999 Proposed Tech Specs SR 3.3.7.3,replacing Analytical Limits Currently Specified as Acceptance Criteria with Allowable Values,Per Calculation E4C-098,change Notice 25 ML20210P6301999-08-10010 August 1999 Corrected Proposed Tech Specs Re Diesel Generator Testing ML20210N5121999-08-0909 August 1999 Proposed Cycle 10 Update to TS Bases That Have Been Revised Between 980101-990630 ML20196A9981999-06-17017 June 1999 Revised Pages to Risk-Informed IST Program for Sce ML20195E5171999-06-0808 June 1999 Proposed Tech Specs Pages Re Application for Amend to Licenses NPF-10 & NPF-15,to Revise TS 3.5.2,3.1.9,3.7.1 & 5.1.7.5 ML20207A3911999-05-24024 May 1999 Proposed Tech Specs 3.8,clarifying Bases for SRs 3.8.1.7, 3.8.1.12 & 3.8.1.15 ML20216D9741999-05-0707 May 1999 Rev 3 to Abnormal Operating Instruction SO23-13-14, Reactor Coolant Leak ML20199D0391999-01-13013 January 1999 Proposed Tech Specs Conservatively Restricting Required Actions Completion Time to Close All Containment Penetrations Providing Direct Access from Containment Atmosphere to Outside Atmosphere ML20206R2801999-01-11011 January 1999 Proposed Tech Specs to Increase Min Required Vol of Water in Condensate Storage Tank T-120 from 280,000 to 360,000 Gallons ML20198L6211998-12-31031 December 1998 Proposed Tech Specs 3.3.5 Re ESFAS Instrumentation ML20198L5111998-12-23023 December 1998 Rev 0 to SONGS Risk-Informed Inservice Testing Program, Engineering Analysis & Program Description ML20198G4001998-12-22022 December 1998 Proposed Tech Specs,Allowing SG Tube Repair Using W Laser Welded Sleeving as Alternative SG Tube Repair to Either ABB-CE ML20196H9321998-12-0404 December 1998 Proposed Tech Specs Reducing RCS Temp & Revising Volumetric Min Flow Rate ML20195J9021998-11-23023 November 1998 Proposed Tech Specs Revising TS 3.3.1, RPS Instrumentation - Operating ML20195J9551998-11-23023 November 1998 Proposed Tech Specs Re Turbine Missile Protection ML20155B8741998-10-20020 October 1998 Proposed Tech Specs Adding SR to TS 3.3.9, CR Isolation Signal ML20154J2991998-10-0909 October 1998 Proposed Corrected Tech Specs Pages for 980511 Suppl 1 to Amend Application Re App J,Primary Containment Leakage Testing for water-cooled Power Reactors,Option B ML20153G7511998-09-22022 September 1998 Proposed TSs Revising TS 3.3.1, RPS Instrumentation - Operating, Re Rt Operating Bypass Removal Process Variable ML20151W6801998-09-10010 September 1998 Proposed Tech Specs Eliminating Requirements for Hydrogen Control Sys from Low Power Plant License Conditions 2.C(19)i & from TSs 3.3.11 & 3.6.7 ML20151T6561998-09-0404 September 1998 Proposed Tech Specs Section 3.4.10,increasing as-found Psv Setpoint Tolerances ML20206N5381998-08-12012 August 1998 Rev 15 to Emergency Operating Instruction S023-12-7, Loss of Forced Circulation/Loss of Offsite Power, Pages 1,3,18, 39 & 122 ML20236S6241998-07-22022 July 1998 Proposed Tech Specs Section 3.8.1,extending Offsite Circuit Completion Time from 72 H & 6 Days from Discovery of Failure to Meet LCO to 72 H & 17 Days from Discovery of Failure to Meet LCO ML20249B4291998-06-19019 June 1998 Proposed Tech Specs Changes Reducing Minimum Primary RCS Cold Leg Temp from 544 F to 535 F Between 70% & 100% Rated Thermal Power Levels ML20216B6201998-05-11011 May 1998 Proposed Tech Specs Re App J,Primary Reactor Containment Leakage Testing for water-cooled Power Reactors,Option B ML20216B4141998-05-0707 May 1998 Proposed Tech Specs Pages,Revising TS Section 1.1, Definitions, to Change Reference Used for Obtaining Dose Conversion Factors for Calculating Dose Equivalent I-131 ML20217P8471998-04-0606 April 1998 Proposed Tech Specs Revising Containment Isolation Valves Completion Times ML20206N5231998-03-16016 March 1998 Rev 15 to Emergency Operating Instruction S023-12-1, Std Post Trip Actions ML20216C0051998-03-0606 March 1998 Proposed Tech Specs,Eliminating Ref to Inverters in TS 3.4.12.1 ML20206E6001998-02-27027 February 1998 Rev 31 to S023-ODCM, SONGS Units 2 & 3 Odcm ML20199K6451998-02-0303 February 1998 Proposed Tech Specs 3.5.1,extending Completion Time for Single Inoprable SIT from 1 H to 24 H & Adding New TS 5.5.2.14, Configuration Risk Mgt Program ML20206N5021998-01-30030 January 1998 Temporary Change Notice 2-1 to Rev 2 to Alarm Response Instruction S023-15-50.A1, Annunciator Panel,50A Pzr/Cea Windows 1-30, Pages 1,3,14,15 & 62-64 ML20198H8511998-01-0909 January 1998 Proposed Tech Specs 3.5.2 Re Extension of Completion Time for Low Pressure Safety Injection Train ML20198H7601998-01-0909 January 1998 Proposed Tech Specs 3.8.1 Re Extension of EDG Completion Time ML20198H6881998-01-0909 January 1998 Proposed Tech Specs 3.5.1 Re Extension of Completion Time for Safety Injection Tanks ML20198E6051998-01-0202 January 1998 Proposed Tech Specs Pages,Revising TS 3.7.5 & Bases to Indicate Turbine Driven AFW Pump Is Operable When Running in Manual Mode to Support Plant Startups,Shutdowns & Testing ML20197C7281997-12-19019 December 1997 Proposed Tech Specs Reducing Pressurizer Water Level Required for Operability ML20199C6391997-11-14014 November 1997 Proposed Tech Specs,Revising Ufsar,Section 3.5, Missile Protection to Allow Use of Probability of Damage to Critical Components in Evaluating tornado-generated Missile Protection Barriers ML20198P4011997-10-31031 October 1997 Rev 2 to Document 90022, Susceptibility of RCS Alloy 600 Nozzles to Primary Water Stress Corrosion Cracking & Replacement Program Plan ML20217K0081997-10-16016 October 1997 Rev 1 to Evaluation of SONGS Unit 3 SG Eggcrate Support Condition-Cycle 9 ML20217A8231997-09-16016 September 1997 Proposed Tech Specs,Allowing SG Tube Repair Using Asea Brown Boveri/Combustion Engineering Leak Tight Sleeving as Alternative SG Tube Repair to Plugging ML20203E1201997-09-11011 September 1997 Rev 1 to S-PENG-DR-003, Addendum to Piping Analytical Stress Rept for SCE San Onofre Units 2 & 3. W/Memo from C Chiu to Jt Reilly Re Corrective Action for Unit 3 Pressurizer Nozzle Failure in Mar 1986 ML20203D8421997-08-28028 August 1997 Rev 1 to S-PENG-DR-002, Addendum to Pressurizer Analytical Stress Rept for SCE San Onofre Units 2 & 3 ML20203D8981997-07-0303 July 1997 Rev 0 to TR-PENG-042, Test Rept for Mnsa Hydrostatic & Thermal Cycle Tests ML20203D8761997-07-0202 July 1997 Rev 0 to TR-PENG-033, Seismic Qualification of San Onofre, Units 2 & 3 Mnsa Clamps for Pressurizer Instrument Nozzles & RTD Hot Leg Nozzles ML20148R4051997-06-30030 June 1997 Proposed Tech Specs Deleting SONGS Unit 2 License Condition 2.C(19)b & Revising SONGS Unit 2 & 3 TS 3.3.1,3.3.2,3.3.5, 3.3.10,3.3.11,3.4.7,3.4.12.1,3.7.5,5.5.2.10 & 5.5.2.11 ML20141B4481997-06-18018 June 1997 Proposed Tech Specs Revising TS 3.8.1, AC Sources - Operating & Applicable Bases to More Clearly Reflect Safety Analysis & Testing Conditions ML20198R0281997-05-30030 May 1997 Proposed Tech Specs Re Revised Bases Pages for Songs,Units 2 & 3 ML20217P9981997-05-28028 May 1997 Rev 30 to SONGS Unit 2 & 3, Odcm ML20137V2501997-04-15015 April 1997 Proposed Tech Specs 3.8.1, AC Sources - Operating, Revising SR 3.8.1.8 & Applicable Bases Allowing Credit Overlap Testing 1999-08-09
[Table view] |
Text
, -.... -. -.
. -. -.... ~.... -.... -
.. ~ ~. - -
s 1
NPF-10/15-476 1
1 L
ATTACNNENT "A" (ExistingSpecifications)
Unit 3 9701160214 970114 PDR ADOCK 05000361 P
PDR
AC Sources-Operating 3.8.1 SURVEILLANCE REOUIRENENTS (continued)
SURVEILLANCE FREQUENCY, SR 3.8.1.14
NOTES-------------------
{
1.
Momentary transients outside the load and power factor ranges do not invalidate this test.
2.
Credit may be taken for unplanned events that satisfy this SR.
==___
Verify each DG, when operating with the 24 months maximum kVAR lotding permitted during testing, operates for 2 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s:
a.
For 2 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> loaded 2 4935 kW and s 5170 kW; and b.
For the remaining hours of the test loaded 2 4450 kW and s 4700 kW.
]
I SR 3.8.1.15
NOTES-------------------
1.
This Surveillance shall be performed within 5 minutes of shutting down the DG after the DG has operated 2 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> loaded 2 4450 kW and s 4700 kW.
Momentary transients outside of load range do not invalidate this test.
2.
All DG starts may be preceded by an engine prelube period.
__=___
Verify each DG starts and achieves, in 24 months s 10 seconds, voltage 2 3924 V and 5 4796 V, and frequency 2 58.8 Hz and s 61.2 Hz; and operates 2 5 minutes.
(continued)
SAN ON0FRE--UNIT 3 3.8-11 Amendment No. 116
d AC Sources-Operating B 3.8.1 BASES SURVEILLANCE ~
SR 3.8.1.13 (continued)
REQUIREMENTS The SR is modified by a Note which acknowledges that credit i
may be taken for unplanned events that satisfy this SR.
i SR 3.8.1.14 1
Regulatory Guide 1.9 (Ref. 3), requires demonstration once j
per refueling outage that the DGs can start and run continuously at full load capability for an interval of not less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, it 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of which is at load equivalent to 105% to 110% of the continuous duty rating and the e
remainder of the time at a load equivalent to 90% to 100% of the continuous duty rating of the DG. The DG starts for this Surveillance can be performed either from standby or hot conditions. The provisions for prelubricating and warmup, discussed in SR 3.8.1.2, and for gradual loading, discussed in SR 3.8.1.3, are applicable to this SR.
1 In order to ensure that the DG is tested under load conditions that are as close to design conditions as possible, testing is performed using the maximum kVAR loading permitted during testing. This loading represents the inductive loading that the DG would experience and is consistent with Regulatory Guide 1.9 (Ref. 3). The load band is provided to avoid routine overloading of the DG.
routine overloading may result in more frequent teardown inspections in accordance with vendor recommendations in j
order to maintain DG OPERABILITY.
The 24 month Frequency is consistent with the recommendations of Regulatory Guide 1.9, (Ref. 3), takes into consideration unit conditions required to perform the Surveillance, and is intended to be consistent with expected fuel cycle lengths.
This Surveillance is modified by two Notes.
Note I states that momentary transients due to changing bus loads do not invalidate this test. Similarly, momentary power factor transients above the power factor limit will not invalidate the test. Note 2 acknowledges that credit may be taken for unplanned events that satisfy this SR, (continued)
SAN ONOFRE--UNIT 3 8 3.8-23 Amendment No. 116
W o
.y AC Sources-Operating
]
B 3.8.1 i
BASES.
1 l
SURVEILLANCE SR 3.8.1.15 REQUIREMENTS i
(continued)
This Surveillance demonstrates that the diesel engine can restart from a hot condition, such as subsequent to shutdown 1
from normal Surveillances, and achieve the required voltage and frequency within 10 seconds. The 10 second time is i
derived from the requirements of the accident analysis to respond to a design basis large break LOCA. The 24 month i
Frequency is consistent with the recommendations of Regulatory Guide 1.9 (Ref. 3) and is intended to be consistent with expected fuel cycle lengths.
This SR is modified by two Notes. Note 1 ensures that the test is performed with the diesel sufficiently hot. The i
load band is provided to avoid routine overloading of the l
i DG.
Routine overloads may result in more frequent teardown inspections in accordance with vendor recommendations in order to maintain DG OPERABILITY. The requirement that the l
t diesal has operated for at least 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> at full load conditions prior to performance of this Surveillance is based on manufacturer recommendations for achieving hot conditions. Momentary transients due to changing bus loads do not invalidate this test. Note 2 allows all DG starts to l
i be preceded by an engine prelube period to minimize wear and j
tear on the diesel during testing.
i SR 3.8.1.16 i
As required by Regulatory Guide 1.9 (Ref. 3), this Surveillance ensures synchronization and automatic load j
transfer from the DG to the offsite source can be made and that the DG can be returned to ready to load status when j
offsite power is restored.
It also ensures that the auto-start logic is reset to allow the DG to reload if a subsequent loss of offsite power occurs. The DG is 4
considered to be in ready to load status when the DG is at rated speed and voltage, the output breaker is open and can I
receive an autoclose signal on bus undervoltage, and the load sequence timers are reset.
The frequency of 24 months is consistent with the recommendations of Regulatory Guide 1.9 (Ref. 3), takes into consideration unit conditions required to perform the (continued)
SAN ONOFRE--UNIT 3 B 3.8-24 Amendment No. 116 1
NPF-10/15-476 i
l ATTACHMENT "B"
)
(ProposedSpecifications)
Unit 3
AC Sources-Operating 3.8.1 4
i SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY I
I
[1.------------------NOTES-------------D SR 3.8.1.14 Momentary transients outside the load and power factor ranges do not invalidate this test.
2.
Credit may be taken for unplanned events that satisfy this SR.
Verify each DG, when operating with the 24 months maximum kVAR loading permitted during testing, operates for 2 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s:
a.
For 2 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> loaded 2 4935 kW and s 5170 kW; and b.
For the remaining hours of the test loaded 2 4450 kW and s 4700 kW.
J SR 3.8.1.15
NOTES------
M 1.
This Surveillance shall be performed within 5 minutes of shutting down the DG after the DG has operated 2 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> g
loaded 2 4450 kW and s 4700 kW.
Momentary transients outside of load range do not invalidate this test.
2.
All DG starts may be preceded by an engine prelube period.
Verify each DG starts and achieves, in 24 months s 10 seconds, voltage 2 3924 V and s 4796 V, and frequency 2 58.8 Hz and Q61.2Hz;andoperates25 minutes.
(continued) t SAN ONOFRE--UNIT 2 3.8-11 Amendment No. 127
_ _ ~..
1 Doc,ument. Control Desk AC Sources - Operating 3.8-11 9'This SR is not applicable until the next test scheduled to occur during the Unit 3 Cycle 9 refueling outage. Until that time the following SR is applicable:
l Verify the diesel generator operates for at least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
During the first 2 l
hours of this test, the diesel generator shall be loaded to greater than or equal to 5170 kw and during the remaining 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> of this test, the diesel generator shall be loaded to greater than or equal to 4700 kw.
The generator voltage and frequency shall be 4360
- signal; the steady state generator voltage and frequency shall be maintained at 4360
- 436 volts and 60 + 1.2 / -0.3 Hz for the first 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of this test and 4360
- 1.2 Hz during the remaining 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> of this test.
- The engine start for the purpose of this surveillance test may be preceded by an engine prelube period and/or other warmup procedures recommended by the manufacturer'so that mechanical stress and wear on the engine is minimized.
- This SR is not applicable until the next test scheduled to occur during the Unit 3 Cycle 9 Refueling Outage. Until that time the following SR is applicable:
Within 5 minutes after completing the 24-hour test, simulate a loss of offsite power by itself, and verify the diesel starts on the auto-start signal, energizes the emergency busses with permanently connected loads within 10 seconds and operates for greater than or equal to 5 minutes while its generator is loaded with the permanently connected loads. After energization, the steady state voltage and frequency of the emergency busses shall be maintained at 4360 1 436 volts and 60 l
i 1.2 Hz during this test.
SAN ON0FRE -- UNIT 3 3.8-11a AMENDMENT N0.
AC Sources-Operating B 3.8.1 BASES 1
l SURVEILLANCE SR 3.8.1.13 (continued)
REQUIREMENTS The SR is modified by a Note which acknowledges that credit may be taken for unplanned events that satisfy this SR.
a i
l SR 3.8.1.14 i
fifegulatory Guide 1.9 (Ref. 3), requires demonstration once i
per refueling outage that the DGs can start and run continuously at full load capability for an interval of not
{
1ess than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, ;t 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of which is at load equivalent to 105% to 110% of the continuous duty rating and the remainder of the time at a load equivalent to 90% to :.00% of who enntininntic da+u
=+4aa nf the DG I The DG starts for this Surveillance 'can be performed either from standby or 1
hot conditions. The provisions for prelubricating and warmup, discussed in SR 3.8.1.2, and for gradual loading, discussed in SR 3.8.1.3, are applicable to this SR.
In order to ensure that the DG is tested under load conditions that are as close to design conditions as possible, testing is performed using the maximum kVAR loading permitted during testing. This loading represents the inductive loading that the DG would exoerien nd Isl ponsistent with Regulatory Guide 1.9 (Net. 3 load 8
band is provided to avoid routine overloadin f the DG.
routine overloading may result-in more frequent teardown inspections in accordance with vendor recommendations in er to maintain DG OPERABILITY.
The 24 month Frequency is consistent with the recommendations of Regulatory Guido 1.9, (Ref. 3), takes into consideration unit conditions required to perform the Surveillance, and is intended to be consistent with expected fuel cycle lengths.
This Surveillance is modified by two Notes.
Note I states that momentary transients due to changing bus loads do not invalidate this test. Similarly, momentary power factor transients above the power factor limit will not invalidate the test. Note 2 acknowledges that credit may be taken for unplanned events that satisfy this SR.
(continued)
SAN ON0FRE--UNIT 3 8 3.8-23 Amendment No. 116
~
1 t,
e AC Sources-0perating B 3.8.1 BASES
$ This provision is not applicable until performance of the new (post-TSIP) SRs in the Unit 3 Cycle 9 outage.
i SAN ONOFRE -- UNIT 3 B 3.8-23a AMENDMENT N0.
ab AC Sources-Operating B 3.8.1 BASES SURVEILLANCE SR 3.8.1.15 REQUIREMENTS l
(continued)
This Surveillance demonstrates that the diesel engine can restart from a hot condition, such as subsequent to shutdown from normal Surveillances, and achieve the required voltage and frequency within 10 seconds. The 10 second time is derived from the requirements of the accident analysis to respond to a design basis large break LOCA. The 24 month Frequency is consistent with the recommendations of Regulatory Guide 1.9 (Ref. 3) and is intended to be consistent with expected fuel cycle lengths.
1 This SR is modified by two Notes. Note 1 ensures that the test is performed with the diesel sufficiently hot.
't=d h v. v. iu=:u i.o avoio rouune um 6dinf of the DG.
Routine overloads may result in more frequelit teardown l
nspections in accordance with vendor reco=nandations in J
er to maintain Oc noroaRitITY.J ine requirement that the diesei nas operated for at leasT2 hours at full load conditions prior to performance of this Surveillance is based on manufacturer recommendations for achieving hot conditions. Momentary transients due to changing bus loads do not invalidate this test. Note 2 allows all DG starts to be preceded by an engine prelube period to minimize wear and tear on the diesel during testing.
SR 3.8.1.16 As required by Regulatory Guide 1.9 (Ref. 3), this Surveillance ensures synchronization and automatic load transfer from the DG to the offsite source can be made and that the DG can be returned to ready to load status when offsite power is restored.
It also ensures that the auto-start logic is reset to allow the DG to reload if a subsequent loss of offsite power occurs. The DG is considered to be in ready to load status when the DG is at rated speed and voltage, the output breaker is open and can receive an autoclose signal on bus undervoltage, and the load sequence timers are reset.
The Frequency of 24 months is consistent with the recommendations of Regulatory Guide 1.9 (Ref. 3), takes into consideration unit conditions required to perform the (continued)
SAN ONOFRE--UNIT 3 8 3.8-24 Amendment No. 116 m